Factor analysis is distinguished by its ability to shorten and arrange many variables in a small number of linear components. In this research, we will study the essential variables that affect the Coronavirus disease 2019 (COVID-19), which is supposed to contribute to the diagnosis of each patient group based on linear measurements of the disease and determine the method of treatment with application data for (600) patients registered in General AL-KARAMA Hospital in Baghdad from 1/4/2020 to 15/7/2020. The explanation of the variances from the total variance of each factor separately was obtained with six elements, which together explained 69.266% of the measure's variability. The most important variable are cough, idleness, fever, headache, palpebral, and difficulty in breathing. In the first factor and the variable appetite, not smelling, not to taste and diarrhea in the second factor: variables( sex, work, smoking, drinking alcohol) in the third factor, variables ( diabetes, age, pressure) in the fourth factor, variables(vomiting, heartburn ) in the fifth factor, variables(Blood group, drinking alcohol) in the sixth factor. Therefore, we must wash hands and covering mouths, or wearing a face mask when sneezing or coughing. Social distancing, disinfecting surfaces, ventilation, air-filtering, monitoring, and self-isolation are exposed or symptomatic
This study is a numerical investigation of the performance of reinforced concrete (RC) columns after fire exposure. This study aims to investigate the effect of introducing lateral ties and using the RC jacket on improving post-fire behavior of these columns, the effect of the duration of the fire on ultimate load of columns. The analysis was performed through ABAQUS, a 3D – non-linear finite element program. 4 m tall lengthening square RC column with a cross- section of 0.4 m × 0.4 m was used as a test specimen. The RC column was reinforced by 4Ø28 mm longitudinal bars bonded by steel tie bars of Ø10 mm spaced at 400 mm. The firing temperature was increased to 60
Free Piston Engine Linear Generator (FPELG) is a modern engine and promising power generation engine. It has many advantages compared to conventional engines such as less friction, few numbers of parts, and high thermal efficiency. The cycle-to-cycle variation one of the big challenges of the FPELG because it is influence on the stability and output power of the engine. Therefore, in this study, the effect of ignition time on combustion characteristics is investigated. The single-cylinder FPELG with spark ignition (SI) combustion type by using compressed natural gas (CNG) fuel type was set to run. LabVIEW is used to run the engine and control of input parameters. All experimental data
Many studied were conducted to evaluate the antihepatotoxic and antioxidant activities of Silybum marianum and proved these actions. The Naturally grown seed in Iraqi-Kurdistan Region also were studied for its chemical contents and biological activities. Vegetable oils occur in various plant parts mainly concentrated in the seeds.
In this study comparison was made between the fatty acid patterns of two plant seeds, Silybum marianum and Nigella sativa. Seed sample of Silybum marianum and Nigella sativa were exposed for extraction and isolation of the fatty acid contents using two different solvents (petroleum ether and n-hexane) at 60-80oC using soxhlet apparatus and the oily extract
... Show More 
Concrete structures are exposed to aggressive environmental conditions that lead to corrosion of the embedded reinforcement and pre-stressing steel. Consequently, the safety of concrete structures may be compromised, and this requires a significant budgets to repair and maintain critical infrastructure. Prediction of structural safety can lead to significant reductions in maintenance costs by maximizing the impact of investments. The aim of this paper is to establish a framework to assess the reliability of existing post-tensioned concrete bridges. A time-dependent reliability analysis of an existing post-tensioned involving the assessment of Ynys-y-Gwas bridge has been presented in this study. The main cause of failure of this bridge was c
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend
... Show MoreThe purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of
... Show MoreThe study aims at diagnosing the importance of environmental analysis (external, industrial and internal) in the organization's strategy for the development of public organizations. The theoretical problem derived from the existence of a knowledge gap for studies and research that dealt with the variables of the study. Three public organizations were selected as the study society (the Civil Defense Directorate, the Directorate of Nationality, Passports and Residency, the General Traffic Directorate). The sample of the study was a sample of (215) managers (managers, department managers, Analysis of the data and hypothesis testing using the appropriate statistical tools, Pearson, the simple and multiple regression coefficient to te
... Show More