Preferred Language
Articles
/
joe-38
Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique
...Show More Authors

In this research,  Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP) which is one of  multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP) technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect.  The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %).   

View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jun 01 2025
Journal Name
Journal Of Physics: Conference Series
Measuring Urban Heat Island Indicators from Surface Temperature Using Spatial Techniques
...Show More Authors
Abstract<p>Using remote sensing technology and modeling methodologies to monitor changes in land surface temperature (LST) and urban heat islands (UHI) has become an essential reference for making decisions on sustainable land use. This study estimates LST and UHI in Salah al-din Province to contribute to land management, Urban planning, or climate resilience in the region; as a result of environmental changes in recent years, LANDSAT Satellite Imagery from 2014- 2024 was implemented to estimate the LST and UHI indexes in Salah al-din Province, ArcGIS 10.7 was use to calculate the indices, and The normalized mean vegetation index (NDVI) was calculated as it is closely related to extracting (LST </p> ... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Feb 10 2019
Journal Name
Journal Of The College Of Education For Women
Development and Implementation a Programmable Model for Evaluation Pumping Technique
...Show More Authors

This work represents development and implementation a programmable model for evaluating pumping technique and spectroscopic properties of solid state laser, as well as designing and constructing a suitable software program to simulate this techniques . A study of a new approach for Diode Pumped Solid State Laser systems (DPSSL), to build the optimum path technology and to manufacture a new solid state laser gain medium. From this model the threshold input power, output power optimum transmission, slop efficiency and available power were predicted. different systems configuration of diode pumped solid state laser for side pumping, end pump method using different shape type (rod,slab,disk) three main parameters are (energy transfer efficie

... Show More
View Publication Preview PDF
Publication Date
Sun Sep 05 2010
Journal Name
Baghdad Science Journal
Effect of Partial Coherence illuminated bar on evaluation technique of diffraction image
...Show More Authors

In this work, we are obviously interested in a general solution for the calculation of the image of a single bar in partially coherent illumination. The solution is based on the theory of Hopkins for the formation of images in optical instruments in which it was shown that for all practical cases, the illumination of the object may be considered as due to a self – luminous source placed at the exit pupil of the condenser , and the diffraction integral describing the intensity distribution in the image of a single bar – as an object with half – width (U0 = 8 ) and circular aperture geometry is viewed , which by suitable choice of the coherence parameters (S=0.25,1.0.4.0) can be fitted to the observed distribution in various types of mi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Mar 01 2010
Journal Name
Journal Of Economics And Administrative Sciences
Planning the main production tables using the correct binary programming method
...Show More Authors

This research include building mathematical models for aggregating planning and shorting planning by using integer programming technique for planning master production scheduling in order to control on the operating production for manufacturing companies to achieve their objectives of increasing the efficiency of utilizing resources and reduce storage and  improving customers service  through  deliver in the actual dates and reducing delays.

View Publication Preview PDF
Crossref
Publication Date
Tue Jun 01 2021
Journal Name
Journal Of Planner And Development
Urban sustainability assessment for the urban renewal project in Al Shawaka a rea
...Show More Authors

Sustainability is a major demand and need pursued by cities in all areas of life due to the environmental, social and economic gains they provide, especially in the field of city planning and urban renewal projects that aim to integrate the past, present and future.

 

The research aims to evaluate the Haifa Street renewal project, and Al-Shawaka district, one of the Baghdad districts located next to Al-Karkh, was elected by comparing the sustainability indicators of urban renewal with the reality of the situation through a field survey and questionnaire form and focusing on the social and economic impacts and environmental for the project on the study area. To reach the most important conclusions and recommendations

... Show More
View Publication Preview PDF
Publication Date
Wed Oct 17 2018
Journal Name
Journal Of Economics And Administrative Sciences
Solve the fuzzy Assignment problem by using the Labeling method
...Show More Authors

The Assignment model is a mathematical model that aims to express a real problem facing factories and companies which is characterized by the guarantee of its activity in order to make the appropriate decision to get the best allocation of machines or jobs or workers on machines in order to increase efficiency or profits to the highest possible level or reduce costs or time To the extent possible, and in this research has been using the method of labeling to solve the problem of the fuzzy assignment of real data has been approved by the tire factory Diwaniya, where the data included two factors are the factors of efficiency and cost, and was solved manually by a number of iterations until reaching the optimization solution,

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jan 02 2012
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Image encryption technique using Lagrange interpolation
...Show More Authors

Publication Date
Sat Sep 30 2017
Journal Name
Al-khwarizmi Engineering Journal
Robot Arm Path Planning Using Modified Particle Swarm Optimization based on D* algorithm
...Show More Authors

Abstract

Much attention has been paid for the use of robot arm in various applications. Therefore, the optimal path finding has a significant role to upgrade and guide the arm movement. The essential function of path planning is to create a path that satisfies the aims of motion including, averting obstacles collision, reducing time interval, decreasing the path traveling cost and satisfying the kinematics constraints. In this paper, the free Cartesian space map of 2-DOF arm is constructed to attain the joints variable at each point without collision. The D*algorithm and Euclidean distance are applied to obtain the exact and estimated distances to the goal respectively. The modified Particle Swarm Optimization al

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Wed Dec 01 2010
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
إستخدام التحليل الهرمي (AHP) في المفاضلة لإختيار المجهزين: دراسة حالة في الشركة العامة للمسح الجيولوجي والتعدين
...Show More Authors

Analytical Hierarchy Process (AHP) belongs to the family of Multiple Criteria Decision Making (MCDM)  and has, recently, received a wide popularity in decision making regarding supplier selection.  The objective of this study is to apply the methodology of AHP on selecting suppliers to supply materials for the  Geological Survey and Mining  Company (GSMC).  Criteria for rating the suppliers and pairwise comparisons were identified by the members of the Tenders Analysis Committee (TAC). In order to judge the internal validity of the AHP, it was applied manually on a sample of fourteen tenders that were analyzed  and executed between 2004-2007, then an interactive computerized  package was developed 

... Show More
View Publication Preview PDF