The cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost management, the types of housing cost, the method of control and the most important planning and design strategies to be adopted in order to achieve efficient cost management in housing projects. One local project under construction was selected as case study, to evaluate the application of the indicators the efficiency of the cost management on planning and design levels.
Residential complexes have witnessed a great demand in most countries worldwide, as they are one of the main infrastructure elements, in addition to achieving a developed urban landscape. However, complex residential projects in developing countries face various factors that could be improved in their implementation, especially in Iraq. Sixty-two experts in residential complex projects were interviewed and surveyed to verify these projects' failure factors,. Fifty-one factors were the main failure factors, divided into four main components (leadership, management system, external forces, and project resources). The Relatively Important Index (RII) is used to determine the relative importance factors and obtain the top tw
... Show MoreConstruction projects have a special nature and affect them many factors making them exposed to multiple risks as a result of the length of the implementation period and the multiplicity of stages, starting from the decision stage through implementation until the final delivery, which leads to increased uncertainty and the likelihood of risk.
The process of analysis and risk management is one of the effective and productive methods that are used in managing the construction projects for the purpose of increasing the chances of ending the project successfully in terms of cost, time and quality and at the lowest possible problems.
The research aims first to the effective planning for analysis and risk managemen
... Show MoreABSTRACT
This study aimed to choose top stocks through technical analysis tools specially the indicator called (ratio of William index), and test the ability of technical analysis tools in building a portfolio of shares efficient in comparison with the market portfolio. These one technical tools were used for building one portfolios in 21 companies on specific preview conditions and choose 10 companies for the period from (March 2015) to (June 2017). Applied results of the research showed that Portfolio yield for companies selected according to the ratio of William index indicator (0.0406) that
... Show MoreTax is an important financial resource that the state depends on in all its economic, political, and social fields. Nevertheless, the role of the tax is highlighted in raising tax revenues and influencing economic variables, such as savings, consumption, investment, and employment. The tax was taken as an important tool to stimulate investment in industrial projects because of this activity's important role in raising the efficiency of economic development and reviving the national economy, as many industrial investment laws were enacted and the most important thing included was exempting industrial projects from all taxes and fees (5-10) years, and an exemption Profits from income tax for a period of 5 years starting from the year in which
... Show MoreThe governmental projects are considers the prevailing in Iraq, as most of the projects implemented by the Government, the major role played by governmental projects in the provision of services to citizens and improve the economic situation in the country in general, in addition to the huge number of these projects implemented by the governmental organizations and the large failure rates of it , and because of the fact that these projects are stumbled before they reach the stage of failure, The aim of this research to identify the main factors for the stumble projects in addition to identifying the most influential factor on the causes and consequences of it , like (cost overruns , time overruns , delay and scope
... Show MoreThe study aimed at interpreting the role of architectural design quality in in build competitiveness model in accordance with the proposal included the idea of architectural design quality for its removal; interesting design factors of the environment, good design of the spaces, and design aesthetic explanatory variable. The competitiveness dimensions; the level of innovation, stimulate research, and the quality of the company's products, and activating the role of human resources, entrepreneurship, profitability, market share and competitiveness, variable responsive. The study of construction companies in the Ministry of Housing and Construction has taken the Iraqi society for the study. The sample consisted of (48) manage
... Show MoreMobile ad hoc network is nothing but the temporary network which is having the collection of mobile nodes. Routing and broadcasting are major operations of MANET network. The major operation in ad hoc mobile network is the broadcasting which sometime results to storm problem of the broadcast if the forwarding mechanism is not properly designated. Thus the challenges in the MANET are to reduce the broadcasting redundancy and under high transmission error rate provides high delivery ratio. Hence in our proposed research, we are introducing and investigating the new mechanism of broadcasting called Dual Covered Broadcast. This method takes the broadcast redundancy advantage order to improve packet delivery ratio especially under environments w
... Show MoreThe main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show MoreEffective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formul