The present work presents a new experimental study of the enhancement of turbulent
convection heat transfer inside tubes for combined thermal and hydrodynamic entry length of one
popular “turbulator” (twisted tape with width slightly less than internal tube diameter) inserted for
fire tube boilers. Cylindrical combustion chamber was used to burn (1.6 to 7kg/h) fuel oil #2 to
deliver hot gases with ranges of Reynolds number (10500 to 21700), and (11400 to 24150) for both
empty and inserted tube respectively.A uniform wall temperature technique was used by keeping
approximately constant water temperature difference (25ºC) between inlet and exit cooling water in
parallel flow shell and tube heat exchanger. The test tube consisted of smooth carbon steel tube of
(2400mm) long and (52mm) internal diameter. This test tube instrumented to derive local heat
transfer coefficient and local flue gasses static pressure.The experimental results show that for the
same fuel consumption, twisted tape insert with (H/D = 11.15) enhanced the mean Nusselt number
in (75.2%), (68.8%), (49.8%), (40.3%), and (16.7%) for fuel consumption (7kg/h), (6.16kg/h),
(4.5kg/h), (3.24kg/h), and (1.6kg/h) respectively.A set of empirical correlations that permit the
evaluation of the mean Nusselt number (for developing and fully developed region), and average
Nusselt number (for developed region) for empty and inserted tube are generated for engineering
applications.
Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
Exploring the B-Spline Transform for Estimating Lévy Process Parameters: Applications in Finance and Biomodeling Exploring the B-Spline Transform for Estimating Lévy Process Parameters: Applications in Finance and Biomodeling Letters in Biomathematics · Jul 7, 2025Letters in Biomathematics · Jul 7, 2025 Show publication This paper, presents the application of the B-spline transform as an effective and precise technique for estimating key parameters i.e., drift, volatility, and jump intensity for Lévy processes. Lévy processes are powerful tools for representing phenomena with continuous trends with abrupt changes. The proposed approach is validated through a simulated biological case study on animal migration in which movements are mo
... Show MoreIn this paper, we will study non parametric model when the response variable have missing data (non response) in observations it under missing mechanisms MCAR, then we suggest Kernel-Based Non-Parametric Single-Imputation instead of missing value and compare it with Nearest Neighbor Imputation by using the simulation about some difference models and with difference cases as the sample size, variance and rate of missing data.
Abstract
This study highlights the importance of Iraq in the analysis of foreign trade and economic growth for the period (1980 - 2013) is an attempt to determine the equilibrium relationship long term and short term between these two variables were used ARDL model to explain the economic relationship between the two variables.
To achieve the objectives of the research has been the standard model estimate after testing the stability of exports X data series, and imports M, and GDP current prices, and exchange rate EXR, and verify the existence of a joint integration relationship between these variables.
In order to achieve the objectives of the research it
... Show MoreIt is very well known in the planning publications that when creating spacing development to a region or sub-region, it can be able to make more than an alternative consisting with the strategic directions overtaken from the actual development of region and the situational and developmental objectives needed. However, the difficulty facing the situational planning is in selecting one of these alternatives to be the best in order to make a balanced situational re-structure, and achieving the economic, social and civil objectives. The developmental situation elements in the regions and governorates, including (Karbala) impose themselves as situational power which implies the process of re-structural arrangement where the situational develo
... Show MoreIn Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show MoreThis paper studies the combination fluid viscous dampers in the outrigger system to add supplementary damping into the structure, which purpose to remove the dependability of the structure to lower variable intrinsic damping. It works by connecting the central core, comprising either shear walls or braced frames, to the outer perimeter columns.
The modal considered is a 36 storey square high rise reinforced concrete building. By constructing a discrete lumped mass model, and using frequency-based response function, two systems of dampers, parallel and series systems are studied. The maximum lateral load at the top of the building is calculated, and this load w
... Show MoreAsmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement insi
... Show More