The research aims to prepare a report by the external auditor (Federal Office of Financial Supervision) for the control environment it is includes financial control, commitment and performance of the North Oil Company (extractive) according to the causes of pollution. The research problem it is not the Federal Office of Financial Supervision preparation a report on the things the environment include the prevent or reduction failure the administration of the causes of the pollution caused by oil mining industry by both bad planning or operational or related to efficient human resources as well as of technology to use and resulting from non-compliance local laws and instructions, as well as the inefficiency of spending on environmental issues by The research Hypothec is that environmental control for all kinds (financial Audying ,control of commitment and control performance)By the external auditor contributes to reducing or minimizing the negative environmental effects through verifying compliance with local laws and regulations as well as the efficiency of spending on environmental matters by extractive companies It is the most important conclusions the company had not preparation programs (Plan) for the repair of environmental assets so as an increase quantity of leaky oil from pipeline ,So does not have an official landfills and industrial waste, unlike of the laws as well as the lack of precision in determining the need (planned) of the necessary supplies of cars , machinery and industrial security requirements as well as lack of the staff in the environmental issues professionals .
An investigation was conducted for dewaxing of lubricating oil fraction by urea to reduce the pour point.In this study mixture of 45 % methyl ethyl ketone (MEK) and 55 % toluene was used as a solvent. The studied variables are mixing time (10-70 min), solvent to oil volume ratio (0.5:1- 2:1), urea to wax weight ratio (2- 6) and constant mixing speed 1500 rpm. By analysis of the experimental results, the best operating conditions achieved are mixing time 40 min, solvent/oil 2:1 volume ratio, and urea/wax 4:1 weight ratio. At these conditions the pour point of the lubricating oil decreases from 24 ° C to -13 °C.
يحتل النفط مكانة هامة وجوهرية ضمن اقتصاديات العالم، حيث إنه يمثل سلعة استراتيجية عالمية ومادة أولية أساسية في الصناعات الكيميائية والبتروكيميائية، كما أنه متعدد الاستعمالات، سواء في الصناعة أو الزراعة، بالإضافة إلى استعمالاته في الحياة اليومية للإنسان، مما جعله ذا مكانة مهمة ضمن أطر التجارة الدولية وموقع خاص في تشكيل الخريطة الاقتصادية للعالم. وقد جاء هذا البحث ليسلط الضوء على استراتيجيات منظمة الأوبك لض
... Show MoreIn this paper, experimental study has been done for temperature distribution in space conditioned with Ventilation Hollow Core Slab (TermoDeck) system. The experiments were carried out on a model room with dimensions of (1m 1.2m 1m) that was built according to a suitable scale factor of (1/4). The temperature distributions was measured by 59 thermocouples fixed in several locations in the test room. Two cases were considered in this work, the first one during unoccupied period at night time (without external load) and the other at day period with external load of 800W/m2 according to solar heat gain calculations during summer season in Iraq. All results confirm the use of TermoDeck system for ventilation and cooling/heat
... Show MoreBio-diesel is an attractive fuel fordiesel engines. The feedstock for bio-diesel production is usually vegetable oil, waste cooking oil, or animal fats. This work provides an overview concerning bio-diesel production. Also, this work focuses on the commercial production of biodiesel. The objective is to study the influence of these parameters on the yield of produced. The biodiesel production affecting by many parameters such s alcohol ratio (5%, 10%,15 %, 20%,25%,30%35% vol.), catalyst loading (5,10,15,20,25) g,temperature (45,50,55,60,65,70,75)°C,reaction time (0-6) h, mixing rate (400-1000) rpm. the maximum bio-diesel production yield (95%) was obtained using 20% methanol ratio and 15g biocatalyst at 60°C.
This paper presents a comparative study between different oil production enhancement scenarios in the Saadi tight oil reservoir located in the Halfaya Iraqi oil field. The reservoir exhibits poor petrophysical characteristics, including medium pore size, low permeability (reaching zero in some areas), and high porosity of up to 25%. Previous stimulation techniques such as acid fracturing and matrix acidizing have yielded low oil production in this reservoir. Therefore, the feasibility of hydraulic fracturing stimulation and/or horizontal well drilling scenarios was assessed to increase the production rate. While horizontal drilling and hydraulic fracturing can improve well performance, they come with high costs, often accounting for up t
... Show MoreThe reserve estimation process is continuous during the life of the field due to risk and inaccuracy that are considered an endemic problem thereby must be studied. Furthermore, the truth and properly defined hydrocarbon content can be identified just only at the field depletion. As a result, reserve estimation challenge is a function of time and available data. Reserve estimation can be divided into five types: analogy, volumetric, decline curve analysis, material balance and reservoir simulation, each of them differs from another to the kind of data required. The choice of the suitable and appropriate method relies on reservoir maturity, heterogeneity in the reservoir and data acquisition required. In this research, three types of rese
... Show MoreSuffer most of the facilities of the high cost of inventory , which affects the high cost of the product and thus affects many administrative decisions , as well as suffer the facilities of the systems developed by the provisions of inventory control , and this problem is exacerbated in the construction sector where the inventory in the form of Construction spin of the Year for another it becomes difficult to control the cost effectively , and is the research problem in question follows: What are the implications of the use of the system in time inventory accounting system for the contracting company does kills Alrkaah to the provisions of the cost of inventory and what is the optimal approach to inventory control ? Find assumed
... Show More