Preferred Language
Articles
/
joe-482
Performance Improvement of the Implementation of Concrete Structures in the Construction Sector In Iraq Using The Modern Management Technique “Six Sigma”
...Show More Authors

The reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of quality and the Six Sigma methodology as a system aims to reduce defects and improve the quality and secondly on the field study carried out by the researcher through conducting the open questionnaire that include interviews conducted by the researcher with a slice of engineers experienced in the implementation of construction projects that leads to design closed questionnaire included the major axes of  the research and distributed on a selected sample of engineers with expertise in this area. The researcher applying the (DMAIC) methodology is one of the methods adopted for the application of Six Sigma on the case study (the project of structures laboratory at University of Baghdad) for the purpose of identifying the most important defects that may appear in the implementation of the concrete structure and assess the quality of implementation of the concrete structure and then analyzing the causes of these defects and propose procedures to enhance the performance and quality improvement depending on the field survey was conducted. The most important research conclusions are sigma level for the case study is 2.35 and the number of defects per million opportunities is 211905 and this Sigma level is very small which indicates the low level of quality for the case study.

 

View Publication
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Quality Evaluation of Al-Rasheed Ready Concrete Mixture Plant By Using Six Sigma Approach
...Show More Authors

The objective of this research work is to evaluate the quality of central concrete plant of Al-Rasheed Company by using Six Sigma approach which is a measure of quality that strives for near elimination of defects using the statistical methods to improve outputs that are critical to customers. The fundamental objective of Six Sigma methodology is the implementation of a measurement-based strategy that focuses on process improvement and variation reduction to reach delighting customers, and then suggesting an improvement system to improve the production of concrete in Al-Rasheed State Contracting Construction Company.
A field survey includes two parts (open and close questionnaire) that aimed to get the data and information required f

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Green Engineering
Sustainability and recovery project management implementation on construction projects in Iraq
...Show More Authors

Scopus (1)
Scopus
Publication Date
Sun Dec 01 2013
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Multi-pages structure for Six Sigma performance matrix based on the technical characteristics of balanced performance and methodology Al-Sigma for measuring corporate performance: Suggestion vision
...Show More Authors

Accelerates operating managements in the facilities contemporary business environment toward redefining processes and strategies that you need to perform tasks of guaranteeing them continue in an environment performance dominated by economic globalization and the circumstances of uncertainty attempt the creation of a new structure through multiple pages seek to improve profitability and sustainable growth in performance in a climatefocuses on the development of institutional processes, reduce costs and achieve customer satisfaction to meet their demands and expectations are constantly changing. The research was presented structural matrix performance combines methodology Alsigma in order to improve customer satisfaction significantly bet

... Show More
View Publication Preview PDF
Publication Date
Fri Mar 01 2013
Journal Name
Applied Mechanics And Materials
Measure and Analyze the Problems of Concrete Mixture Production via Six Sigma DMAIC Tools: Central Concrete Mix Plant as a Case Study
...Show More Authors

The aims of this study are to measure the defect rate and analyze the problems of production of ready concrete mixture plant by using Six Sigma methodology which is a business strategy for operations improvement depending basically on the application of its sub-methodology DMAIC improvement cycle and the basic statistical tools where the process sigma level of concrete production in the case study was 2.41 σ.

View Publication
Scopus (3)
Crossref (2)
Scopus Crossref
Publication Date
Tue Oct 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
apply Six Sigma in improving the quality of projects added expert system )Applied research(
...Show More Authors

Construction projects need methods and techniques to ensure the level of quality and commensurate with the level required and documented in the project contract. The quality of the project is affected by the quality of the inputs and accompanying procedures in the construction of the project.

Al-Rumaitha residential project found that the quality of the concrete for the ceilings in the research sample (the roof of the third floor of buildings A25 and A26) and (roof of the second floor of buildings A27, A28, A29, A30, A31, A32 and A33) and roof of buildings A15 and A16 A19)) is not the required quality level.

The idea of the research came after the need to improve the performance o

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Jun 26 2021
Journal Name
Asian Journal Of Civil Engineering
Using AHP to prioritize the corruption risk practices in the Iraqi construction sector
...Show More Authors

View Publication
Scopus (6)
Crossref (5)
Scopus Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)
...Show More Authors

This paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Apr 12 2019
Journal Name
Journal Of Economics And Administrative Sciences
Balanced Scorecard (BSC) role And Six Sigma in improving strategic performance A sample study of the members of the General Company for Northern Cement
...Show More Authors

Assessing performance efficiency is critical to the management need for oversight, planning, and continuous periodic evaluation of the multiple activities of Northern Cement State Company in order to determine the level of achievement of the objectives set, and to correct the deviations and delays that the evaluation shows and limitation of liability. What cannot be measured cannot be managed. The aim of this research is to highlight the impact of using BSC, financial and non-financial, to give comprehensive and clear picture of the company's performance and to measure the quality of its performance by using six-sigma and the level of deviations in achieving the planned goals. Therefore, four-key hypotheses were formulated for th

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Jul 01 2016
Journal Name
Journal Of Engineering
Identificatio n Of Key Factors Affecting Waste Management In Life Cycle Of The Construction Project By Using Delphi Technique
...Show More Authors

The problem of generated waste as a result of the implementation of construction projects, has  been aggravated recently because of construction activity experienced by the world, especially Iraq, which is going through a period of reconstruction, where construction waste represents (20-40%) of the total generated waste and has a negative effect on the environment and economic side of the project. In addition, the rate of consumpted  amounts of natural resources are estimated to be about 40% in the construction industry, so it became necessary to reduce waste and to be manage well. This study aims to identify the key factors affecting waste management through the various phases of the project, and this is accom

... Show More
View Publication Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Evaluating the Knowledge for Integrating RM and VM Using BIM in the Iraqi Construction Sector
...Show More Authors

The construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire

... Show More
View Publication Preview PDF
Crossref (1)
Crossref