Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area
...Show More Authors

This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project.  Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded. 

   

View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Dec 01 2009
Journal Name
Journal Of Economics And Administrative Sciences
The moral dimension of generating and destroying value Through the implementation of the Balanced Scorecard
...Show More Authors

يسعى المجتمع من خلال الوحدات الإقتصادية إلى الوصول إلى تحقيق أفضل الإنجازات التي لا تتمثل بالسلع والخدمات حسب وإنما بما يتحقق من مردود لكافة الاطراف المعنية بالوحدات الإقتصادية على ان لايتم ذلك على حساب قيم المجتمع وأخلاقياته وآدابه العامة. وعليه تصبح الوحدات الإقتصادية مسرحاً لصراعات قوى متعددة كل منها له قيمه الأخلاقية سواء كان فرداً أومجموعة افراد أو وحدة إقتصادية أو أي جهة أُخرى، وبحكم مسؤولياته

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Nov 26 2017
Journal Name
Journal Of Engineering
The Dynamic Behavior of Water Flowing Through Packed Bed of Different Particle Shapes and Sizes
...Show More Authors

An experimental study was conducted on pressure drop of water flow through vertical cylindrical packed beds in turbulent region and the influence of the operating parameters on its behavior. The bed packing was made of spherical and non-spherical particles (spheres, Rasching rings and intalox saddle) with aspect ratio range 3.46  D/dp  8.486 obtaining bed porosities 0.396 0.84 and Reynolds number 1217  21758. The system is consisted of 5 cm inside diameter Perspex column, 50 cm long; distilled water was pumped through the bed with flow rate 875, 1000, 1125, 1250,1375 and 1500 l/h and inlet water temperature 20, 30, 40 and 50 ˚C. The packed bed system was monitored by using LabVIEW program, were the result

... Show More
View Publication Preview PDF
Publication Date
Tue Feb 01 2022
Journal Name
Svu-international Journal Of Engineering Sciences And Applications
Water Quality Detection using cost-effective sensors based on IoT
...Show More Authors

Crossref (4)
Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
design Electronic cost accounting system for the Iraqi Airways Company
...Show More Authors

The research Was based to on a real problem and realistically of represented by that  Iraqi Airways company does not have the electronic cost accounting system and therefore  be the process of  the pricing various services provided by a company sample research respecting  air transport and air cargo and aviation fuel and services and catering are not properly especially in the presence of new data from the new companies entering competition in Iraqi aviation industry and therefore does not provide price flexibility in order to compete in getting market share, And then research this problem addressed through design an electronic cost Accounting system covers all the costs incurred by the compan

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
View Publication
Scopus (5)
Crossref (4)
Scopus Clarivate Crossref
Publication Date
Thu Jul 07 2022
Journal Name
Public Works Management & Policy
Impact of Pandemic SARS COVID-19 on Different Construction Project Management: Problems and Solutions
...Show More Authors

This study discusses risk management strategies caused by pandemic-related (Covid-19) suspensions in thirty-six engineering projects of different types and sizes selected from countries in the middle east and especially Iraq. The primary data collection method was a survey and questionnaire completed by selected project crew and laborers. Data were processed using Microsoft Excel to construct models to help decision-makers find solutions to the scheduling problems that may be expected to occur during a pandemic. A theoretical and practical concept for project risk management that addresses a range of global and local issues that affect schedule and cost is presented and results indicate that the most significant delays are due to a

... Show More
Scopus (6)
Crossref (6)
Scopus Clarivate Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Geotechnical Engineering And Sustainable Construction
Determine the Most Common Geotechnical Risks and Their Impacts on the Cost and Time Schedule for Implementing Water Treatment Plants in Iraq
...Show More Authors

View Publication
Crossref
Publication Date
Sun Mar 01 2009
Journal Name
Diyala Journal Of Human Research
Stability of the Finite Difference Methods of Fractional Partial Differential Equations Using Fourier Series Approach
...Show More Authors

The fractional order partial differential equations (FPDEs) are generalizations of classical partial differential equations (PDEs). In this paper we examine the stability of the explicit and implicit finite difference methods to solve the initial-boundary value problem of the hyperbolic for one-sided and two sided fractional order partial differential equations (FPDEs). The stability (and convergence) result of this problem is discussed by using the Fourier series method (Von Neumanns Method).

View Publication Preview PDF
Publication Date
Wed Jan 01 2020
Journal Name
Journal Of Mechanical Engineering Research And Developments
Real-time control of robotic hand by human hand at low cost
...Show More Authors

Scopus (4)
Scopus
Publication Date
Mon Apr 01 2024
Journal Name
Iraqi Postgraduate Medical Journal
Estimation of Prevalence rate of Sjogren’s syndrome among Rheumatology clinic patients in Iraq
...Show More Authors

View Publication
Crossref