The main parameter that drives oil industry contract investment and set up economic feasibility study for approving field development plan is hydrocarbon reservoir potential. So a qualified experience should be deeply afforded to correctly evaluate hydrocarbons reserve by applying different techniques at each phase of field management, through collecting and using valid and representative data sources, starting from exploration phase and tune-up by development phase. Commonly, volumetric calculation is the main technique for estimate reservoir potential using available information at exploration stage which is quite few data; in most cases, this technique estimate big figure of reserve. In this study case, volumetric calculation estimate gas initial in place (GIIP) value almost two times bigger than other techniques estimation of actual reservoir potential; it is a result of Asphiltena “Bitumen” existing in reservoir interval which occupied part of matrix pore and fill some fractures. This investigation is raised up at early field production life: material balance calculation and run simulation analysis are applied to re-assessment and tune-up reservoir potential; both techniques are set up almost same GIIP value which principally tuned to actual reservoir dynamic energy behavior. Finally, material balance should be viewed as a complement to simulation, not as a competing approach, and using both to improve analysis of hydrocarbon reservoirs.
water quality assessment is still being done at specific locations of major concern. The use of Geographical Information System (GIS) based water quality information system and spatial analysis with Inverse Distance Weighted interpolation enabled the mapping of water quality indicators along Tigris river in Salah Al-Din government, Iraq. Water quality indicators were monitored by taking 13 river samples from different locations along the river during Winter season year 2020. Maps of 10 water quality indicators. This meant that the specific water quality indicator and diffuse pollution characteristics in the basin were better illustrated with the variations displayed along the course of the river than conventional line graphs. Creation of
... Show MoreThe Zubair reservoir in the Abu-Amood field is considered a shaly sand reservoir in the south of Iraq. The geological model is created for identifying the facies, distributing the petrophysical properties and estimating the volume of hydrocarbon in place. When the data processing by Interactive Petrophysics (IP) software is completed and estimated the permeability reservoir by using the hydraulic unit method then, three main steps are applied to build the geological model, begins with creating a structural, facies and property models. five zones the reservoirs were divided (three reservoir units and two cap rocks) depending on the variation of petrophysical properties (porosity and permeability) that results from IP software interpr
... Show MoreBuilding a geological model is an essential and primary step for studying the reservoir’s hydrocarbon content and future performance. A three-dimensional geological model of the Asmari reservoir in Abu- Ghirab oil field including structure, stratigraphy, and reservoir petrophysical properties, has been constructed in the present work. As to underlying Formations, striking slip faults developed at the flank and interlayer normal. Abu Ghirab oilfields are located on the eastern anticlinal band, which has steadily plunged southward. 3D seismic interpretation results are utilized to build the fault model for 43 faults of the Asmari Formation in Abu Ghirab Oilfield. A geographic facies model with six different rock facies types
... Show MoreThe deficit of the federal budget and the structural imbalances suffered by the Iraqi economy has affected the direction of research towards suggesting steps and mechanisms can be relied upon in the near term to form a broader base of non-oil revenues aimed at achieving a balanced budget, and to proceed to reform the financial situation, In reducing their financial dictates, whether capital or operational, which lead to significant financial and economic consequences. This also requires that the Iraqi political elite have the real will, strategic vision and full awareness that the implementation of these reforms has potential social and economic effects, with long-term measures to be taken. The aim is not only to reform the finan
... Show MoreObjective(s): assessment of the health follow up and weight control for women with osteoporosis and find out the relationship between their health follow up and weight control and their socio-demographic characteristics.
Methodology: A descriptive study was conducted on women with osteoporosis for the period of September, 26th 2020 to Jun, 20th 2021. Non- probability (convenient) sample of (70) women with osteoporosis selected from (5) Private Clinics for Joints and Fractures in Baqubah City. A questionnaire was designed though extensive review of literatures and it consists of three parts: the first part includes women’s socio demographic characteristics, the second part inclu
... Show MoreThe Khor Mor gas-condensate processing plant in Iraq is currently facing operational challenges due to foaming issues in the sweetening tower caused by high-soluble hydrocarbon liquids entering the tower. The root cause of the problem could be liquid carry-over as the separation vessels within the plant fail to remove liquid droplets from the gas phase. This study employs Aspen HYSYS v.11 software to investigate the performance of the industrial three-phase horizontal separator, Bravo #2, located upstream of the Khor Mor sweetening tower, under both current and future operational conditions. The simulation results, regarding the size distribution of liquid droplets in the gas product and the efficiency gas/liquid separation, r
... Show MoreHistory matching is a significant stage in reservoir modeling for evaluating past reservoir performance and predicting future behavior. This paper is primarily focused on the calibration of the dynamic reservoir model for the Meshrif formation, which is the main reservoir in the Garraf oilfield. A full-field reservoir model with 110 producing wells is constructed using a comprehensive dataset that includes geological, pressure-volume-temperature (PVT), and rock property information. The resulting 3D geologic model provides detailed information on water saturation, permeability, porosity, and net thickness to gross thickness for each grid cell, and forms the basis for constructing the dynamic reservoir model. The dynamic reservoir mo
... Show More