Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy theory combining CPM computations, time-cost trade off analysis and resource constraint. MATLAB software has been adopted to perform ranking process, for each case, that
facilitates obtaining the optimum solution. This research infers that it is possible to perform time-cost trade off analysis with resource restriction simultaneously, which ensures achieving scheduling optimum solution reducing the effort and the time when performing these techniques in succession using traditional methods.
Resource estimation is an essential part of reservoir evaluation and development planning which highly affects the decision-making process. The available conventional logs for 30 wells in Nasiriyah oilfield were used in this study to model the petrophysical properties of the reservoir and produce a 3D static geological reservoir model that mimics petrophysical properties distribution to estimate the stock tank oil originally in place (STOOIP) for Mishrif reservoir by volumetric method. Computer processed porosity and water saturation and a structural 2D map were utilized to construct the model which was discretized by 537840 grid blocks. These properties were distributed in 3D Space using sequential Gaussian simulation and the variation in
... Show MoreIn this paper, a procedure to establish the different performance measures in terms of crisp value is proposed for two classes of arrivals and multiple channel queueing models, where both arrival and service rate are fuzzy numbers. The main idea is to convert the arrival rates and service rates under fuzzy queues into crisp queues by using graded mean integration approach, which can be represented as median rule number. Hence, we apply the crisp values obtained to establish the performance measure of conventional multiple queueing models. This procedure has shown its effectiveness when incorporated with many types of membership functions in solving queuing problems. Two numerical illustrations are presented to determine the validity of the
... Show MoreThe current research aims to identify: 1. The level of mathematical construct among the Department of Mathematics students in the colleges of education and basic education. 2. The level of effective mathematical operations in both sides of the brain at the Department of Mathematics students in the colleges of education and basic education. 3. The strength and direction of the correlation between the mathematical construct and effective mathematical operations on both sides of the brain at the Department of Mathematics students in the colleges of Education and Basic Education. To investigate the research objectives, the researcher formulated zero-main hypothesis for each aim and from the same hypothesis, three sub-zero hypotheses are deri
... Show MoreAbstract
Public debt has posed a major challenge to both developing and developed countries, which has focused attention on the optimal limits (threshold of debt) and its determinants.
The study examines the effect of the Public bank debt on the foreign reserves and the work of the foreign reserve as a limitation on the process of bank debt (part of the internal debt) for the period (2017-2004), in addition to finding the type and nature of the relationship between them according to the hypotheses of the study, Public bank debt and foreign reserves.
The study was based on data from the Iraqi banking sector, which showed that Iraq has a foreign reserve in line with internat
... Show MoreKing Ghazi (1933-1939) was of the Arabic characters that characterized national and
patriotic spirit and that faced the British policy in all its aspects.
King Ghazi distinguished as of Arab nationalist tendencies and called for the
liberalization of Arab lands which were under the rule of the Ottoman Empire. He called for
reunification under the one Arab country, Hence came the King invitations to liberate Kuwait
from the British protectorate and consolidated with Iraq.
King Ghazi established a private radio station in the royal palace (AL zzaahoor) palace
and provided special programs to return of Kuwait to Iraq, this radio station was The
prominent role in the revitalization of the Kuwaiti National Movement, an
This research aims to identify the productive relationship nature among the elements used in the agricultural companies by estimating the translog cost function. It also aims to recognize the possibility of substituting these elements with each other, to identify the nature of revenues, and economies scale through elasticity of other cost. This research goes further to define the typical use of resources, identify the performance of the companies and their contribution in controlling their cost, and estimating elasticity of substitution (Allen-Uzawa), (Morishima). The translog cost function was estimated so as the total cost of the agricultural companies is a function of the prices of production and production quantity output el
... Show MoreThis research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the re
... Show MoreThis paper presents a fuzzy logic controller for a two-tank level control system, which is a process with a dead time. The fuzzy controller is a proportional-integral (PI-like) fuzzy controller which is suitable for steady state behavior of the system. Transient behavior of the system was improved without the need for a derivative action by suitable change in the rule base of the controller. Simulation results showed the step response of the two-tank level control system when this controller was used to control this plant and the effect of the dead time on the response of the system.