Preferred Language
Articles
/
jpd-353
Statistical Evaluation of the Planning Process and Scheduling Management for Irrigation and Drainage Projects in the Republic of Iraq
...Show More Authors

The Research aims to investigate into reality in terms of planning and scheduling management process for sake the implementation and maintenance of irrigation and drainage projects in the Republic of Iraq, with an indication of the most important obstacles that impede the planning and scheduling management process for these projects and ways of addressing them and minimizing their effects.                                                  For the purpose of achieving the goal of the research, a scientific methodology was followed, represented in the collection of information literacy related to the subject of planning and scheduling management.Scheduling in multiple aspects, the most important of which are factors related to planning, design, implementation, contracting documents, management of the implementing agency, the nature of the project, planning, control and follow-up work.                                                                                        The study concluded that there are sixty-three factors influencing the planning and scheduling management process, including (not calculating the quantities of work paragraphs in an accurate and detailed manner) came in the first place with relative importance (74%), then followed by the second factor (the lack of qualified cadres to prepare time programs) And with a relative importance of (73%), and sixteen factors were excluded because they got a relative importance of less than (50%), and with regard to the factors affecting in estimating the implementation and maintenance periods in the General Authority for the Maintenance of Irrigation and Sewerage Projects, the study reached forty-five reasons, the most important of which are (Availability of financial liquidity) with relative importance (83%) in the first place, then followed by (the efficiency of the machines, machines and equipment used) with relative importance (79%), and in light of the conclusions reached, a set of recommendations were developed to developed the planning process and scheduling management for the implementation and maintenance of projects irrigation and drainage.

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu Apr 18 2019
Journal Name
Al-kindy College Medical Journal
Evaluation of Risk Management among Managers of the Primary Health Care Centers in Baghdad City: Comparative Study
...Show More Authors

Background: Several risk managem-ent standards had been developed including the Project Management Institute, the National Institute of Standards and Technology, actuarial societies, and ISO standards.

Objective: The study aimed at evaluating risk management among managers of model and ordinary primary health care centers in Baghdad City and comparing the risk management among these centers.

Methods: A descriptive comparative des

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Dec 01 2007
Journal Name
Journal Of Economics And Administrative Sciences
The analysis of time series considers one of the mathematical and statistical methods in explanation of the nature phenomena and its manner in a specific time period.
...Show More Authors

The analysis of time series considers one of the mathematical and statistical methods in explanation of the nature phenomena and its manner in a specific time period.

Because the studying of time series can get by building, analysis the models and then forecasting gives the priority for the practicing in different fields, therefore the identification and selection of the model is of great importance in spite of its difficulties.

The selection of a standard methods has the ability for estimation the errors in the estimated the parameters for the model, and there will be a balance between the suitability and the simplicity of the model.

In the analysis of d

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
The Success Of The Project Management In light of the Learning Organization Characteristics field reserche for the opinion of simple of worker at the State Commission For Road and Bridge
...Show More Authors

Abstract                                                                                                                       &nbsp

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Evaluation of real estate investment projects with framework theory of real options: A case study in the shopping center project (Baghdad Mall)
...Show More Authors

 

Focused research aims to provide a framework cognitive analytical nature of real estate investments and how they evaluated in the light of the assessment tools of modern theory of real options, and the possibility to rely on that theory in the detection of the true value of projects, real estate investments that would maximize the value of the investment decision taken, and the analysis of those projects that arise in the real estate markets and environments is the organization, which she was to make sure cases and high-risk, compared with entrances techniques, discounted cash flow (net present value). Based on the assumption lies in the possibility of the application of the implic

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Dec 14 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Evaluation of Diabetes Self-Management among Patients in Baghdad City: A Comparative Study
...Show More Authors

Objective(s): To Evaluate Diabetes self –management among patients in Baghdad City and to compare
between these patients self-management relative to the type of the disease.
Methodology: A descriptive design was conducted in Baghdad city, started from November 16th 2017 to the
end of May 17 th 2018 in order to evaluate Diabetes self-management. Purposive (non-probability) sample,
which was consisted of (120) patients who were diagnosed with D.M. The sample is comprised of (60) patient
with diabetes type I and (60) patient with diabetes type II. It is consisted of (60) male and (60) female. A
questionnaire is constructed for the purpose of the study. It is composed of (42) items. Reliability and validity of
the ques

... Show More
View Publication Preview PDF
Publication Date
Sun Aug 30 2015
Journal Name
Statistical Analysis Of The Relations Between Api,specific Gravity And Sulfur Content In The Universal Crude Oil
Statistical Analysis of the Relations between API, Specific Gravity and Sulfur Content in the Universal Crude Oil
...Show More Authors

Publication Date
Fri Oct 01 2021
Journal Name
Journal Of Engineering
Critical Evaluation for Grading and Fineness Modulus of Concrete Sands used in Sulaymaniyah City-Iraq
...Show More Authors

Fine aggregates used for concrete works in Sulaymaniyah city frequently fail to meet the standard requirements for gradation and fineness modulus in cement concrete. This paper aims to critically evaluate gradation, fineness modulus, and clay contents of various natural sands produced and used for concrete work in the region.  Sixteen field sand samples were collected from various sites in Darbandikhan (5 samples), Qalat Dizah (5 samples), Koysinjaq (5 samples), and Piramagroon (1 sample) confirming to ASTM D75. The field samples were parted into test specimens based on ASTM C702. Then, sieve analysis was carried out on the oven-dry test specimens in compliance with ASTM C136. The test results of fine aggregates wer

... Show More
View Publication Preview PDF
Crossref (7)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Artificial Neural Network Models to Predict the Cost and Time of Wastewater Projects
...Show More Authors

Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Aug 04 2022
Journal Name
Journal Of Nanomaterials
Thermal Management of the Melting Process in a Latent Heat Triplex Tube Storage System Using Different Configurations of Frustum Tubes
...Show More Authors

In this study, the energy charging mechanism is mathematically modeled to determine the impact of design modifications on the thermofluidic behavior of a phase change material (PCM) filled in a triplex tube containment geometry. The surface area of the middle tube, where the PCM is placed, is supported by single or multi-internal frustum tubes in vertical triplex tubes to increase the performance of the heating and cooling of the system. In addition to the ordinary straight triplex tubes, three more scenarios are considered: (1) changing the middle tube to the frustum tube, (2) changing the inner tube to the frustum tube, and (3) changing both the internal and central tubes to the frustum tubes. The impact of adopting the tube desig

... Show More
View Publication
Scopus (48)
Crossref (43)
Scopus Clarivate Crossref
Publication Date
Wed Mar 30 2022
Journal Name
Journal Of Economics And Administrative Sciences
Planning the Production of the Electrical Distribution Converter (400KV/11) Using Time Series Methods and Goal Programming in the Fuzzy Environment
...Show More Authors

This Paper aims to plan the production of the electrical distribution converter (400 KV/11) for one month at Diyala Public Company and with more than one goal for the decision-maker in a fuzzy environment. The fuzzy demand was forecasting using the fuzzy time series model. The fuzzy lead time for raw materials involved in the production of the electrical distribution converter (400 KV/11) was addressed using the fuzzy inference matrix through the application of the matrix in Matlab, and since the decision-maker has more than one goal, so a mathematical model of goal programming was create, which aims to achieve two goals, the first is to reduce the total production costs of the electrical distribution converter (400 KV/11) and th

... Show More
View Publication Preview PDF
Crossref