Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects
...Show More Authors

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identify the values and principles of Agile project management, which can be applied in the Iraqi construction industry to be adopted it as a new method to manage the construction projects in Iraq. The researcher reviewed the relevant literature to define the method of Agile project management and its methods and impact on the construction project. Then, the researcher conducted a questionnaire survey of a sample of engineers' experts who work in four main parties in the construction project: (beneficiary, supervising, designer, and contractor). The results of this survey showed that it is possible to apply the four values of Agile project management for managing the Iraqi construction projects, and can apply eleven of the twelve principles of Agile project management for managing the Iraqi construction projects.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Tue Mar 01 2016
Journal Name
Journal Of Engineering
A reformation Study about the Construction Management in the Primary Stage Curricula’s for the Civil Engineering in Some of the Iraqi Universities
...Show More Authors

There is no doubt that the field of education and teaching (in any country and whatever its ruling system varies “d”) is considered one of the most specific and sensitive field, because it is related to the building of human. And as the human is a purpose (aim) and the means in the same time and he is the strategist capital, so he way of his rearing, education, choosing the educator, methods of working and the aims are considered serious matters.

     The educational process has aim determined by the society for him self through its working establishments in this field and these are the official and public establishments. And as he feels that the establishments have failed to achieve its d

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Wed Apr 01 2015
Journal Name
Al–bahith Al–a'alami
The Functional Construction of Advertisements in the Iraqi Press Websites
...Show More Authors

Communication and media technologies have seen several changes in the last two decades. These changes put the basis for the emergence of communicative and media practices on several levels including political, economic, technological and artistic. And these, in turn, led to the emergence of new media trends and phenomena in various areas of media worthily to be studied and researched for example online advertisings.                                                                                          Online advert

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
International Journal Of Mechanical Engineering
Innovations and Requirements of Strategy for Digital Maintenance Management in Construction Project
...Show More Authors

Scopus (2)
Scopus
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Application of Geographic Information System for Preparing the Bill of Quantities of Construction Projects
...Show More Authors

The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Nov 01 2024
Journal Name
Practice Periodical On Structural Design And Construction
Risks Associated with Using Drones in Construction for Safety Management
...Show More Authors

View Publication
Scopus (6)
Crossref (8)
Scopus Crossref
Publication Date
Fri Apr 22 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Developing models to predicting the effect of crises on construction projects using MLR technique
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Thu Mar 01 2018
Journal Name
Journal Of Engineering
Risks of Design Stage in Iraqi Construction Project
...Show More Authors

The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.

It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Tue Dec 22 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Cost Management of construction industries according to the fast-track method
...Show More Authors

Construction projects have become a changing dramatically in recent decades and that the goal of the beneficiaries of the implementation of structural project is to complete the work with less time and within the cost of the specific and the best possible quality may sometimes happen that highlights the importance of time on the rest of the items at the implementation of projects for various reasons, including the need to use the project as soon as possible possible change rapidly to customer's requests, but the high cost of the project represents the biggest obstacle for entrepreneurs with its effects on the quality and the time workers, and is a measure of those elements in monetary terms is the key to integration between them, so the

... Show More
View Publication Preview PDF