Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy theory combining CPM computations, time-cost trade off analysis and resource constraint. MATLAB software has been adopted to perform ranking process, for each case, that
facilitates obtaining the optimum solution. This research infers that it is possible to perform time-cost trade off analysis with resource restriction simultaneously, which ensures achieving scheduling optimum solution reducing the effort and the time when performing these techniques in succession using traditional methods.
This research aims to analyze the effect between letter of credit opening and implementation procedures which considered one of the most important Foreign services submitted by bank institutions to their customers on Time contracted time limit commitment contract by some Iraqi commercial banks, descriptive analytical method used in This research The questionnaires designed a tool main research to gather information to get to know the effect , Seventy questionnaire forms were distributed, sixty seven forms were analyzable , The answers were analyzed by the arithmetic mean and standard deviation and test the level of influence between variables simple linear regression. The result showe
... Show MoreExperiment was conducted in Baghdad, three factor were used in this research included Two types of Plows included moldboard and disk plows which represented the main plot, Three forward speeds of the tillage was the second factor included 1.85, 3.75 and 5.62 km / h which represented sup plot , and Three levels of Soil Moisture was third factor included 21, 18 and 14 % in all of Vertical and Lateral Plowing Deviation, Practical and specific productivity, actual time for plowing one donam and appearance (goodness) of Tillage represented by the number of clods > 10 cm in silt clay loam soil with depth 22 cm were studied. the experiment was used Split – split plot design under randomized complete block design with three replications and Le
... Show MoreThe study aimed to reveal the possibility of predicting academic procrastination through both Cognitive distortions and time management among students of Al-Aqsa Community College, as well as to reveal the level of both cognitive distortions, time management, and academic procrastination. Additionally, it aimed to identify the size of the correlation between cognitive distortions, time management, and academic procrastination. The study sample consisted of (250) students from Al-Aqsa community college students. The results of the study concluded that the mean for each level of cognitive distortions and academic procrastination is average. The mean level of time management is high. There is a statistically significant positive relationshi
... Show MoreAbstract The success of the system of government in any country needs to have a handle on the amount of power efficiency , capacity , capability and wisdom, Iraq has gone through since its inception through several stages of time, namely: The first stage: which ran from August 23, 1921 until July 14, 1958 and was ruling monarchy (rule of the royal family) and punishing power of political elites both of them and works access to power without taking into consideration the laws and principles of the Constitution, and as a result of the inability of civilian powers and political parties access to power to grant that army officers regulatory and disciplinary specifications as well as possessing arms and overthrow the rule of the minority coup
... Show MoreIn order to understand the effect of the number of piles (N), the history response of dynamic pile load in piled raft system and deflection time history of piled raft under repeated impact load applied on the center of piled raft resting on loose sand, laboratory model tests were conducted on small-scale models. The results of experimental work are found to be dynamic load increase with increase height of drop, the measured repeated dynamic load time history on the center of piled raft was close approximately to three a half sine wave shape with small duration in about (0.015 Sec). The maximum peak of impact loads occurs in pile and deflection time history occur after at the time of the peak repeated impact loads, dynamic pile load
... Show MoreIn this work, the performance of the receiver in a quantum cryptography system based on BB84 protocol is scaled by calculating the Quantum Bit Error Rate (QBER) of the receiver. To apply this performance test, an optical setup was arranged and a circuit was designed and implemented to calculate the QBER. This electronic circuit is used to calculate the number of counts per second generated by the avalanche photodiodes set in the receiver. The calculated counts per second are used to calculate the QBER for the receiver that gives an indication for the performance of the receiver. Minimum QBER, 6%, was obtained with avalanche photodiode excess voltage equals to 2V and laser diode power of 3.16 nW at avalanche photodiode temperature of -10
... Show MoreAbstract
The grey system model GM(1,1) is the model of the prediction of the time series and the basis of the grey theory. This research presents the methods for estimating parameters of the grey model GM(1,1) is the accumulative method (ACC), the exponential method (EXP), modified exponential method (Mod EXP) and the Particle Swarm Optimization method (PSO). These methods were compared based on the Mean square error (MSE) and the Mean Absolute percentage error (MAPE) as a basis comparator and the simulation method was adopted for the best of the four methods, The best method was obtained and then applied to real data. This data represents the consumption rate of two types of oils a he
... Show More