Preferred Language
Articles
/
joe-389
Enhancing the Performance of Piezoelectric Energy Harvesters Using Permanent Magnets
...Show More Authors

A cantilevered piezoelectric beam with a tip mass at its free end is a common energy harvester configuration. This paper introduces a new principle of designing such a harvester which increases the generated voltage without changing the natural frequency of the harvester: The attraction force between two permanent magnets is used to add stiffness to the system. This magnetic stiffening counters the effect of the tip mass on the natural frequency. Three setups incorporating piezoelectric bimorph cantilevers of the same type in different mechanical configurations are compared theoretically and experimentally to investigate the feasibility of this principle. Theoretical and experimental results show that magnetically stiffened harvesters have important advantages over conventional setups. They generate more voltage and they can be tuned across a wide range of excitation frequencies.

 

 

View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Jun 01 2022
Journal Name
Applied Energy
Novel mathematical modeling, performance analysis, and design charts for the typical hybrid photovoltaic/phase-change material (PV/PCM) system
...Show More Authors

View Publication
Publication Date
Wed Jun 01 2022
Journal Name
Applied Energy
Novel mathematical modeling, performance analysis, and design charts for the typical hybrid photovoltaic/phase-change material (PV/PCM) system
...Show More Authors

Scopus (44)
Crossref (29)
Scopus Clarivate Crossref
Publication Date
Thu May 05 2016
Journal Name
Global Journal Of Engineering Science And Researches
EVALUATE THE RATE OF CONTAMINATION SOILS BY COPPER USING NEURAL NETWORK TECHNIQUE
...Show More Authors

The aim of this paper is to design suitable neural network (ANN) as an alternative accurate tool to evaluate concentration of Copper in contaminated soils. First, sixteen (4x4) soil samples were harvested from a phytoremediated contaminated site located in Baghdad city in Iraq. Second, a series of measurements were performed on the soil samples. Third, design an ANN and its performance was evaluated using a test data set and then applied to estimate the concentration of Copper. The performance of the ANN technique was compared with the traditional laboratory inspecting using the training and test data sets. The results of this study show that the ANN technique trained on experimental measurements can be successfully applied to the rapid est

... Show More
View Publication Preview PDF
Publication Date
Mon Oct 03 2016
Journal Name
Applied Research Journal
DETERMINATION OF THE GEOID HEIGHT (GEOID UNDULATION) BY USING MODERN SURVEYING TECHNOLOGIES
...Show More Authors

In this work, a large part of Baghdad University campus has been selected. The determination of Geoidal height for the local area requires Ground Control Points which both Ellipsoidal and Orthometric heights are known to compute the difference between them. The first step of the leveling process began by selected the Ground Control Points (GCPs) around the area of the work, and then divided them into two groups of the network traverse stations. They were leveled and adjusted depend on the number of the Bench Marks (B.M.s). Total Station TS (Nikon Nivo 5C) and Global Positioning System (GPS-Garmin 78 map) are used to do this application. The aim of the proposed work was to determine the height of the Geoid surface in the study area. The Geoi

... Show More
Publication Date
Mon Jul 01 2013
Journal Name
Http://www.i-csrs.org/volumes/gisars/vol.3/vol.3.1.1.july.12.pdf
Remote sensing technique to monitoring the risk of soil degradation using NDVI
...Show More Authors

In order to take measures in controlling soil erosion it is required to estimate soil loss over area of interest. Soil loss due to soil erosion can be estimated using predictive models such as Universal Soil Loss Equation (USLE). The accuracy of these models depends on parameters that are used in equations. One of the most important parameters in equations used in both of models is (C) factor that represents effects of vegetation and other land covers. Estimating land cover by interpretation of remote sensing imagery involves Normalized Difference Vegetation Index (NDVI), an indicator that shows vegetation cover. The aim of this study is estimate (C) factor values for Part of Baghdad city using NDVI derived from satellite Image of Landsat-7

... Show More
View Publication
Publication Date
Sat Aug 01 2020
Journal Name
Iop Conference Series: Materials Science And Engineering
Achieving the Benefits and Requirements of Integrated Project Delivery Method Using BIM
...Show More Authors
Abstract<p>Through the last decade, Integrated Project Delivery (IPD) methodology considers one of the new contractual relations that are also on the way to further integrate the process of combining design and instruction. On the other hand, Building Information Modeling (BIM) made significant advancements in coordinating the planning and construction processes. It is being used more often in conjunction with traditional delivery methods. In this paper, the researcher will present the achievement of IPD methodology by using BIM through applying on the design of the financial commission building in Mayssan Oil Company in Iraq. The building has not been constructed yet and it was designed by usin</p> ... Show More
View Publication
Scopus (7)
Crossref (9)
Scopus Crossref
Publication Date
Sun Jan 01 2012
Journal Name
كلية التربية-الجامعة المستنصرية
Study the diffusion of Hydrogen in metals using a Runge-Kutta method
...Show More Authors

Publication Date
Fri Nov 30 2018
Journal Name
Civil Engineering Journal
Determining the Causes of Punching Shear in Reinforced Slabs Using Fishbone Diagram
...Show More Authors

Risk identification and assessment can be analysed using many risk management tools. Fishbone diagram is one of these techniques which can be employed, for the identification of the causes behind the construction failure, which   has become a phenomenon that often gets repeated in several projects. If these failures are not understood and handled scientifically, it may lead to disputes between the project parties. Additionally, the construction failure also leads to an increase in the project budget, which in turn causes a delay in the completion of the projects. Punching shear in reinforcement slab may be one of the reasons for construction failures. However, there are many doubts about other causes that lead to this failure as w

... Show More
Crossref (3)
Clarivate Crossref
Publication Date
Tue Sep 01 2020
Journal Name
Baghdad Science Journal
Numerical Solution of Mixed Volterra – Fredholm Integral Equation Using the Collocation Method
...Show More Authors

Volterra Fredholm integral equations (VFIEs) have a massive interest from researchers recently. The current study suggests a collocation method for the mixed Volterra - Fredholm integral equations (MVFIEs)."A point interpolation collocation method is considered by combining the radial and polynomial basis functions using collocation points". The main purpose of the radial and polynomial basis functions is to overcome the singularity that could associate with the collocation methods. The obtained interpolation function passes through all Scattered Point in a domain and therefore, the Delta function property is the shape of the functions. The exact solution of selective solutions was compared with the results obtained

... Show More
View Publication Preview PDF
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sun Jul 04 2021
Journal Name
Journal Of Interdisciplinary Mathematics
Comparison the solutions for some kinds of differential equations using iterative methods
...Show More Authors

This manuscript presents several applications for solving special kinds of ordinary and partial differential equations using iteration methods such as Adomian decomposition method (ADM), Variation iterative method (VIM) and Taylor series method. These methods can be applied as well as to solve nonperturbed problems and 3rd order parabolic PDEs with variable coefficient. Moreover, we compare the results using ADM, VIM and Taylor series method. These methods are a commination of the two initial conditions.

Scopus (8)
Scopus