Nowadays, cloud computing has attracted the attention of large companies due to its high potential, flexibility, and profitability in providing multi-sources of hardware and software to serve the connected users. Given the scale of modern data centers and the dynamic nature of their resource provisioning, we need effective scheduling techniques to manage these resources while satisfying both the cloud providers and cloud users goals. Task scheduling in cloud computing is considered as NP-hard problem which cannot be easily solved by classical optimization methods. Thus, both heuristic and meta-heuristic techniques have been utilized to provide optimal or near-optimal solutions within an acceptable time frame for such problems. In this article, a summary of heuristic and meta-heuristic methods for solving the task scheduling optimization in cloud-fog systems is presented. The cost and time aware scheduling methods for both bag of tasks and workflow tasks are reviewed, discussed, and analyzed thoroughly to provide a clear vision for the readers in order to select the proper methods which fulfill their needs.
Receipt date:06/23/2020 accepted date:7/15/2020 Publication date:12/31/2021
This work is licensed under a Creative Commons Attribution 4.0 International License
The executive authority differs from one country to another, as it differs from a federal state to another according to the nature of the applied political systems, so this research focused on federal states according to their political systems, then going into the details of the executive authority and its role In the federal states by referring to the four federal experiments
... Show MoreIn the present work the clathrate hydrate dissociation enthalpies of refrigerant R134a+ water system, and R134a + water + salt system were determined. The heat of dissociation of three types of aqueous salts solutions of NaCl, KBr and NaF at three concentrations (0.09, 0.17and 0.26) mol·kg−1 for each salt type, were enthalpy measured. The Clapeyron equation was used tocalculate heat of dissociation of experimental data for binary and ternary system.In order to find the effect of compressibility factor on heat dissociation enthalpy, the study was conducted by using equation of state proposed by Peng and Robinson Stryjek-Vera (PRSV). The obtained results of dissociation enthalpy for binary system were (143.8) kJ.mol-1
... Show MoreOptimizing the Access Point (AP) deployment is of great importance in wireless applications owing the requirement to provide efficient and cost-effective communication. Highly targeted by many researchers and academic industries, Quality of Service (QOS) is an important primary parameter and objective in mind along with AP placement and overall publishing cost. This study proposes and investigates a multi-level optimization algorithm based on Binary Particle Swarm Optimization (BPSO). It aims to an optimal multi-floor AP placement with effective coverage that makes it more capable of supporting QOS and cost effectiveness. Five pairs (coverage, AP placement) of weights, signal threshol
Optimizing the Access Point (AP) deployment has a great role in wireless applications due to the need for providing an efficient communication with low deployment costs. Quality of Service (QoS), is a major significant parameter and objective to be considered along with AP placement as well the overall deployment cost. This study proposes and investigates a multi-level optimization algorithm called Wireless Optimization Algorithm for Indoor Placement (WOAIP) based on Binary Particle Swarm Optimization (BPSO). WOAIP aims to obtain the optimum AP multi-floor placement with effective coverage that makes it more capable of supporting QoS and cost-effectiveness. Five pairs (coverage, AP deployment) of weights, signal thresholds and received s
... Show MoreThe emphasis of Master Production Scheduling (MPS) or tactic planning is on time and spatial disintegration of the cumulative planning targets and forecasts, along with the provision and forecast of the required resources. This procedure eventually becomes considerably difficult and slow as the number of resources, products and periods considered increases. A number of studies have been carried out to understand these impediments and formulate algorithms to optimise the production planning problem, or more specifically the master production scheduling (MPS) problem. These algorithms include an Evolutionary Algorithm called Genetic Algorithm, a Swarm Intelligence methodology called Gravitational Search Algorithm (GSA), Bat Algorithm (BAT), T
... Show MoreThis paper proposes a new algorithm (F2SE) and algorithm (Alg(n – 1)) for solving the
two-machine flow shop problem with the objective of minimizing total earliness. This
complexity result leads us to use an enumeration solution approach for the algorithm (F2SE)
and (DM) is more effective than algorithm Alg( n – 1) to obtain approximate solution.
Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreZainab M. Al-Bahrani Department of Oral Diagnosis, College of Dentistry, University of Baghdad, Baghdad, Iraq.Corresponding author: Zainab M. Al-Bahra...
Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem
... Show MoreThe loss of dental hard tissue as a result of odontoclastic activity is known as root resorption. It is unwanted and pathological in permanent teeth. Root resorption may happen within the root canal called internal root resorption or on the outer surface of the root called external root resorption. Regardless of where it occurs, root resorption is irreparable, can cause pain for the patient, necessitates treatment, and in some circumstances, resulting in the early loss of the affected tooth. It might be challenging to precisely diagnose and treat root resorption. There is limited information within literatures on root resorption therefore this review aims to understand the radiological and clinical characteristics of r
... Show More