After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were rated the severity of each phase of the work, an idea was builtabout the most dangerous situations in projects with multiple floorsbuildings. To find multiple solutions to the risk, researchers identified 46 cases with their ratings, type of perceived risk in each case, and displayed a format survey to the most important specialized institutions and companies operating in Iraq and the United Arab Emirates. Finally theresearcher takes the results,and format a software that any user can use in his personal computer to studythe expected risk,how to avoid it and how to deal with it if it happens.
Construction is a hazardous industry with a high number of injuries. Prior research found that many industry injuries can be prevented by implementing an effective safety plan if prepared and maintained by qualified safety personnel. However, there are no specific guidelines on how to select qualified construction safety personnel and what criteria should be used to select an individual for a safety position in the United States (US) construction industry. To fill this gap in knowledge, the study goal was to identify the desired qualifications of safety personnel in the US construction industry. To achieve the study goal, the Delphi technique was used as the main methodology for determining the desired qualifications for constructio
... Show MoreThe avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identi
... Show MoreThe main problem of this research is the delay of implementation of the investment plan projects for the period (2013-2016) and the weakness of the staff ability in the ministries and they don’t have the sufficient experience to carry out the implementation process.
Therefore, the research aims to evaluate the implementation of programs and projects of the investment plan in a manner consistent with the objectives set for them without any wasteful of efforts, time and money. And then identify the problems and obstacles to determine the deviations of the implementation of the specific for each sector according to the criteria of evaluation and the form of cost, quality, time and implementation.<
... Show MoreConstruction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies l
... Show MoreProject management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and
... Show MoreUniversity Campuses, as any lively physical entity, is subject to continuous variation due to . growth, development and change. This reality covers the existing or futuristic additives or additions, consecutively these changes may have a strong sensation of disorientation as a result of formatic changes in buildings, or in movement paths. And it epitomized the research problem to "the need for knowledge to clarify the impact of intellectual and executive policy in achieving coherence, functional and space organization of the elements of the university urban environment and in the stages of future growth and change," the search targeted "to highlight the study of constraction politics on campus Bmqomad