Preferred Language
Articles
/
joe-629
Experimental and Numerical Analysis of Expanded Pipe using Rigid Conical Shape
...Show More Authors

The experimental and numerical analysis was performed on pipes suffering large plastic deformation through expanding them using rigid conical shaped mandrels, with three different cone angles (15◦, 25◦, 35◦) and diameters (15, 17, 20) mm. The experimental test for the strain results investigated the expanded areas. A numerical solution of the pipes expansion process was also investigated using the commercial finite element software ANSYS. The strains were measured for each case experimentally by stamping the mesh on the pipe after expanding, then compared with Ansys results. No cracks were generated during the process with the selected angles. It can be concluded that the strain decreased with greater angles of conical shape and an increase in expansion ratio results in an increase of expansion force and a decrease in the pipe thickness and length resulting in pipe thinning and shortening. Good agreement is evident between experimental and ANSYS results within discrepancy (16.90017%) in the X direction and (27.68698%) in the Y direction. Also, the stress distribution is investigated and it can be concluded that the case of Diameter (Do cone) = 35mm and (A) = α = 15° is the optimum.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Sep 09 2022
Journal Name
Research Anthology On Improving Medical Imaging Techniques For Analysis And Intervention
Groupwise Non-Rigid Image Alignment Using Few Parameters
...Show More Authors

Groupwise non-rigid image alignment is a difficult non-linear optimization problem involving many parameters and often large datasets. Previous methods have explored various metrics and optimization strategies. Good results have been previously achieved with simple metrics, requiring complex optimization, often with many unintuitive parameters that require careful tuning for each dataset. In this chapter, the problem is restructured to use a simpler, iterative optimization algorithm, with very few free parameters. The warps are refined using an iterative Levenberg-Marquardt minimization to the mean, based on updating the locations of a small number of points and incorporating a stiffness constraint. This optimization approach is eff

... Show More
View Publication
Publication Date
Wed Jul 31 2019
Journal Name
Journal Of Engineering
Experimental Investigation of Vibration Stress Relief of A106 Steel Pipe T-Welded Fittings
...Show More Authors

This research examines the use of vibratory treatments to reduce residual stresses in small welded parts. In this experimental investigation, a post weld vibration treatment was applied to T- A106 steel pipe fitting specimens to study the effect of the treatment on the residual stress and the hardness of the material. The vibratory stress relief treatment was carried out at different vibration frequency. The results have demonstrated that post-weld vibratory stress relief of small size fittings is possible and residual stress may be relieved, and the treatment may be an alternative method for heat treatment especially when unchange in dimensions and material stability are required.

 

View Publication Preview PDF
Crossref
Publication Date
Sun Dec 30 2018
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Analysis of Stuck Pipe Incidents in Khabaz Field
...Show More Authors

There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.
Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe event

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Dec 30 2018
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Analysis of Stuck Pipe Incidents in Khabaz Field
...Show More Authors

There are many events which causes nonproductive time (NPT) in the drilling industry. The mostly effective in this NPT is pipe sticking event. A considerable amount of time and resources can be spent in efforts to free a stuck pipe. In addition, Unsuccessful fishing operations results in costly alternatives including side-tracking. The drilling in Khabaz oil field poses many operational challenges among of them stuck pipe , lost circulation, flow of salt water during drilling, and hole caving. Stuck pipe can be considered the quite difficult problem in Khabaz oil field due to associated incidents which lead to NPT activities.Well Khabaz -34 was selected to study the problem of stuck pipe in this field. An analysis of stuck pipe even

... Show More
Crossref (2)
Crossref
Publication Date
Sun Jan 30 2022
Journal Name
Heat Transfer
Theoretical and experimental investigation of a heat pipe heat exchanger for energy recovery of exhaust air
...Show More Authors

Heat pipes and two‐phase thermosyphon systems are passive heat transfer systems that employ a two‐phase cycle of a working fluid within a completely sealed system. Consequently, heat exchangers based on heat pipes have low thermal resistance and high effective thermal conductivity, which can reach up to the order of (105 W/(m K)). In energy recovery systems where the two streams should be unmixed, such as airconditioning systems of biological laboratories and operating rooms in hospitals, heat pipe heat exchangers (HPHEs) are recommended. In this study, an experimental and theoretical study was carried out on the thermal performance of an air‐to‐air HPHE filled with two refrigerants as working fluids, R22 and R407c. The heat pipe he

... Show More
Scopus (11)
Crossref (10)
Scopus Clarivate Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Arpn Journal Of Engineering And Applied Sciences
Numerical and experimental analysis of transient temperature and residual thermal stresses in friction stir welding of aluminum alloy 7020-T53
...Show More Authors

Scopus (2)
Scopus
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Engineering
Numerical and experimental investigation on the performance of the capillary tube using R-134a and R-600a
...Show More Authors

In this paper, isobutane (R-600a) is used as a suitable substitute for (R-134a) when changing the length of capillary tube. And the experimental data on capillary tube are obtained under different conditions such as (subcooling and ambient temperatures) on domestic refrigerator (9ft3 size), this data shows that (R-600a) a suitable substitute for (R134a) .The test presented a model for a steady state, two-phase flow in capillary tube for vapour compression system .The numerical model depends on conservation equations (mass, energy and momentum) as wall as the equation of state for refrigerant. The solution methodology was implemented by using finite difference techniques. The system results indicate that it is possible to change the refri

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Apr 15 2018
Journal Name
Strojniški Vestnik - Journal Of Mechanical Engineering
Comparative Experimental and Numerical Investigation on Electrical Discharge Drilling of AISI 304 using Circular and Elliptical Electrodes
...Show More Authors

This work introduces a new electrode geometry for making holes with high aspect ratios on AISI 304 using an electrical discharge drilling (EDD) process. In addition to commercially available cylindrical hollow electrodes, an elliptical electrode geometry has been designed, manufactured, and implemented. The principal aim was to improve the removal of debris formed during the erosion process that adversely affects the aspect ratio, dimensional accuracy, and surface integrity. The results were compared and discussed to evaluate the effectiveness of electrode geometry on the machining performance of EDD process with respect to the material removal rate (MRR,) the electrode wear rate (EWR), and the tool wear ratio (TWR). Dimensional features an

... Show More
View Publication
Scopus (7)
Crossref (2)
Scopus Clarivate Crossref
Publication Date
Fri Jan 01 2021
Journal Name
International Journal Of Thermal Sciences
Experimental and numerical investigations of heat transfer enhancement in shell and helically microtube heat exchanger using nanofluids
...Show More Authors

View Publication
Scopus (42)
Crossref (39)
Scopus Clarivate Crossref
Publication Date
Sat Jan 07 2023
Journal Name
Transportation Infrastructure Geotechnology
Numerical Study of the Seismic Response of Closed-Ended Pipe Pile in Cohesionless Soils
...Show More Authors

Scopus (13)
Crossref (8)
Scopus Clarivate Crossref