Preferred Language
Articles
/
joe-510
Efficient Cost Management in the Housing Projects
...Show More Authors

The cost management of cost indicators in housing projects, on the level of planning and design, is the most important quality indicators, for adoption of strategies of planning and design efficient in managing these indicators. So this research points out the need to highlight the most effective and influential cost indicators in housing projects, and to determine strategies in the management of these indicators in order to raise the efficiency of housing projects quality, to seemly the income level target group, taking into consideration the quality of housing standards, to achieve the basic requirements of housing. This paper highlights the importance of the cost  management, the types of housing cost, the method of  control and the most important planning and design strategies to be adopted in order to achieve efficient cost management in housing projects. One local project under construction was selected as case study, to evaluate the application of the indicators the efficiency of the cost management on planning and design levels.

View Publication Preview PDF
Quick Preview PDF
Publication Date
Mon Jul 19 2021
Journal Name
Surgical Neurology International
Efficacy of Gamma Knife radiosurgery in the management of pituitary prolactinoma
...Show More Authors
Background:

Gamma Knife radiosurgery (GKR) has been widely used in the management of a variety of intracranial tumors, including pituitary adenomas. Pituitary prolactinoma (Prs) is one of the most common types of these adenomas.

Methods:

This prospective study included 50 patients with pituitary Prs over a period from June 2017 to June 2018 at the Neurosciences Hospital, Baghdad/Iraq. The GKR procedure was performed using the Leksell Gamma Knife® Perfexion™, 192 beams of Cobalt 60 radiation were delivered through the intact skull to the pituitary Prs.

... Show More
View Publication
Scopus Crossref
Publication Date
Wed Mar 29 2017
Journal Name
Iraqi Journal Of Pharmaceutical Sciences ( P-issn 1683 - 3597 E-issn 2521 - 3512)
Goserelin versus Norethisterone in the Management of Menorrhagia with Uterine Fibroid
...Show More Authors

Menorrhagia is common in patients with uterine fibroids, if operation needs to be delayed for a particular reason, goserelin can be used safely to reduce bleeding and the size of the tumor.The objective is to compare between goserelin acetate and norethisterone on patients with menorrhagia and uterine fibroid. A randomized controlled study conducted in Elwiya maternity teaching hospital, Baghdad from the first of November 2007 to the end of April 2009. 90 patients from the consultant outpatient clinic with menorrhagia and fibroid, and their operations were delayed for medical reason were allocated in two groups, the first group, was given 3.2 mg goserelin acetate subcutaneously monthly for 3 months and the second group was given 5 mg nor

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Dec 11 2021
Journal Name
Iraqi Journal Of Pharmaceutical Sciences ( P-issn 1683 - 3597 E-issn 2521 - 3512)
Community Pharmacists' Attitudes and Practice in the Management of Minor Ailments
...Show More Authors

This study aimed to know the attitudes and practice of pharmacists regarding the management of minor ailments in Iraqi community pharmacies. A cross-sectional study for 320 community pharmacists was conducted during February 2020 using a newly developed and validated questionnaire. Only 4.4% of pharmacists prefer not to deal with minor ailment cases. Minority (15.6%) of participated pharmacists refer more than half of minor ailment cases they face to the physician. Regarding the assessment of minor ailments using WWHAM technique, what are the symptoms are the most commonly asked questions by pharmacists. Only 49.1% mentioned that they ask all WWHAM questions. On the other hand, most pharmacists (90%) educate their patients about the dosi

... Show More
View Publication Preview PDF
Scopus (5)
Crossref (1)
Scopus Crossref
Publication Date
Thu Sep 01 2016
Journal Name
Current Pharmaceutical Design
Dry Eye Disease: Present Challenges in the Management and Future Trends
...Show More Authors

View Publication
Scopus (39)
Crossref (41)
Scopus Clarivate Crossref
Publication Date
Sun Apr 08 2018
Journal Name
Al-khwarizmi Engineering Journal
Building a Management System to Control the Construction Claims in Iraq
...Show More Authors

The paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main

... Show More
View Publication Preview PDF
Crossref (5)
Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Application of Geographic Information System for Preparing the Bill of Quantities of Construction Projects
...Show More Authors

The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Apr 22 2022
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Developing models to predicting the effect of crises on construction projects using MLR technique
...Show More Authors

View Publication
Scopus (1)
Crossref (1)
Scopus Crossref
Publication Date
Tue Jan 12 2016
Journal Name
Wireless Networks
Low communication cost (LCC) scheme for localizing mobile wireless sensor networks
...Show More Authors

In recent years, the number of applications utilizing mobile wireless sensor networks (WSNs) has increased, with the intent of localization for the purposes of monitoring and obtaining data from hazardous areas. Location of the event is very critical in WSN, as sensing data is almost meaningless without the location information. In this paper, two Monte Carlo based localization schemes termed MCL and MSL* are studied. MCL obtains its location through anchor nodes whereas MSL* uses both anchor nodes and normal nodes. The use of normal nodes would increase accuracy and reduce dependency on anchor nodes, but increases communication costs. For this reason, we introduce a new approach called low communication cost schemes to reduce communication

... Show More
View Publication
Scopus (34)
Crossref (26)
Scopus Clarivate Crossref
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The role of TD-ABC approach in decreasing of cost per unit: Applied study in the General company of Hydraulic Industries \ Plastic Factory
...Show More Authors

The aim of the research is to use this technique and to determine the effect of this method in reduce cost per unit of the company. The traditional method used in the company the research sample to determine the indirect costs, the definition of the concepts and characteristics of the method of cost-based activity and the cost method based on time-driven activity and justifications applied to companies.   In order to achieve the research objectives, the main hypotheses were formulated. That was represented: (The applied of (TDABC) Time driven activity based costing method in reducing indirect costs, leads reduce cost per unit than the use of the traditional method of allocating indirect costs in the research sample company).&nb

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Performance Evaluation of the Investment Projects during the Implementation Phase (Najaf province as a case study)
...Show More Authors

The construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.

The question is, was the optimum implementation accomplished? The provision for the success of the project

... Show More
View Publication Preview PDF