Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy theory combining CPM computations, time-cost trade off analysis and resource constraint. MATLAB software has been adopted to perform ranking process, for each case, that
facilitates obtaining the optimum solution. This research infers that it is possible to perform time-cost trade off analysis with resource restriction simultaneously, which ensures achieving scheduling optimum solution reducing the effort and the time when performing these techniques in succession using traditional methods.
Reducing costs and protecting the environment surrounding economic unity has become the concern of many economic units and shifting their ideas towards preserving resources and protecting the environment by adopting strategies and techniques that take into account when applied reducing production costs and protecting the environment, including these strategies and techniques, the technical costs of the product life cycle and the strategy of cleaner production, as the application of the two concepts in local economic units helps to try to keep up with the countries that work to keep up with the success of their economic units by following the concepts that have been successful in Developed countries by maintaining the sustainabilit
... Show MoreHighway embankments stability during its service period represents an important factor for the safety of highway users and vehicles. Consequently, the cost of construction of these embankments should be adequate to maintain the safety and durability during this period through proper estimation of the loading on asphalt pavement, slope stability, horizontal and vertical deformation, etc. Slope stability of the embankment mainly depends on the shear strength of the soil layers materials; this shear strength is affected by the water table level through the contribution of the capillary water. Negative pore water pressure above the water table level evolves matric suction in the unsaturated zone above water table; this matric suction increases
... Show MoreOne of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc
... Show MoreStrategic Cost Management Tools Under Technological Development and Change in Customer Tastes Critical Studies
The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha