The aim of the research is to find out the availability of the requirements of applying the indicators of school performance system in the public schools in Mahayel Asir educational directorate through the school planning indicator, the safety and security indicator, the active learning indicator, the student guidance indicator and determining the existence of statistically significant differences between the responses of the research community according to the variable of (scientific qualification - years of work as a principal - training courses). The questionnaire was used as a tool for data collection from the research community, which consists of all the public schools’ principals (n=180) Mahayel Asir educational directorate .The research found that the participants believe to a high level that schools have the requirements of applying the indicators of school performance system with an average of (3.41). Also, it was found that they believe that the requirements of applying the security and safety indicator to a large extent with an average of (3.54), applying the Active Learning Indicator to a medium degree and with an average of (3.35), and applying the student guidance indicator to a medium degree (3.37). The research also found statistically significant differences between the average responses of the research community due to the variable of (years of work as a principal) in favor of the level of experience more than 10 years. In light of the results, the research made some recommendations.
In this paper, we will illustrate a gamma regression model assuming that the dependent variable (Y) is a gamma distribution and that it's mean ( ) is related through a linear predictor with link function which is identity link function g(μ) = μ. It also contains the shape parameter which is not constant and depends on the linear predictor and with link function which is the log link and we will estimate the parameters of gamma regression by using two estimation methods which are The Maximum Likelihood and the Bayesian and a comparison between these methods by using the standard comparison of average squares of error (MSE), where the two methods were applied to real da
... Show MoreAbstract
The study aimed: To assess the level of trainers' knowledge about the application of strategies and to find out the relationship between Trainer's knowledge and their socio-demographic characteristics.
Methodology: Using the pre-experimental design of the current study, for one group of 47 trainers working at the private Autism Centers in Baghdad, data was collected from 8/January / 2022 to 13 /February /2022. Using non-probability samples (convenient samples), self-management technology in which trainers fill out the questionnaire form themselves was used in the data collection process; it was analyzed through descriptive and inference statistics.
The research aims to improve operational performance through the application of the Holonic Manufacturing System (HMS) in the rubber products factory in Najaf. The problem was diagnosed with the weakness of the manufacturing system in the factory to meet customers' demands on time within the available resources of machines and workers, which led to time delays of Processing and delivery, increased costs, and reduced flexibility in the factory, A case study methodology used to identify the reality of the manufacturing system and the actual operational performance in the factory. The simulation was used to represent the proposed (HMS) by using (Excel 2010) based on the actual data and calculate the operational performance measures
... Show MorePID (proportional-integral-derivative) and Mu controllers are widely used in electro-hydraulic servo systems due to their effectiveness and ease of implementation. This paper explores using particle swarm optimization (PSO) for tuning traditional and robust PID controllers, along with D-K iteration for Mu controller tuning. Three controller types: conventional PID (CPID), robust PID (RPID), and structured singular value controllers are developed, while analyzing multiplicative uncertainty with six uncertain coefficients. Their findings indicated that both PID (CPID and RPID) and Mu controllers maintained system stability. Notably, the Mu controller can handle coefficient uncertainty without a pure integral term, while the RPID controller de
... Show MoreIn this research, optical communication coding systems are designed and constructed by utilizing Frequency Shift Code (FSC) technique. Calculations of the system quality represented by signal to noise ratio (S/N), Bit Error Rate (BER),and Power budget are done. In FSC system, the data of Nonreturn- to–zero (NRZ ) with bit rate at 190 kb/s was entered into FSC encoder circuit in transmitter unit. This data modulates the laser source HFCT-5205 with wavelength at 1310 nm by Intensity Modulation (IM) method, then this data is transferred through Single Mode (SM) optical fiber. The recovery of the NRZ is achieved using decoder circuit in receiver unit. The calculations of BER and S/N for FSC system a
... Show MoreDue to the intensity of competition between economic units that run the trade in durable goods had to pay a lot of these companies to follow the new selling methods aimed at attracting customers to be able to increase its sales and thereby increase their profits , these methods are installment sales, which had been in great demand by the customers with limited income, who provides them with the possibility of possession and use of such goods and to postpone the full amount of the payment to the seller, This transaction sales have grown even became installment sales system at the present time of the common types of sales transactions and deployed a lot in our environment and in many sectors of the market, and in some cases m
... Show MoreNowadays power systems are huge networks that consist of electrical energy sources, static and lumped load components, connected over long distances by A.C. transmission lines. Voltage improvement is an important aspect of the power system. If the issue is not dealt with properly, may lead to voltage collapse. In this paper, HVDC links/bipolar connections were inserted in a power system in order to improve the voltage profile. The load flow was simulated by Electrical Transient Analyzer Program (ETAP.16) program in which Newton- Raphson method is used. The load flow simulation studies show a significant enhancement of the power system performance after applying HVDC links on Kurdistan power systems. Th
... Show MoreIn this paper, a novel flow control strategy which is the inlet throttled pump was used to design an angular velocity control system for rotary actuator. Inlet throttled systems have good performance in addition to their high efficiency compared to traditional valve controlled systems. The flow in the proposed system is adjusted by a valve that is positioned at the pump inlet with the purpose of reducing the energy loses across the valve. This regulated flow is used then to control the actuator angular velocity. The system was modeled and the open loop stability and performance were studied. In order to improve the system performance, Robust-Proportional-Integral-Derivative (RPID) and structured singular value (M@#@) controllers have been d
... Show More