The long-term monitoring of land movements represents the most successful application of the Global Navigation Satellite System (GNSS), particularly the Global Positioning System. However, the application of long term monitoring of land movements depends on the availability of homogenous and consistent daily position time series of stations over a period of time. Such time series can be produced very efficiently by using Precise Point Positioning and Double Difference techniques based on particular sophisticated GNSS processing softwares. Nonetheless, these rely on the availability of GNSS products which are precise satellite orbit and clock, and Earth orientation parameters. Unfortunately, several changes and modifications have been made periodically on the policy of producing these products which led to degradation in the consistency of these products over time. For the long term monitoring of land movements, it is essential that any such developments and changes can also be used to produce improved products that go back in time, to enable the homogeneous reprocessing of archived observation data. This paper deals with two main themes. Firstly, it demonstrates the significant and imperative role of the GNSS in geological applications by addressing major global and regional studies of the Earth’s deformation which represent one of the main and essential applications in satellite geodesy. The role of the continues GPS measurements in this application is highlighted and discussed for modeling global and regional plate motions and modeling Glacial Isostatic Adjustment. Secondly, this paper locates the most important obstacles which stand behind the inability to use the GNSS in applications of long-term monitoring of land movements.
Background: Bone healing of fractures is still an open field for research due to its biological complexity. Adequately adapted experimental model is essential for understanding the factors
influencing the biological process of bone healing. Rabbits provide a good animal model for bone healing studies; its bone had Haversian system similar to human.
Material and Methods: Six young locally breaded New Zeeland male rabbits were used in this study, the study conducted in animal house in college of medicine at November and December 2009. Surgical fracture (osteotomy) induced operatively in right ulna under general anesthesia by a hand saw. At the end of fifth weeks, the animals' scarified and the specimens taken
The real and imaginary part of complex dielectric constant for InAs(001) by adsorption of oxsagen atoms has been calculated, using numerical analysis method (non-linear least square fitting). As a result a mathematical model built-up and the final result show a fairly good agreement with other genuine published works.
This paper deals with the problem of the mechanics of the operation of cinematography in the development of museum exhibition halls. In the first chapter, the researcher dealt with the problem and presented it to reach the goals and purpose of the research, which was represented in using and developing the methods and mechanisms of the presentation to keep pace with what is happening in the world of technology and access to the presented model to new formula and vision declares aesthetical and cognitive measure, thus the search constitutes an importance in absorbing Scenography dimensions in the theater and moved to the idea of the museum and the development of the display models and using them in drawing and representation of perception
... Show MoreIn this paper, Bayes estimators for the shape and scale parameters of Weibull distribution have been obtained using the generalized weighted loss function, based on Exponential priors. Lindley’s approximation has been used effectively in Bayesian estimation. Based on theMonte Carlo simulation method, those estimators are compared depending on the mean squared errors (MSE’s).
To ascertain the stability or instability of time series, three versions of the model proposed by Dickie-Voller were used in this paper. The aim of this study is to explain the extent of the impact of some economic variables such as the supply of money, gross domestic product, national income, after reaching the stability of these variables. The results show that the variable money supply, the GDP variable, and the exchange rate variable were all stable at the level of the first difference in the time series. This means that the series is an integrated first-class series. Hence, the gross fixed capital formation variable, the variable national income, and the variable interest rate
... Show MoreCurrent study was carried out to determine the adsorption ability of the Multiwall carbon nanotubes (MWCNTs) by adsorption Malachite Green dye from an aqueous solution. Crystal structure of the materials was measured using powder X-rays diffraction (PXRD), UV–Vis diffuse reflectance and specific surface area (BET). Many parameters that affecting the adsorption process such as contact time, pH, adsorbent dosage, initial dye concentration and temperature were studied. The outcome showed that an increasing occurred in the adsorbent dosage and the rate of dye removal, and the best efficiency for Malachite Green dye removal was amounted 99. 11 %. The results were obtained at optimal reaction conditions were pH = 5.5, cata
... Show MoreIn general, path-planning problem is one of most important task in the field of robotics. This paper describes the path-planning problem of mobile robot based on various metaheuristic algorithms. The suitable collision free path of a robot must satisfies certain optimization criteria such as feasibility, minimum path length, safety and smoothness and so on. In this research, various three approaches namely, PSO, Firefly and proposed hybrid FFCPSO are applied in static, known environment to solve the global path-planning problem in three cases. The first case used single mobile robot, the second case used three independent mobile robots and the third case applied three follow up mobile robot. Simulation results, whi
... Show MoreA novel demountable shear connector is proposed to link a concrete slab to steel sections in a way that resulting steel-concrete composite floor is demountable, i.e. it can be easily dismantled at the end of its service life. The proposed connectors consist of two parts: the first part is a hollow steel tube with internal threads at its lower end. The second part is a compatible partially threaded bolted stud. After linking the stud to the steel section, the hollow steel tube can be fastened over the threaded stud, which create a complete demountable shear connector. The connector is suitable for use in both composite bridges and buildings, and using cast in-situ slabs, precast solid slabs, or hollow-core precast slabs. A series of push-off
... Show MoreIn this paper, we propose a new and efficient ferroelectric nanostructure metal oxide lithium niobate [(Li1.075Nb0.625Ti0.45O3), (LNTO)] solid film as a saturable absorber (SA) for modulating passive Q-switched erbium-doped fiber laser (EDFL). The SA is fabricated as a nanocomposite solid film by the drop-casting process in which the LNTO is planted within polyvinylidene fluoride-trifluoroethylene [P(VDF-TrFE)] as host copolymer. The optical and physical characteristics of the solid film are experimentally established. The SA is incorporated within the cavity of EDFL to examine its capability for producing multi-wavelength laser. The experimental results proved that a multi-wavelength laser is produced, where stable four lines with central
... Show MoreEmergency vehicle (EV) services save lives around the world. The necessary fast response of EVs requires minimising travel time. Preempting traffic signals can enable EVs to reach the desired location quickly. Most of the current research tries to decrease EV delays but neglects the resulting negative impacts of the preemption on other vehicles in the side roads. This paper proposes a dynamic preemption algorithm to control the traffic signal by adjusting some cycles to balance between the two critical goals: minimal delay for EVs with no stop, and a small additional delay to the vehicles on the side roads. This method is applicable to preempt traffic lights for EVs through an Intelli