Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy theory combining CPM computations, time-cost trade off analysis and resource constraint. MATLAB software has been adopted to perform ranking process, for each case, that
facilitates obtaining the optimum solution. This research infers that it is possible to perform time-cost trade off analysis with resource restriction simultaneously, which ensures achieving scheduling optimum solution reducing the effort and the time when performing these techniques in succession using traditional methods.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jan 27 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Waste as a resource of economic resources: A case study using environmentalthe index MIP
...Show More Authors

Due to increased consumption of resources, especially energy it was necessary to find alternatives characterized by the same quality as well as being of less expensive, and most important of these alternatives are characterized by waste and the fact that humancannot stop consumption. So we  have consideredwaste as an  alternative and cheap economic resources and by using environmental index the MIP (input materials per unit ,unit / service) is based on the grounds that the product is not the end of itselfit is a product to meet the need  of a product or service, awarded a resource input and output within the five basic elements are the raw materials is ecological, Raw materials ecological, water, air and soil erosion for a

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Feb 01 2021
Journal Name
Journal Of Engineering
Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate
...Show More Authors

Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w

... Show More
View Publication Preview PDF
Crossref (8)
Crossref
Publication Date
Fri Feb 28 2025
Journal Name
Journal Européen Des Systèmes Automatisés
Decision-Making Model for Aircraft Landing Based on Fuzzy Logic Approach
...Show More Authors

An aircraft's landing stage involves inherent hazards and problems associated with many factors, such as weather, runway conditions, pilot experiences, etc. The pilot is responsible for selecting the proper landing procedure based on information provided by the landing console operator (LCO). Given the likelihood of human decisions due to errors and biases, creating an intelligent system becomes important to predict accurate decisions. This paper proposes the fuzzy logic method, which intends to handle the uncertainty and ambiguity inherent in the landing phase, providing intelligent decision support to the pilot while reducing the workload of the LCO. The fuzzy system, built using the Mamdani approach in MATLAB software, considers critical

... Show More
View Publication
Scopus Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Fusion: Practice And Applications
Optimizing Task Scheduling and Resource Allocation in Computing Environments using Metaheuristic Methods
...Show More Authors

Optimizing system performance in dynamic and heterogeneous environments and the efficient management of computational tasks are crucial. This paper therefore looks at task scheduling and resource allocation algorithms in some depth. The work evaluates five algorithms: Genetic Algorithms (GA), Particle Swarm Optimization (PSO), Ant Colony Optimization (ACO), Firefly Algorithm (FA) and Simulated Annealing (SA) across various workloads achieved by varying the task-to-node ratio. The paper identifies Finish Time and Deadline as two key performance metrics for gauging the efficacy of an algorithm, and a comprehensive investigation of the behaviors of these algorithms across different workloads was carried out. Results from the experiment

... Show More
View Publication
Crossref (1)
Scopus Crossref
Publication Date
Wed Oct 17 2018
Journal Name
Journal Of Economics And Administrative Sciences
comparison between the methods estimate nonparametric and semiparametric transfer function model in time series the Using simulation
...Show More Authors

 The transfer function model the basic concepts in the time series. This model is used in the case of multivariate time series. As for the design of this model, it depends on the available data in the time series and other information in the series so when the representation of the transfer function model depends on the representation of the data In this research, the transfer function has been estimated using the style nonparametric represented in two method  local linear regression and cubic smoothing spline method The method of semi-parametric represented use semiparametric single index model, With four proposals, , That the goal of this research is comparing the capabilities of the above mentioned m

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jan 01 2015
Journal Name
Aip Conference Proceedings
Performance measurements of single server fuzzy queues with unreliable server using left and right method
...Show More Authors

The fuzzy assignment models (FAMs) have been explored by various literature to access classical values, which are more precise in our real-life accomplishment. The novelty of this paper contributed positively to a unique application of pentagonal fuzzy numbers for the evaluation of FAMs. The new method namely Pascal's triangle graded mean (PT-GM) has presented a new algorithm in accessing the critical path to solve the assignment problems (AP) based on the fuzzy objective function of minimising total cost. The results obtained have been compared to the existing methods such as, the centroid formula (CF) and centroid formula integration (CFI). It has been demonstrated that operational efficiency of this conducted method is exquisitely develo

... Show More
View Publication
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Mon Apr 19 2021
Journal Name
Turkish Journal Of Computer And Mathematics Education (turcomat)
The Impact Of Innovative Matrix Strategy And The Problem Tree Strategy On The Mathematical Proficiency Of Intermediate Grade Female Students
...Show More Authors

The research aims to know the impact of the innovative matrix strategy and the problem tree strategy in teaching mathematics to intermediate grade female students on mathematical proficiency. To achieve the research objectives, an experimental approach and a quasi-experimental design were used for two equivalent experimental groups. The first is studied according to the innovative matrix strategy, the second group is studied according to the problem tree strategy. The research sample consisted of (32) female students of the first intermediate grade, who were intentionally chosen after ensuring their equivalence, taking into several factors, most notably (chronological age, previous achievement, and intelligence test). The research tools con

... Show More
View Publication Preview PDF
Publication Date
Tue Oct 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Comparison Robust M Estimate With Cubic Smoothing Splines For Time-Varying Coefficient Model For Balance Longitudinal Data
...Show More Authors

In this research، a comparison has been made between the robust estimators of (M) for the Cubic Smoothing Splines technique، to avoid the problem of abnormality in data or contamination of error، and the traditional estimation method of Cubic Smoothing Splines technique by using two criteria of differentiation which are (MADE، WASE) for different sample sizes and disparity levels to estimate the chronologically different coefficients functions for the balanced longitudinal data which are characterized by observations obtained through (n) from the independent subjects، each one of them is measured repeatedly by group of  specific time points (m)،since the frequent measurements within the subjects are almost connected an

... Show More
View Publication Preview PDF
Crossref
Publication Date
Fri Aug 30 2024
Journal Name
Iraqi Journal Of Science
A fourth Order Pseudoparabolic Inverse Problem to Identify the Time Dependent Potential Term from Extra Condition
...Show More Authors

     In this work, the pseudoparabolic problem of the fourth order is investigated to identify the time -dependent potential term under periodic conditions, namely, the integral condition and overdetermination condition. The existence and uniqueness of the solution to the inverse problem are provided. The proposed method involves discretizing the pseudoparabolic equation by using a finite difference scheme, and an iterative optimization algorithm to resolve the inverse problem which views as a nonlinear least-square minimization. The optimization algorithm aims to minimize the difference between the numerical computing solution and the measured data. Tikhonov’s regularization method is also applied to gain stable results. Two

... Show More
View Publication
Scopus Crossref
Publication Date
Thu Feb 01 2018
Journal Name
Journal Of Engineering
Mathematical Modeling of Compaction Curve Using Normal Distribution Functions
...Show More Authors

Compaction curves are widely used in civil engineering especially for road constructions, embankments, etc. Obtaining the precise amount of Optimum Moisture Content (OMC) that gives the Maximum Dry Unit weight gdmax. is very important, where the desired soil strength can be achieved in addition to economic aspects.

In this paper, three peak functions were used to obtain the OMC and gdmax. through curve fitting for the values obtained from Standard Proctor Test. Another surface fitting was also used to model the Ohio’s compaction curves that represent the very large variation of compacted soil types.

The results showed very good correlation between the values obtained from some publ

... Show More
View Publication Preview PDF