Radiological assessment for the East Baghdad oilfield-southern part was conducted in the current study. 10 samples (scale, soil, sludge, water, and oil) from the different stages of oil production were collected. 232Th, 226Ra, and 40K in the samples were analyzed with 40% efficiency for Gamma spectrometry. system based on HPGe. The findings indicated that the examined sites exhibit comparatively lower levels of NORM contamination, in contrast to other global oilfields. Nevertheless, certain areas, particularly those within separation stages, demonstrate relatively elevated NORM concentrations exceeding the global average in soil and sludge. The maximum value of 226Ra, 232Th, was found in sludge sample the findings indicated that over 70% of the sampled locations exhibited concentrations of Norm that surpassed the worldwide average values. The highest exposure dose rate readings within the study areas reached 0.13 µSv/h, which exceeds the worldwide dose rate of 58 nGy/h as reported by UNSCEAR. Radiation exposure dose and hazard indices were calculated using the concentrations of 232Th,226Ra and 40K within samples. Indeed, the indices encompass various factors, these metrics provide a comprehensive understanding of the radiation exposure and associated risks. The study indicated that the relatively more contaminated stages within the oil production stages are the 1st separation stage, desalter stage and the waste pit stage where the higher concentrations of 226Ra, 232Th and exposure rates are recorded. Generally, the site exposes dose rate within an acceptable rate. Generally, the values of all hazard indices indicate that samples of some locations have values higher than the values recommended by UNSCEAR and ICRP.
The reserve estimation process is continuous during the life of the field due to risk and inaccuracy that are considered an endemic problem thereby must be studied. Furthermore, the truth and properly defined hydrocarbon content can be identified just only at the field depletion. As a result, reserve estimation challenge is a function of time and available data. Reserve estimation can be divided into five types: analogy, volumetric, decline curve analysis, material balance and reservoir simulation, each of them differs from another to the kind of data required. The choice of the suitable and appropriate method relies on reservoir maturity, heterogeneity in the reservoir and data acquisition required. In this research, three types of rese
... Show MoreBackground: Among individuals who have a stenotic aortic valve, a precise assessment of aortic valve area is essential for clinical judgment. So far, no studies have been conducted to investigate and assess the role of the three dimensional echo-cardiography in the assessment of the valve stenosis. This study aims to compare and assess the precision of the measurement of the stenosis area of the aortic valve by 2D versus 3D echo-cardiography.
Multiple drilling problems are being faced continuously while drilling wells in the southern Iraqi oil fields. Many of which are handled poorly and inefficiently which yields longer non-productive time due to the lack of knowledge about the source of these problems. This study aims to investigate the Basra oil fields formations from Faris to Mishrif, diagnose the potential problems, and present the optimum treatment for each problem.
Gathering of field data and previous studies on the subject, in addition to the field experience of drilling supervisors were all the information bases of this study. Southern Iraqi oil fields were studied and analyzed care
Static reservoir modeling is the interacting and analysis of the geological data to visualize the reservoir framework by three-dimensional model and distribute the static reservoir properties. The Petrel E&P software used to incorporate the data. The interpreted log data and core report used in distribution of petrophysical properties of porosity, water saturation and permeability for Zubair reservoir in Luhais oil field.
The reservoir discretized to 274968 cells in increments of 300, 200 and 1 meter in the direction of X, Y, and Z respectively. The geostatistical approach used in the distribution of the properties of porosity and water saturation overall the reservoir units. The permeability has been calculated
... Show MoreGas lift is one of the artificial lift techniques which it is frequently implemented to raise oil production. Conventionally, the oil wells produce depending on the energy of reservoir pressure and solution gas which declines due to continuous production. Therefore, many oil wells after a certain production time become unable to lift oil to the surface. Thus, the continuity of production requires implementation of gas lift which works to decrease the average fluid density in the tubing by injection gas through the annulus into the tubing. This paper aims to get maximum oil production of an Iraqi giant oil field at optimum injected gas rate. The field is located in south of Iraq and in
A modified water injection technique has organized by this study to improve oil recovery of the Mishrif reservoirs using polymerized alkaline surfactant water (PAS-Water) injection. It is planned to modify the existing water injection technology, first to control and balance the hazardous troublemaker reservoir facies of fifty-micron pore sizes with over 500 millidarcies permeability, along with the non-troublemaker types of less than twenty micron pore sizes with 45 to 100 millidarcies permeability. Second to control Mishrif reservoirs rock-wettability. Special core analysis under reservoir conditions of 2250 psi and 90 °C has carried out on tens of standard core plugs with heterogeneous buildup, using the proposed renewal water f
... Show More
To identify the importance of the role of succession planning in developing human capital in organizations in light of the accelerating and dynamic events and changes in the work environment, and the research problem indicated the seriousness of employees retiring or leaving their positions for any reason and the extent of its impact on the organization in creating gaps in leadership and problems In managing the talent injection because there will be a shortage of talent, which in turn will affect the general performance of the business in the researched institute, so the importance of research appears in trying to present a set of solutions through which some of the problems facing the organization in quest
... Show MoreStudy of determining the optimal future field development has been done in a sector of South Rumaila oil field/ main pay. The aspects of net present value (economic evaluation) as objective function have been adopted in the present study.
Many different future prediction cases have been studied to determine the optimal production future scenario. The first future scenario was without water injection and the second and third with 7500 surface bbls/day and 15000 surface bbls/day water injection per well, respectively. At the beginning, the runs have been made to 2028 years, the results showed that the optimal future scenario is continuing without water in
This research had been achieved to identify the image of the subsurface structure representing the Tertiary period in the Galabat Field northeast of Iraq using 2D seismic survey measurements. Synthetic seismograms of the Galabat-3 well were generated in order to identify and pick the reflectors in seismic sections. Structural Images were drawn in the time domain and then converted to the depth domain by using average velocities. Structurally, seismic sections illustrate these reflectors are affected by two reverse faults affected on the Jeribe Formation and the layers below with the increase in the density of the reverse faults in the northern division. The structural maps show Galabat field, which consists of longitudinal Asymmetrical narr
... Show More