Preferred Language
Articles
/
nxfeYI4BVTCNdQwCcUX2
Construction of co-zeolitic imidazolate framework/Bi2WO6 heterojunction photocatalyst with improved adsorption and photodegradation of ciprofloxacin
...Show More Authors

Scopus Clarivate Crossref
View Publication
Publication Date
Sun Mar 01 2015
Journal Name
Journal Of The Chilean Chemical Society
NEW AZO-SCHIFF BASE DERIVED WITH Ni(II), Co(II), Cu(II), Pd(II) AND Pt(II) COMPLEXES: PREPARATION, SPECTROSCOPIC INVESTIGATION, STRUCTURAL STUDIES AND BIOLOGICAL ACTIVITY
...Show More Authors

The coordination ability of the azo-Schiff base 2-[1,5-Dimethyl-3-[2-(5-methyl-1H-indol-3-yl)-ethyl imino]-2-phenyl-2,3-dihydro-1H-pyrazol-4-ylazo]-5- hydroxy-benzoic acid has been proven in complexation reactions with Co(II), Ni(II), Cu(II), Pd(II) and Pt(II) ions. The free ligand (LH) and its complexes were characterized using elemental analysis, determination of metal concentration, magnetic susceptibility, molar conductivity, FTIR, Uv-Vis, (1H, 13C) NMR spectra, mass spectra and thermal analysis (TGA). The results confirmed the coordination of the ligand through the nitrogen of the azomethine, Azo group (Azo) and the carboxylate ion with the metal ions. The activation thermodynamic parameters, such as ΔE*, ΔH*, ΔS*, ΔG*and K are cal

... Show More
View Publication Preview PDF
Scopus (44)
Crossref (29)
Scopus Clarivate Crossref
Publication Date
Fri Mar 31 2017
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
The Influence of Eggshell Particle Sizes on the Adsorption of Organic Dye
...Show More Authors

This work aimed to use effective, low-cost, available, and natural adsorbents like eggshells for removal of  hazardous organic dye result from widely number of  industries and study the influence of different eggshell particle size (75, 150) Mm.  The adsorbent was characterized by SEM, EDX, BET and FTIR . The initial pH of dye solutions  varying from 4 to 10 , the initial concentrations of methyl violet (MV) 2B range (20-80) mg/L, dosage range (0.5-10) g, contact time (30-180) min, and particles size of the adsorbent (75, 150) Mm were selected to be studied. Two adsorption isotherms models have been used to fit the experimental data. Langmuir and Freunlich models were found to more represent the experiments with high

... Show More
View Publication Preview PDF
Publication Date
Thu Mar 30 2023
Journal Name
Iraqi Journal Of Science
Theoretical Study of Bonds length, Energetic and Vibration Frequencies for Construction Units of (6,0) ZigZag SWCNTs
...Show More Authors

Density Functional Theory (DFT) calculation of the type (B3LYP) and 6-311G basis set level using Gaussian-03 program were carried out for equilibrium geometry of construction units of (6,0) linear ZigZag SWCNT (mono, Di, Tri and Tetra ring layers), to evaluate the geometrical structure (bond length), symmetries, physical properties and energetic such as standard heat of formation (ΔH0f), total energy (Etot.), dipole moment (μ), Highest Occupied Molecular Orbital Energy (EHOMO), Lowest Unoccupied Molecular Orbital Energy (ELUMO), energy gap (ΔEHOMO-LUMO), the distribution of electron density () and vibration frequencies, all at their equilibrium geometries. Assignment of the vibration frequencies according to the group theory was do

... Show More
View Publication Preview PDF
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Tue Dec 01 2015
Journal Name
Journal Of Engineering
Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq
...Show More Authors

Construction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.

The research aims first to the effective planning for analysis and risk managemen

... Show More
View Publication Preview PDF
Publication Date
Sat Jan 11 2025
Journal Name
Journal Of Engineering
Construction of a General-Purpose Infrastructure for Rfid – Based Applications
...Show More Authors

View Publication
Publication Date
Sun Jan 01 2012
Journal Name
Conference
Identifying Causes of Variation in Construction Industry Based on Questionnaire
...Show More Authors

Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
The Cost of Technology Transfer in Construction Companies (In Iraq)
...Show More Authors

The construction sector is considered an important and influential pivot in the national economy of any country.  Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Oct 02 2023
Journal Name
Journal Of Engineering
Main Delay Factors of Implementation EPC Construction Projects in Iraq
...Show More Authors

This essay aims to highlight the most important issues and difficulties facing implementing large projects that follow the turn-key method, considered one of the types of contractual methods in Iraq, especially for large and complex projects requiring speedy completion. The projects implemented in this way face delays and delays in completion, which led to the lack of benefit from the projects for which they were implemented, especially those affecting the lives of citizens within the health sector. The case study dealt with the construction of hospitals with multi-bed capacities within multiple governorates in Iraq, With large financial allocations within the federal budget of the Government of Iraq over several years.

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
The Impact of Construction Systems Technology in Contemporary Architectural Product
...Show More Authors

This research examines the impact of construction technology systems in contemporary architectural production through the study of the evolution in it systems, construction materials and methods of construction in addition to the digital revolution which provided possibilities of structural and architectural design in creating a distinct architectural product, as considered construction systems technology is the source of creativity in the architectural product, the research is assumed that the construction systems technology have achieved a structural innovation in production through the materials and methods of construction and digital design.
For Long time technology was connected to the

... Show More
View Publication Preview PDF
Crossref