Preferred Language
Articles
/
jperc-220
Construction Bullying scale for Kindergarten child
...Show More Authors

Construction of photographed bullying scale of kindergarteners was the aim of this study. The study conducted to answer the raised question, could the bullying among kindergarteners be measured?. A total of (200) boy and girl were selected from city of Baghdad to be the sample of the study. The scale composed of (27) item with colored pictures. It takes about (15) minuets to answer the whole scale items. SPSS tools were used to process the collected data. The result showed that the bullying among kindergarteners could be measured.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The effect of applying lean construction tools to improving the results of the earned value management model: Applied research in Al-Rasheed General Company for Construction Contracting
...Show More Authors

Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag

... Show More
View Publication Preview PDF
Publication Date
Tue Jun 15 2021
Journal Name
Al-academy
The directing vision and two display technologies in the Iraqi Child Theater: عباس قاسم كاظم
...Show More Authors

  The current research contains four chapters. The first topic included the methodological framework that included the problem of research and the need for it, and then the importance of the research, and then the aim of the research, its limits and the definition of terms linguistically, conventionally and procedurally. The second chapter (the theoretical framework) contained two topics, the topic The first is titled: The Outward Vision in Child Theater Performances, while the second topic was titled: Presentation Technology in Child Theater, Chapter Four (Research Procedures), which organized the research community and analyzed its sample, and the fourth chapter contained research results, conclusions and recommendations. The prop

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Sep 15 2021
Journal Name
Al-academy
Design and implementation of a glove theater of cardboard materials for the students of the Kindergarten Department: قيس هاشم احمد النعيمي
...Show More Authors

The current research aims to develop the skills of the kindergarten students in designing and implementing a theater for gauntlets made of cardboard materials. To study this, the researcher determined to build teaching plans for design and implementation skills according to (Kolb model).
The results of this research showed the effectiveness of teaching plans according to (Kolb's model) in developing skills of design and implementation (theater for gauntlets made of cardboard materials) for the students of the Kindergarten Department - the experimental group. Which had a positive effect to reach the desired results in the design and implementation of the gauntlet theater and dealing with cardboard materials

View Publication Preview PDF
Crossref
Publication Date
Wed May 31 2017
Journal Name
Journal Of Engineering
Construction Policies on Campus An Analytical Study of the Policy of Construction Planning on Kufa Campus
...Show More Authors

     University Campuses, as any lively physical entity, is subject to continuous variation due to . growth, development and change. This reality covers the existing or futuristic additives or  additions, consecutively these changes may have a strong sensation of disorientation as a result of formatic changes in buildings, or in movement paths. And it epitomized the research problem to "the need for knowledge to clarify the impact of intellectual and executive policy in achieving coherence, functional and space organization of the elements of the university urban environment and in the stages of future growth and change,"  the search targeted "to highlight the study of constraction politics on campus Bmqomad

... Show More
View Publication Preview PDF
Publication Date
Thu Jun 01 2023
Journal Name
Journal Of Engineering
Integration Building Information Modeling and Lean Construction Technologies in the Iraqi Construction Sector: Benefits and Constraints
...Show More Authors

Building Information Modeling (BIM) and Lean Construction (LC) are two quickly growing applied research areas in construction management. This study focuses on identifying the most essential benefits and analyzing the most affecting constraints on the construction sector that construction players face as they attempt to combine BIM-LC in Iraqi construction. Experts assessed 30 benefits and 28 constraints from examining the previous literature, and a two-round Delphi survey formed the responses. Expert consensus analysis was utilized to elaborate and validate responses after descriptive statistical checks had been used for data processing.

According to the study's findings, the benefits include ensuring the most ef

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Feb 04 2019
Journal Name
Journal Of The College Of Education For Women
The regulatory climate in the government and private kindergarten children (Comparative Study)
...Show More Authors

The research problem boils question is there in Riyadh organizational climate that enables them to do their work properly and whether there are differences between the government and private Riyadh depending on the organizational climate has sought Find measure: 1 regulatory climate for kindergarten 2. The difference between government and private Riyadh depending on the organizational climate. Limited research on the (200) parameter of the Riyadh government and private parameters for the year (20,142,015) In order to achieve the research objectives the researchers built a regulatory climate in accordance with the scientific steps to build a psychological scales measure After the formulation of climate regulation paragraphs of the (30) p

... Show More
View Publication Preview PDF
Publication Date
Sat Nov 03 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Construction of an Initial Assessment Documentation Tool for Nursing Recording System in Coronary Care Units
...Show More Authors

Objective : The study was carried out to construct an initial assessment documentation tool for nursing
recording system in Coronary Care Unit.
Methodology : A descriptive, purposive sample of (65) nurses was selected from CCU of main
teaching hospitals (Al Karama, Al Kindy, Al Kadimia, Al Yarmmok, Baghdad teaching hospital, Ibn
Al Naffis hospital) and Ibn-Al betar hospital in Baghdad city from the 15th of April 2004 to the 15th of
April 2006.
The instrument was constructed and comprised of two sections: section one included the
nurses' demographic characteristic; section two was the initial assessment documentation tool that
contained (2) parts including: General information form and the initial assessment form.

... Show More
View Publication Preview PDF
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (7)
Clarivate Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Evaluating the Knowledge for Integrating RM and VM Using BIM in the Iraqi Construction Sector
...Show More Authors

The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due

... Show More
View Publication Preview PDF
Crossref (3)
Crossref