Maintenance of hospital buildings and its management are regarded as an important subject which needs attention because hospital buildings are service institutions which are very important to a society, requiring the search for the best procedure to develop maintenance in hospitals. The research is aimed to determine an equation to estimate the annual maintenance cost for public hospital. To achieve this aim, Al-Sader City Hospital maintenance system in Al-Najaf province has been studied with its main elements through survey of data, records and reports relating to maintenance during the years of the study 2008-2014 and to identify the strengths, weaknesses, opportunities and threat points in the current system through Swat analysis, which represents " analyzing the internal factors represented by strengths and weaknesses points and the external factors represented by opportunities and threats," [41]. On the basis of that, an equation has been obtained to estimate the cost of annual maintenance. To achieve this aim, the following issues should be taken into consideration:
Studying the actual work program of the maintenance department in Al-Sader Hospital,
Identifying the procedures used in maintenance and ways they are implemented,
Studying the maintenance records and reports,
Holding interviews with the manager of maintenance and its staff to integrate the information and
Integrating the analysis of maintenance cost by using statistical analysis system (ASA 2012).
To assess the validity of the model for the annual maintenance cost, the predicted values of the . equation are plotted against the actual measured (observed) values. Based on the validation data set, the coefficient of determination (R) was found to be equal to (82.5%), therefore it can be concluded that the developed equation showed moderate agreement with the actual measurements. Finally, it can be concluded from the study that, the developed equation should be pplied in hospital to overcome the problems and weak points of the current system and to estimate the annual maintenance cost for hospitals based on the scientific method.
Purpose - This study relies on the descriptive and analytical approach through collecting and analyzing the necessary data, as this approach focuses on polling the opinions of the research sample and its directions, and aims to develop a model that studies the relationship between knowledge creation and organizational ambidexterity in Iraqi private banks and verifying its validity experimentally.
Design / Methodology / Introduction - A survey was conducted through a questionnaire form to collect data from a sample of (113) managers in private commercial banks. In addition, this study used the AMOS program and the ready-to-use statistical program package (SPSS V.25) to test the proposed hypotheses of the t
... Show MoreSolid waste is a major issue in today's world. Which can be a contributing factor to pollution and the spread of vector-borne diseases. Because of its complicated nonlinear processes, this problem is difficult to model and optimize using traditional methods. In this study, a mathematical model was developed to optimize the cost of solid waste recycling and management. In the optimization phase, the salp swarm algorithm (SSA) is utilized to determine the level of discarded solid waste and reclaimed solid waste. An optimization technique SSA is a new method of finding the ideal solution for a mathematical relationship based on leaders and followers. It takes a lot of random solutions, as well as their outward or inward fluctuations, t
... Show MoreOne of the challenging issues encountered during drilling operations is the lost circulation. Numerous issues might arise because of losses, such as wasting of time and higher drilling cost. Several types of lost circulation materials have been developed and are being used to limit mud losses and avoid associated issues. Each solution has benefits and drawbacks.
In this study, a core flooding test was performed to study the effectiveness of polyacrylamide (PAM) granular gel on the reduction of the circulation lost. One common type of fracture characteristic is fractures with tips, commonly known as partially open fracture (POF). However, PAM gel therapy in POFs received little attention in prior research. Models of partly open fra
... Show MoreThe study aimed to reveal the possibility of predicting academic procrastination through both Cognitive distortions and time management among students of Al-Aqsa Community College, as well as to reveal the level of both cognitive distortions, time management, and academic procrastination. Additionally, it aimed to identify the size of the correlation between cognitive distortions, time management, and academic procrastination. The study sample consisted of (250) students from Al-Aqsa community college students. The results of the study concluded that the mean for each level of cognitive distortions and academic procrastination is average. The mean level of time management is high. There is a statistically significant positive relationshi
... Show MoreType 2 diabetes mellitus which abbreviate as T2DM is a complex endocrine and metabolic disorder arisingfrom genetic and environmental factors interaction which in turn induce various degrees of insulin functionalalteration on peripheral tissues. Globally, T2DM has develop into a public health problem. Therefore, Thestudy included (75) patients(37 female and 38 males) suffering from T2DM who visit al-kadhimiya teachinghospital with age range 20-80 years and (70) as healthy controls with age range 20-70 years. All studiedgroups were evaluated CMV IgG by ELISA,B. urea, S. Creatinine, cholesterol and triglyceride the resultsshowed that B.urea, S.creatinine and serum cholesterol showed a non-significant differences between studiedgroup,
... Show MoreVariation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show More