Preferred Language
Articles
/
joe-2577
Study on Safety Construction Management Plan
...Show More Authors

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were rated the severity of each phase of the work, an idea was builtabout the most dangerous situations in projects with multiple floorsbuildings. To find multiple solutions to the risk, researchers identified 46 cases with their ratings, type of perceived risk in each case, and displayed a format survey to the most important specialized institutions and companies operating in Iraq and the United Arab Emirates. Finally theresearcher takes the results,and format a software that any user can use in his personal computer to studythe expected risk,how to avoid it and how to deal with it if it happens.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Aug 01 2021
Journal Name
Journal Of Engineering
Flood Management of Diyala River
...Show More Authors

Diyala Governorate was recently exposed to high flood waves discharged from Hemrin Dam. Since the dam was at its full capacity during the flood period, these waves were discharged to the Diyala River. Because of the reduction in Diyala River capacity to 750m3/s, the cities and villages on both sides of the river banks were inundated. Thus, the study's objective is to design a flood escape out of the Diyala River, to discharge the flood wave through it. The flood escape simulation was done by using HEC- RAS software. Two hundred twenty-three cross sections for the escape and 30 cross-sections of the Diyala River were used as geometric data. Depending on the geological formation that the escape passed t

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Journal Of The College Of Education For Women
Knowledge Management at Kindergartens Managers
...Show More Authors

The task of an educational institution such as kindergartens need to run by managers possess the knowledge to manage the administration of the importance in the development of kindergarten has been the goal of research to identify knowledge management at Riyadh managers, and achieve the objectives of Search selected sample of directors of kindergartens in the city of Baghdad was (160) director was Akhtarhn simple random way, been building measure for knowledge management and presented to the group of experts and extracted stability in a way re-testing and Alvakronbach and reach search to a discrepancy between managers Riyadh in knowledge management and put the researcher set of recommendations including the establishment of seminars and

... Show More
View Publication Preview PDF
Publication Date
Thu Mar 29 2018
Journal Name
Construction Research Congress 2018
Consideration of Worker Safety in the Design Process: A Statistical-Based Approach Using Analysis of Variance (ANOVA)
...Show More Authors

View Publication
Scopus (1)
Crossref (2)
Scopus Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Evaluation of the Current Status of the Cost Control Processes in Iraqi Construction Projects
...Show More Authors

One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Sep 01 2016
Journal Name
Journal Of Engineering
Evaluation of Maintenance Management in Iraqi Governmental Buildings
...Show More Authors

Impact of buildings in Iraq and other countries on the environment is obvious; this problem began to take scientific and humanitarian dimensions in order to reduce and eliminate this problem. This impact can be seen through the energy, water and raw materials consumed for the establishment, operation and maintenance of these buildings, as well as the emissions of hazardous gases and generations of solid wastes.

This work was conducted to assess the current maintenance managerial practice for the governmental buildings to stand on the main obstacle and extrapolation of measures by means of interviews with experts to determine the effective factors and closed questionnaire to state the features and the need for new

... Show More
View Publication Preview PDF
Publication Date
Tue Dec 15 2020
Journal Name
Al-academy
Aesthetic and Functional Dimensions of the Industrial Product and their Influence on Construction of Consumer's Visual Impression: جاسم احمد زيدان
...Show More Authors

  The visual impression represents a compound process of a group of concepts that might be secondary and interrelated to constitute, in reality, a cognitive image stored in the memory that can be retrieved according the implications of the situation in which the individual lives in his environment, as it awakens in him an image from the sub consciousness, thus it gets stimulated, and it is among the tangible things.
Since we live in our contemporary world under the development of knowledge, micro and wide technology of the devices, tools, materials, mechanisms, current developments and openness… etc. this transformation created visual impressions that the individual in general and the consumer in specific enjoys concerning his

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Apr 01 2015
Journal Name
Journal Of Economics And Administrative Sciences
A specimen of the internal control system on the stock in light of the application JIT system In construction companies
...Show More Authors

Suffer most of the facilities of the high cost of inventory , which affects the high cost of the product and thus affects many administrative decisions , as well as suffer the facilities of the systems developed by the provisions of inventory control , and this problem is exacerbated in the construction sector where the inventory in the form of Construction spin of the Year for another it becomes difficult to control the cost effectively , and is the research problem in question follows: What are the implications of the use of the system in time inventory accounting system for the contracting company does kills Alrkaah to the provisions of the cost of inventory and what is the optimal approach to inventory control ? Find assumed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jun 20 2021
Journal Name
Baghdad Science Journal
Noor's Curve, a New Geometric Form of Agnesi Witch, a Construction Method is Produced
...Show More Authors

In this paper, a new form of 2D-plane curves is produced and graphically studied. The name of my daughter "Noor" has been given to this curve; therefore, Noor term describes this curve whenever it is used in this paper. This curve is a form of these opened curves as it extends in the infinity along both sides from the origin point. The curve is designed by a circle/ ellipse which are drawing curvatures that tangent at the origin point, where its circumference is passed through the (0,2a). By sharing two vertical lined points of both the circle diameter and the major axis of the ellipse, the parametric equation is derived. In this paper, a set of various cases of Noor curve are graphically studied by two curvature cases;

... Show More
View Publication Preview PDF
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sun Dec 22 2024
Journal Name
Journal Of Engineering
Construction of a General-Purpose Infrastructure for Rfid – Based Applications
...Show More Authors

View Publication
Publication Date
Mon Feb 07 2022
Journal Name
Innovative Infrastructure Solutions
Evaluation of construction and demolition waste recycling sites within Iraq
...Show More Authors

View Publication
Crossref (2)
Clarivate Crossref