ABSTRACT Studying the positive and negative effects resulted from the industrial projects and laying down the comprehensive planning bases to the urban development projects which insure retaining the social, economic and environmental development, taking in to consternation the time factor within the planning process which is considered the most important factor that determine the extent of the efficient selection to the site and not interpenetrate in the industrial activities and efficiency and calculating its future expansions away from the residential areas. It is more favorable to plan the industrial areas of apparent pollution outside the bounds of the basic plan to limit the negative effects on the environment and providing the modern technology and the necessary techniques to treat the harmful outputs and providing a control station to the pollutions in every industrial area which would limit the appearance of the environment problems which represent the most important outcomes of the developing process and consequently determining the well being of the people of that concerned area with the development process
The current research discussed biophysics data as a theoretical and applied knowledge base linking industrial design with the natural sciences at the level of applied strategies through which we can enrich the knowledge base of industrial design. The research focused on two main aspects of the scientific references for biophysics, namely: electromagnetism, and biomechanics. According to the performance and functional applications in designing the functions of industrial products at the electromagnetic level, it was found that remote sensing applications: such as fire sensors that were adopted from the insect (Black Beetle) and that their metaphors enable them to hear fire, and collision sensors, which were adopted from the insect
... Show MoreObjecte The study aims to test the effect of using the appropriate quantitative method of demand forecasting in improving the performance of supply chain of the aviation fuel product ( The study sample), One of the products of the Doura refinery (The study site), By testing a set of quantitative methods of demand forecasting using forecasting error measurements, and choosing the least faulty, most accurate and reliable method and adept it in the building chain.
Is the study of problem through a starting with the fol
... Show MoreConcentrations and distribution of major, minor, and trace elements were
studied in thirteen sediment samples from Al-Hammar Marsh.
Multivariate statistical techniques such as Principal Component Analysis (PCA)
and Agglomerative Hierarchal Cluster Analysis (AHCA) as well as pollution
analysis such as Enrichment Factor (EF) were used to process the data and identify
the possible sources of elemental constituents in sediment samples.Results of
chemical analysis revealed that Major element mean concentrations were in the
order of Ca> Si> K> Mg> and minor elements were in the order of Al> Fe>S>Cl>
Ti> P>Mn> Sr> N and trace elements were in the order of Cr> Ni> Zr>V>Zn>
The icon and the symbol represent the constituents of the communication process, through their intellectual and philosophical concepts that have been addressed by the current research that it has touched upon their importance in conveying the design idea for the recipient and showing the specificity of each one of them in the communication process. The research problem has been limited by the following question: what are the communication roles that the symbol and the icon present for the user in designing the industrial product?
The research objective is to reveal the theoretical visualization that describes the icon and the symbol in the industrial product and its importance in the communication process through stating the of simil
This investigation was carried out to study the treatment and recycling of wastewater in the Battery industry for an effluent containing lead ion. The reuse of such effluent can only be made possible by appropriate treatment method such as electro coagulation.
The electrochemical process, which uses a cell comprised aluminum electrode as anode and stainless steel electrode as cathode was applied to simulated wastewater containing lead ion in concentration 30 – 120 mg/l, at different operational conditions such as current density 0.4-1.2 mA/cm2, pH 6 -10 , and time 10 - 180 minute.
The results showed that the best operating conditions for complete lead removal (100%) at maximum concentration 120 mg/l was found to be 1.2 mA/cm2 cur
In batch experiments, a natural chitosan adsorbent was employed to extract cobalt ions from industrial wastewater under varied parameters of starting concentration, adsorbent weight, pH, and contact duration. The adsorbent was examined using FTIR, XRD, and AFM. For an initial cobalt ion concentration of 5x10-2 mol/l at pH 6, time 35 minutes, temperature 25 °C, and adsorbing dose 0.1 g, the results showed a maximum removal percentage of 99.0 percent. The Freundlich isotherm and the pseudo-second order kinetic model both suit the experimental data well. According to thermodynamic studies, the process was spontaneous and endothermic.