A study was performed to evaluate heavy metals removal from sewage sludge using lime. The processes of stabilization using alkaline chemicals operating on a simple principle of raising pH to 12 or higher, with sufficient mixing and suitable contact time to ensure that immobilization can reduce heavy metals. A 0.157 m3 tank was designed to treat Al-Rustemeyia wastewater treatment plant sludge. Characteristics of raw sludge were examined through two parameters: pH and heavy metal analysis. Different lime doses of (0- 25) g CaO/100 g sludge were mixed manually with raw sludge in a rotating drum. The samples were analyzed two hours after mixing. pH and heavy metals results were compared with EPA and National Iraqi Standard (NIS). Results showed as lime was added, the concentration of heavy metals decreases the higher the dose, the less heavy metals concentrations in the sludge. Although the concentration of heavy metals in the sludge was among the determinants according to the US Environmental Protection Agency, the results showed that 750 g of lime per 3 kg of sludge had reduced the concentration of heavy metals zinc from (662.934) mg/kg sludge to (452.998) mg/kg sludge, copper from (113.101) mg/kg sludge to (64.981) mg/kg sludge, lead from (91.215) mg/kg sludge to (53.307) mg/kg sludge, nickel from 107.257 mg/kg sludge to (50.478) mg/kg sludge, molybdenum from (13.743) mg/kg sludge to (8.724) mg/kg sludge). At the same time, the dose of 450 g lime per 3 kg of sludge had reduced the concentration of chromium from (110.577) mg/kg sludge to (0) mg/kg sludge.
Groundwater can be assessed by studying water wells. This study was conducted in Al-Wafa District, Anbar Governorate, Iraq. The water samples were collected from 24 different wells in the study area, in January 2021. A laboratory examination of the samples was conducted. Geographical information systems technique was relied on to determine the values of polluting elements in the wells. The chemical elements that were measured were [cadmium, lead, cobalt and chromium]. The output of this research were planned to be spatial maps that show the distribution of the elements with respect to their concentrations. The results show a variation in the heavy elements concentrations at the studied area groundwater. The samples show different values
... Show MoreThe Al Mishraq site has been the subject of many scientific studies for the period before and
after the fire in 2003. Five visits to the site were conducted twice in 2003 for general fact-finding, twice
in 2004, and once in 2005 for detailed sampling and monitoring. Desk-based research and laboratory analysis of soil and water samples results indicate that surface water and groundwater pollution from Al Mishraq site was significant at the time of its operation. The primary pollution source was the superheated water injection process, while the principal receptor is the River Tigris. Now that the plant is idle, this source is absent. Following the June 2003 sulphur fire, initial investigations indicate that short damage to
vegeta
The electrochemical behavior of carbon steel in water sweetening station in Libya has been studied in the range of ( 293–333 oC) using weight loss technique. Measurements were carried out over a range of Reynolds number (5000 – 25000).An apparatus was designed for studying the corrosion process in the turbulent regime, which is of industrial significance. It was found that The corrosion rate of carbon steel in water sweetening station is under diffusion control and increases with increasing Reynolds number. On the other hand the variation of corrosion rate with temperature in the range of (293–333 oC) was found to follow Arrhenius equation and the activation energy approximately the same except at low Reynolds
... Show MoreThe Moisture damage is considered as one of the main challenge for the experts in the field of asphalt pavement design. The aims of the present study is to modify moisture resistance of the asphalt concrete by utilizing ceramic fibers as a type of reinforcement incorporated with hydrated lime. For this purpose, a penetration grade of the asphalt cement (40-50) was utilized as a binder with an aggregate of the maximum nominal size of 12.5mm and mineral filler limestone dust. A series of specimens has been fabricated by utilizing 0.50, 1.0, 1.5, and 2.0 percentages of ceramic fibers. For each of these contents, another subsequent group of specimens with hydrated lime with 0.0, 1.0, 1.5, and 2.0 percentages were moulded. For the additi
... Show MoreThis work deals with thermal cracking of three samples of extract lubricating oil produced as a by-product from furfural extraction process of lubricating oil base stock in AL-Dura refinery. The thermal cracking processes were carried out at a temperature range of 325-400 ºC and atmospheric pressure by batch laboratory reactor. The distillation of cracking liquid products was achieved by general ASTM distillation (ASTM D -86) for separation of gasoline fraction up to 220 ºC from light cycle oil fraction above 220 ºC. The comparison between the conversions at different operating conditions of thermal cracking processes indicates that a high conversion was obtained at 375°C, according to gasoline production. According to gasoline produ
... Show MoreThe catalytic cracking of three feeds of extract lubricating oil, that produced as a by-product from the process of furfural extraction of lubricating oil base stock in AL-Dura refinery at different operating condition, were carried out at a fixed bed laboratory reactor. The initial boiling point for these feeds was 140 ºC for sample (1), 86 ºC for sample (2) and 80 ºC for sample (3). The catalytic cracking processes were carried out at temperature range 325-400 ºC and initially at atmospheric pressure after 30 minutes over 9.88 % HY-zeolite catalyst load. The comparison between the conversion at different operating conditions of catalytic cracking processes indicates that a high yield was obtained at 375°C, according to gasoline pr
... Show MoreDora petroleum refinery waste water is the one of the important source of pollution by priority pollutant aromatic compound discharged to Tigris river in Iraq. the station has waste water treatment unit contains many treatment subunits The most important sub units is :skimmer units ,physiochemical unit ,daf unit, biological unit. The aim of research project is to study the ability of unit to remove the priority pollutant aromatic compound and follow up these compounds in river to study ability of river to self removal. A solid phase extraction (SPE) followed by high performance liquid chromatography-ultra violet (HPLC-UV) technique is depicted for the quantitative estimation of benzidines and phenols. Experimental studies were performed to
... Show MoreBiodiesel is an environmentally friendly fuel and a good substitution for the fossil fuel. However, the purity of this fuel is a major concern that challenges researchers. In this study, a calcium oxide based catalyst has been prepared from local waste eggshells by the calcination method and tested in production biodiesel. The eggshells were powdered and calcined at different temperatures (700, 750, 800, 850 and 900 °C) and periods of time (1, 2, 3, 4 and 5 hr.). The effect of calcination temperature and calcination time on the structure and activity of the solid catalyst were examined by X-ray Diffraction (XRD), Scanning Electron Microscopy (SEM), and Brunaure-Emmett-Teller (BET). The optimum catalyst performance was obtained at 900 °C
... Show More