Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area
...Show More Authors

This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project.  Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded. 

   

View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Engineering
Estimation of Mass Transfer Coefficient for Copper Electrowinning Process
...Show More Authors

Mass transfer was examined at a stationary rectangular copper electrode (cathode) by using the reduction of cupric ions as the electrochemical reaction. The influence of electrolyte temperature (25, 45, and 65 oC), and cupric ions concentration (4, 8, and 12 mM) on mass transfer coefficient were investigated by using limiting current technique. The mass transfer coefficient and hence the Sherwood number was correlated as Sh =

 

View Publication Preview PDF
Publication Date
Wed May 10 2023
Journal Name
Journal Of Engineering
Cross Dipole Antennas Solution for Angle of Arrival Estimation
...Show More Authors

The Multiple Signal Classification (MUSIC) algorithm is the most popular algorithm to estimate the Angle of Arrival (AOA) of the received signals. The analysis of this algorithm (MUSIC) with typical array antenna element ( ) shows that there are two false direction indication in the plan
aligned with the axis of the array. In this paper a suggested modification on array system is proposed by using two perpendiculars crossed dipole array antenna in spite of one array antenna. The suggested modification does not affect the AOA estimation algorithm. The simulation and results shows that the proposed solution overcomes the MUSIC problem without any effect on the performance of the system.

View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Aip Conference Proceedings
Estimation of (S-S) reliability for inverted exponential distribution
...Show More Authors

View Publication
Scopus Crossref
Publication Date
Wed Jun 01 2011
Journal Name
Journal Of Economics And Administrative Sciences
"Comparison of Approximate Estimation Methods for Logistics Distribution Teachers"
...Show More Authors

The goal beyond this Research is to review methods that used to estimate Logistic distribution parameters. An exact estimators method which is the Moment method, compared with other approximate estimators obtained essentially from White approach such as: OLS, Ridge, and Adjusted Ridge as a suggested one to be applied with this distribution. The Results of all those methods are based on Simulation experiment, with different models and variety of  sample sizes. The comparison had been made with respect to two criteria: Mean Square Error (MSE) and Mean Absolute Percentage Error (MAPE).  

View Publication Preview PDF
Crossref
Publication Date
Wed Jul 05 2017
Journal Name
International Journal Of Science And Research (ijsr)
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Mon Oct 22 2018
Journal Name
Journal Of Economics And Administrative Sciences
Using Mehar method to change fuzzy cost of fuzzy linear model with practical application
...Show More Authors

  Many production companies suffers from big losses because of  high production cost and low profits for several reasons, including raw materials high prices and no taxes impose on imported goods also consumer protection law deactivation and national product and customs law, so most of consumers buy imported goods because it is characterized by modern specifications and low prices.

  The production company also suffers from uncertainty in the cost, volume of production, sales, and availability of raw materials and workers number because they vary according to the seasons of the year.

  I had adopted in this research fuzzy linear program model with fuzzy figures

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri May 01 2020
Journal Name
Environmental Technology & Innovation
Environmental remediation of synthetic leachate produced from sanitary landfills using low-cost composite sorbent
...Show More Authors

Scopus (37)
Crossref (32)
Scopus Clarivate Crossref
Publication Date
Tue Mar 01 2011
Journal Name
Journal Of Economic And Administrative Science
On Shrinkage Estimation for Generalized Exponential Distribution
...Show More Authors

Preview PDF
Publication Date
Sun May 11 2025
Journal Name
Iraqi Statisticians Journal
Nonparametric Estimation for Nonstationary Time Series Models
...Show More Authors

View Publication
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref