Preferred Language
Articles
/
joe-2402
Quality-Cost Analysis of Gasoline Production Process
...Show More Authors

Process capability provides a quantitative measure for gasoline production conformance to specifications.It was measured throughout four consecutive months of the last quarter of 2011. Results revealed high percentages (up to 44%) of non conforming gasoline blends to Iraqi marketing specifications for petroleum products (2000) by inspecting 122 different samples of Iraqi regular gasoline (RON 85).
Quality cost analysis as an important financial control tool was carried out to evaluate Cost of Quality (COQ) which was large due to non conforming gasoline reached up to (722.8 M.ID) in October. In this research COQ was investigated in order to identify the opportunities of gasoline quality improvements through production process. Also customers’ direct cost loss due to poor gasoline quality was verified and calculated, where amounted to its highest value (9.084960 M.ID) at November.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Apr 10 2019
Journal Name
Iraqi Journal Of Market Research And Consumer Protection
QUALITY SYSTEMS.POSSIBILITY OF IMPLEMENTING IN SOME LOCAL FOOD ESTABLISHMENTS: QUALITY SYSTEMS.POSSIBILITY OF IMPLEMENTING IN SOME LOCAL FOOD ESTABLISHMENTS
...Show More Authors

In order to have an idea about what happens in Iraqi food establishments in relation to implement quality management system ISO 9001, this study was performed to show the actual situation of Iraqi food establishments concerning quality management system (ISO 9001:2015), reasons of implementing, factors that hinder implementing and problems faced high administration for getting establishments certification ISO 9001:2015. The study demonstrated from the questionnaire some difficulties to implement ISO 9001 for both of establishments that implemented the quality system or which in implementing of this international standard. The most important problems during implementing were business culture and costs and the most important proble

... Show More
View Publication Preview PDF
Publication Date
Wed May 10 2023
Journal Name
Journal Of Engineering
A Proposal Algorithm to Solve Delay Constraint Least Cost Optimization Problem
...Show More Authors

Traditionally, path selection within routing is formulated as a shortest path optimization problem. The objective function for optimization could be any one variety of parameters such as number of hops, delay, cost...etc. The problem of least cost delay constraint routing is studied in this paper since delay constraint is very common requirement of many multimedia applications and cost minimization captures the need to
distribute the network. So an iterative algorithm is proposed in this paper to solve this problem. It is appeared from the results of applying this algorithm that it gave the optimal path (optimal solution) from among multiple feasible paths (feasible solutions).

View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Archives Of Civil Engineeringthis Link Is Disabled
Factors affecting time and cost trade-off in multiple construction projects
...Show More Authors

Scopus (7)
Scopus
Publication Date
Tue Jan 12 2016
Journal Name
Wireless Networks
Low communication cost (LCC) scheme for localizing mobile wireless sensor networks
...Show More Authors

In recent years, the number of applications utilizing mobile wireless sensor networks (WSNs) has increased, with the intent of localization for the purposes of monitoring and obtaining data from hazardous areas. Location of the event is very critical in WSN, as sensing data is almost meaningless without the location information. In this paper, two Monte Carlo based localization schemes termed MCL and MSL* are studied. MCL obtains its location through anchor nodes whereas MSL* uses both anchor nodes and normal nodes. The use of normal nodes would increase accuracy and reduce dependency on anchor nodes, but increases communication costs. For this reason, we introduce a new approach called low communication cost schemes to reduce communication

... Show More
View Publication
Scopus (34)
Crossref (26)
Scopus Clarivate Crossref
Publication Date
Mon Jan 01 2024
Journal Name
Lecture Notes In Networks And Systems
Implementing a Smart Low-Cost System for Diagnosing Bacteria in Women
...Show More Authors

View Publication
Scopus Clarivate Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Artificial Neural Network Models to Predict the Cost and Time of Wastewater Projects
...Show More Authors

Infrastructure, especially wastewater projects, plays an important role in the life of residential communities. Due to the increasing population growth, there is also a significant increase in residential and commercial facilities. This research aims to develop two models for predicting the cost and time of wastewater projects according to independent variables affecting them. These variables have been determined through a questionnaire distributed to 20 projects under construction in Al-Kut City/ Wasit Governorate/Iraq. The researcher used artificial neural network technology to develop the models. The results showed that the coefficient of correlation R between actual and predicted values were 99.4% and 99 %, MAPE was

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Fri May 05 2023
Journal Name
International Journal Of Professional Business Review
Optimal no. Of Crew in a Workshop Subject to Minimize the Total Cost
...Show More Authors

Purpose: The main objective of this paper is, to determine the optimal no. of technicians’ men in a workshop crew of an Industrial System.   Theoretical framework: The purpose of applying these tools is to explore their ability to reduce costs and improvements that can be obtained in the process of providing services to the end customer.   Design/methodology/approach: The literature structure review was built from analyzing 12 of scientific papers and books, from web sciences and the Elsevier database. The papers were analyzed from descriptive, methodologic, and citation characteristics.   Finding:  By applying the equation model of the paper, the optimal no. of technician men in the crew of the workshop can be determined when

... Show More
View Publication
Scopus Crossref
Publication Date
Thu Jun 20 2019
Journal Name
Baghdad Science Journal
The Impact of Agile Methodologies and Cost Management Success Factors: An Empirical Study
...Show More Authors

Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are used in the Pakistani software industry. To determine the results, the researchers applied quantitative approach through an extensive survey on

... Show More
View Publication Preview PDF
Crossref (4)
Clarivate Crossref
Publication Date
Thu Dec 30 2004
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Effect of Sampling Period on Process Computer Control
...Show More Authors

View Publication Preview PDF
Publication Date
Tue Mar 12 2019
Journal Name
Al-khwarizmi Engineering Journal
Die Design of Flexible Multi-Point Forming Process
...Show More Authors

Multi-point forming (MPF) is an advanced flexible manufacture technology, and the technology results from the idea that the whole die is separated into small punches that can be adjusted height. This idea is applied to the traditional rigid blank-holder, so flexible blank-holder (FBH) idea can be obtained. In this work, the performance of a multi-point die is investigated with pins in square matrix and suitable blank holder. Each pin in the punch holder can be a significant moved according to the die high and at different load that applied with spring with respect to spring stiffness. The results shows the reduction in setting time with respect to traditional single point incremental forming process that lead to (90%). and also show duri

... Show More
View Publication Preview PDF
Crossref (2)
Crossref