A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
disturbances in the test section. The design philosophy is discussed and methods for wind tunnel
calculation are outlined. Simulation of wind tunnel using ANSYS shows no separation of flow along
wind tunnel. Construction steps are also included in present work.
Objectives: To study the prevalence of rs1799964 (-1031 T/C) and rs361525 (- 238 G/A) SNPs and their effect on the disease activity, severity, and cytokines production in newly diagnosed Iraqi rheumatoid arthritis patients. Patients and Methods: sixty-three patients were diagnosed by a specialist physician while attending the rheumatology unit and twenty control participated. The inflammatory markers were measured and PCR amplification and sequencing were performed to demonstrate TNF-α SNPs. Results: Regarding (-1031 C/T) SNP, the TT genotype and allele C were significantly present in the controls, and the CT genotype was distributed significantly in the patients. The TT genotype was mostly distributed in the mild-moder
... Show MoreConstruction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on
... Show MoreThis research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects.
... Show MoreForm of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo
... Show MoreLiquid membrane electrodes for the determination iron(III) were constructed based on chloramphenicol sodium succinate and iron(III) CPSS-Fe(III) as ion pair complex, with four plasticizers Di-butyl phosphate (DBP); Di-butyl phthalate (DBPH); Di-octyl phthalate (DOP); Tri-butyl phosphate (TBP); in PVC matrix . These electrodes give Nernstian and sub-Nernstian slopes (19.79, 24.60, 16.01 and 13.82mV/decade) and linear ranges from (1x10-5-1x10-2 M, 1x10-5-1x10-2 M, 1x10-6-1x10-2 M and 1x10-5-1x10-2 M) respectively. The best electrode was based on DBP plasticizer which gave a slope 19.79 mV/decade, correlation coefficient 0.9999, detection limit of 9×10-6 M, lifetime 37 day displayed good stability and reproducibility and used to determine
... Show MoreShade in house gardens is one of the problems that hinder the growth of lawn and its distribution in the soil, where the types of lawns differ in their durability and adaptation to shade. The research aims to know the resistance of some species of lawn plants to shade and to know the appropriate fertilization procedures that can be followed to reduce the negative effects. The study was conducted in the Amiriya district of Baghdad in a house garden. Three varieties of lawn plants Bermuda, Gazon, and Trifoglio were planted. Five fertilization treatments (contained N and P elements) and the control were used. The sunlight density with the temperature of the study field locations were estimated using the AMT-300 and the vegetation coverage perc
... Show MoreThe research aims to learn spatial disparities tracts of agricultural crops in the
province of Maysan and their relationship (the salinity of the soil and the degree of chemical
interaction (PH)) The research is divided into an introduction and three Investigation eat first
section spatial disparities agricultural crops (cereals, vegetables, legumes and forage). The
comparison between the years of production in the province where the province has seen
varied spatial by hand and taking second section degrees of soil salinity and its impact on
agriculture, as well as the chemical reaction (PH) and its impact on agriculture The third
section has been used three technical techniques first linkage and the second simple an
In this paper, a microcontroller-based electronic circuit have been designed and implemented for dental curing system using 8-bit MCS-51 microcontroller. Also a new control card is designed while considering advantages of microcontroller systems the time of curing was controlled automatically by preset values which were input from a push-button switch. An ignition based on PWM technique was used to reduce the high starting current needed for the halogen lamp. This paper and through the test result will show a good performance of the proposed system.