Preferred Language
Articles
/
jpgiafs-214
Market Value Added Among Historiecal Cost and Fair Value Contravercy
...Show More Authors

Because of the vulnerability of the concept of historical cost adopted as a basis for accounting measurement to many of the criticisms in reaction counter to the concept of fair value, the aim of the research is to try to make a comparison between the historical cost and fair value to prove the health and safety of any of the measurement best for the preparation of financial statements and through the state of each of the two study secretary and good financial investment after being diagnosed with a realistic problem is the limitations of the concept of historical cost in the evaluation of assets in spite of the supposed information disclosed in the financial statements compared to appropriate property for the concept of the fair value of the decisions of its users to re-evaluate investments one at a financial adoption of the added market value between the dialectic of the concept of historical cost Reliability and fair value Has been to reach a set of conclusions that the fair value of the most important in the preparation of financial statements are complementary to those that are prepared under the historical cost which affects the increase of accounting disclosure

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed May 10 2023
Journal Name
Journal Of Engineering
A Proposal Algorithm to Solve Delay Constraint Least Cost Optimization Problem
...Show More Authors

Traditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).

View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jan 01 2016
Journal Name
Journal Of The American Pharmacists Association
Estimating the cost of unclaimed electronic prescriptions at an independent pharmacy
...Show More Authors

View Publication
Scopus (2)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Lecture Notes In Networks And Systems
Implementing a Smart Low-Cost System for Diagnosing Bacteria in Women
...Show More Authors

View Publication
Scopus Clarivate Crossref
Publication Date
Tue Jan 12 2016
Journal Name
Wireless Networks
Low communication cost (LCC) scheme for localizing mobile wireless sensor networks
...Show More Authors

In recent years, the number of applications utilizing mobile wireless sensor networks (WSNs) has increased, with the intent of localization for the purposes of monitoring and obtaining data from hazardous areas. Location of the event is very critical in WSN, as sensing data is almost meaningless without the location information. In this paper, two Monte Carlo based localization schemes termed MCL and MSL* are studied. MCL obtains its location through anchor nodes whereas MSL* uses both anchor nodes and normal nodes. The use of normal nodes would increase accuracy and reduce dependency on anchor nodes, but increases communication costs. For this reason, we introduce a new approach called low communication cost schemes to reduce communication

... Show More
View Publication
Scopus (34)
Crossref (27)
Scopus Clarivate Crossref
Publication Date
Sat May 07 2022
Journal Name
American Journal Of Economics And Business Management
The Integrating Effect Resource Consumption Accounting (RCA) and Enterprise Resource Planning (ERP) On Cost Reduction and Quality Improvement
...Show More Authors

The research aims to examine the integration effect among resource consumption accounting (RCA) system and the enterprise resource planning (ERP) on both costs reduction and quality improvement. The study questioner form distributed to two different respondents as the unit of analysis. The research reached various conclusions most important of which is the integration relationship can help solve the special difficulties in managing the economic unit data. Moreover, the integration provides a clear picture of the causal relationships between resources, resource quantities, and associated costs

Preview PDF
Publication Date
Sun Feb 01 2015
Journal Name
Journal Of Engineering
Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area
...Show More Authors

This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project.  Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.

... Show More
View Publication Preview PDF
Publication Date
Mon Oct 31 2022
Journal Name
Journal Of Sustainability Science And Management
THE MEDIATING ROLE OF SUSTAINABLE DEVELOPMENT IN THE RELATIONSHIP BETWEEN PRODUCER COST EXPECTATIONS AND CUSTOMER DESIRES
...Show More Authors

In this paper, customers’ expectations are continually shifting due to the business environment’s growing competition and substantial changes. As a result, organisations no longer viewed it as a static objective but as an ever-evolving aim. From this vantage point, the research has explored the accounting literature in search of novel approaches to addressing the strategic dimensions of quality, cost and time. Getting them to respond positively to the customer’s requests also requires recognising their needs and controlling their impact on these dimensions. With the removal of operations that do not contribute any value to the product’s value chain and a reduction in manufacturing costs through continuous improvement, the ou

... Show More
View Publication
Scopus (37)
Crossref (7)
Scopus Crossref
Publication Date
Mon Dec 11 2023
Journal Name
International Journal Of Phytoremediation
Adsorption of methyl orange on low-cost adsorbent natural materials and modified natural materials: a review
...Show More Authors

Recently a large number of extensive studies have amassed that describe the removal of dyes from water and wastewater using natural adsorbents and modified materials. Methyl orange dye is found in wastewater streams from various industries that include textiles, plastics, printing and paper among other sources. This article reviews methyl orange adsorption onto natural and modified materials. Despite many techniques available, adsorption stands out for efficient water and wastewater treatment for its ease of operation, flexibility and large-scale removal of colorants. It also has a significant potential for regeneration recovery and recycling of adsorbents in comparison to other water treatment methods. The adsorbents described herein were

... Show More
Preview PDF
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Mon Oct 16 2023
Journal Name
International Journal Of Phytoremediation
Adsorption of methyl orange on low-cost adsorbent natural materials and modified natural materials: a review
...Show More Authors

View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref