Low incoming discharge upstream of Samarra-Al Tharthar System leads to sediment accumulation and forming islands, especially an island upstream of Al Tharthar Regulator. This island and the sedimentation threaten the stability of the structure and reduce the efficiency of the system. This study aims to hydraulically identify the sedimentation problem mentioned above, to find solutions of how to control the sediment problems, and to develop the capacity of
the system for 500 years return period flood of 15060 m3/s. Surface Water Modeling System (SMS10.1) with two dimensional depth average models (RMA-2) software were used to simulate and analyze the system. The results of analysis showed that the maximum permissible discharge through the system was 8250 m
3/s where the discharge from Samarra Barrage was 2400 m3/s to avoid flooding in Baghdad city. The water surface level could be lowered during constructing;
the new Al Tharthar Regulator expansion capacity of 7000 m3/s in the case of peak flood (15060 m3/s) to 68.51 m.a.m.s.l. upstream of Samarra Barrage by dredging the island and channel. On the other hand, during constructing the guide bank, and dredging the island and channel, the water surface elevation was 68.91 m.a.m.s.l. upstream of Samarra Barrage.
Single phase capacitor-run induction motors (IMs) are used in various applications such as home appliances and machine tools; they are affected by the sags or swells and any fault that can lead to disturb the supply and make it produce rms voltage below or above the rated motor voltage, which is 220V. A control system is designed to regulate the output voltage of the converter irrespective to the variation of the load and within a specific range of supply voltage variation. The steady-state equivalent circuit of the Buck-Boost chopper type AC voltage regulator, as well as the analysis of this circuit are presented in this paper. Switching device for the regulator is an IGBT Module. The proposed chopper uses pulse width modulation (PWM) c
... Show MoreThis study is a numerical investigation of the performance of reinforced concrete (RC) columns after fire exposure. This study aims to investigate the effect of introducing lateral ties and using the RC jacket on improving post-fire behavior of these columns, the effect of the duration of the fire on ultimate load of columns. The analysis was performed through ABAQUS, a 3D – non-linear finite element program. 4 m tall lengthening square RC column with a cross- section of 0.4 m × 0.4 m was used as a test specimen. The RC column was reinforced by 4Ø28 mm longitudinal bars bonded by steel tie bars of Ø10 mm spaced at 400 mm. The firing temperature was increased to 60
Background: To assess the alveolar bone crest level (ABCL) by Cone Beam Computed To-mography (CBCT) and to investigate several variables as predictors for the height of the alveolar bone in adolescents. Materials and methods: Age, sex, and ethnic groups were rec-orded for each patient. CBCT images were used to obtain measurements of the interproximal alveolar bone level from the cementoenamel junction (CEJ) to the alveolar crest. The highest measurement in each sextant was recorded along with any presence of a vertical bone defect or calculus. Results: Total of 720 measurements were recorded for 120 subjects. No vertical bony defects or calculus were observed radiographically. Statistically significant (P< 0.05) differences were observed be
... Show More