Study on Safety Construction Management Plan
...Show More Authors

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were rated the severity of each phase of the work, an idea was builtabout the most dangerous situations in projects with multiple floorsbuildings. To find multiple solutions to the risk, researchers identified 46 cases with their ratings, type of perceived risk in each case, and displayed a format survey to the most important specialized institutions and companies operating in Iraq and the United Arab Emirates. Finally theresearcher takes the results,and format a software that any user can use in his personal computer to studythe expected risk,how to avoid it and how to deal with it if it happens.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Sep 08 2015
Journal Name
Journal Of The Faculty Of Medicine
Sciatic nerve injection injury in children: Management and outcome
...Show More Authors

W Tarik A, AW Ali T, Journal of the Faculty of Medicine, 2015 - Cited by 2

View Publication
Publication Date
Mon Apr 08 2019
Journal Name
International Journal Of Building Pathology And Adaptation
A scientometric analysis of BIM studies in facilities management
...Show More Authors
Purpose

The purpose of this paper is to statistically classify and categorize Building Information Modelling (BIM)-Facility Management (FM) publications in order to extract useful information related to the adoption and use of BIM in FM.

Design/methodology/approach

This study employs a quantitative approach using science mapping techniques to examine BIM-FM publications using Web of Science (WOS) database for the period between 2000 and April 2018.

Findings

The findi

... Show More
View Publication
Scopus (37)
Crossref (34)
Scopus Clarivate Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
The role of performance management in Achieving Organizational success
...Show More Authors

 

The idea of this research is the basis of the role exercised by the dimensions of performance management (Performance Planning- performance evaluation- improve the performance and development- feedback - Review and Performance Monitor) In order to achieve the success Organizational Is through the (strategic vision- the operational activity- development of the company- selection of personnel- the company's culture- Leadership and Management- Personal Development - Assessment and Review).And The research aims to identify the extent of the responsibility of performance management in achieving success  Organizational through main hypotheses branched out by the sub-hypotheses to knowing out the&nbs

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Jun 30 2014
Journal Name
Al-kindy College Medical Journal
Extra-Anatomic prosthetic bypass grafts in management of Sub-inguinal vascular infections
...Show More Authors

Infection at the site of vascular anastomosis is a serious complication of vascular surgery and is associated with a high limb loss and mortality rate. The classical method of management is ligation of the injured artery, adequate wound debridement and restoration of circulation. The latter is achieved by either in situ or extra-anatomic bypass. If the distal circulation is not maintained, subsequent amputation is most likely.
Objectives: In this study we tried to assess the efficacy of extra-anatomic synthetic bypass grafts in the treatment of vascular infection in the groin to save the limb and avoid the inevitable amputation.
Methods: Between January 2006 and December 2007, ten male patients aged twenty to thirty five years (mea

... Show More
View Publication Preview PDF
Publication Date
Thu Nov 08 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Determination of Diabetes type 2 Clients’ Self-Management Skills toward Dietary Pattern
...Show More Authors

Objective: study aims to identify the diabetes type2 clients self management skills toward dietary pattern
, and find out the relationship between variables which are (Age, gender, educational level, duration of DM
diagnosis, and monthly income) with diabetes type 2 clients self management skills toward dietary pattern
Methodology: descriptive study was carried out through the present investigation from January 2nd
2011to September 2nd 2011 in order to achieve the objectives of the present study. A non probability
(purposive) sample, (200) cases which consists of clients who were attending Al-Nasiriyha diabetic center.
Including (118) males and (82) females. The data were collected by utilization of the study instrument

... Show More
View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
E3s Web Of Conferences
Comparing the Design Alternatives Using Building Information Model (BIM) and Constructability in Iraqi Construction Projects
...Show More Authors

The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha

... Show More
View Publication
Scopus Crossref
Publication Date
Sat Jun 27 2020
Journal Name
Asian Journal Of Civil Engineering
Using measured mile method to quantify the loss of labor productivity in Iraqi construction site
...Show More Authors

View Publication
Scopus (5)
Crossref (5)
Scopus Crossref
Publication Date
Sat Nov 03 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Construction of an Initial Assessment Documentation Tool for Nursing Recording System in Coronary Care Units
...Show More Authors

Objective : The study was carried out to construct an initial assessment documentation tool for nursing
recording system in Coronary Care Unit.
Methodology : A descriptive, purposive sample of (65) nurses was selected from CCU of main
teaching hospitals (Al Karama, Al Kindy, Al Kadimia, Al Yarmmok, Baghdad teaching hospital, Ibn
Al Naffis hospital) and Ibn-Al betar hospital in Baghdad city from the 15th of April 2004 to the 15th of
April 2006.
The instrument was constructed and comprised of two sections: section one included the
nurses' demographic characteristic; section two was the initial assessment documentation tool that
contained (2) parts including: General information form and the initial assessment form.

... Show More
View Publication Preview PDF
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (7)
Clarivate Crossref
Publication Date
Thu Feb 12 2026
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.