This research presents a model for surveying networks configuration which is designed and called a Computerized Integrated System for Triangulation Network Modeling (CISTNM). It focuses on the strength of figure as a concept then on estimating the relative error (RE) for the computed side (base line) triangulation element. The CISTNM can compute the maximum elevations of the highest
obstacles of the line of sight, the observational signal tower height, the contribution of each triangulation station with their intervisibility test and analysis. The model is characterized by the flexibility to select either a single figure or a combined figures network option. Each option includes three other implicit options such as: triangles, quadrilaterals, and central-point figures (which is to be subdivided into: triangle; quadrilateral, and pentagon). The model also has the property of the diverse modes of display for the output results; i.e. the results can be displayed in the shape of TwoDimensional (2-D) and Three- Dimensional (3-D) representations. Visual Basic is the software depended as a main core in designing CISTNM to draw the suggested network in 2-D to display the network point positions and formations, and it can be linked with the available software such as ArcMap (GIS). The input data which is used as an application of the targeted geodetic surveying techniques (triangulation) is Chamchamal region as a case study in this research. The area lies in the north of Iraq. The results obtained after this application and verification, have proved that the CISTNM
can perform the required task easily and accurately.
Integrating Renewable Energy (RE) into Distribution Power Networks (DPNs) is a choice for efficient and sustainable electricity. Controlling the power factor of these sources is one of the techniques employed to manage the power loss of the grid. Capacitor banks have been employed to control phantom power, improving voltage and reducing power losses for several decades. The voltage sag and the significant power losses in the Iraqi DPN make it good evidence to be a case study proving the efficiency enhancement by adjusting the RE power factor. Therefore, this paper studies a part of the Iraqi network in a windy and sunny region, the Badra-Zurbatya-11 kV feeder, in the Wasit governorate. A substation of hybrid RE sources is connected to this
... Show MoreSuffer most of the facilities of the high cost of inventory , which affects the high cost of the product and thus affects many administrative decisions , as well as suffer the facilities of the systems developed by the provisions of inventory control , and this problem is exacerbated in the construction sector where the inventory in the form of Construction spin of the Year for another it becomes difficult to control the cost effectively , and is the research problem in question follows: What are the implications of the use of the system in time inventory accounting system for the contracting company does kills Alrkaah to the provisions of the cost of inventory and what is the optimal approach to inventory control ? Find assumed
... Show MoreNystatin is the drug of choice for treatment of cutaneous fungal infections with main disadvantage that is the need for multiple applications to achieve complete eradication which may reduce patient compliance. Microparticles offer a solution for such issue as they are one of sustained release preparations that achieve slow release of drug over an extended period of time. The objectives of this study were to fabricate nystatin-loaded chitosan microparticles with the ultimate goal of prolonging drug release and to analyze the influence of polymer concentration on various properties of microparticles. Microparticles were prepared by chemical cross-linking method using glutaraldehyde as cross-linking agent. Five formulas, namely N1C1, N1C2,
... Show MoreA load-shedding controller suitable for small to medium size loads is designed and implemented based on preprogrammed priorities and power consumption for individual loads. The main controller decides if a particular load can be switched ON or not according to the amount of available power generation, load consumption and loads priorities. When themaximum allowed power consumption is reached and the user want to deliver power to additional load, the controller will decide if this particular load should be denied receiving power if its priority is low. Otherwise, it can be granted to receive power if its priority is high and in this case lower priority loads are automatically switched OFF in order not to overload the power generation. The
... Show More......
The Iraqi government seeks to overcome the financial crisis by investing and privatizing some projects to achieve sustainable growth. Most of the investment projects in Iraq suffer from many constraints that greatly impact the success of these projects. A survey of the opinions of a group of experts was conducted to identify the most important constraints facing the investment process in Iraq. Then the experts' answers were arranged in a closed questionnaire and distributed to the research sample for which the statistical analysis was conducted. Through it, the most important (17) factors that had the greatest impact on the failure of investment projects in Iraq were reached. One of the main constraints was
... Show MoreThere are still areas around the world suffer from severe shortage of freshwater supplies. Desalination technologies are not widely used due to their high energy usage, cost, and environmental damaging effects. In this study, a mathematical model of single-bed adsorption desalination system using silica gel-water as working pair is developed and validated via earlier experiments. A very good match between the model predictions and the experimental results is recorded. The objective is to reveal the factors affecting the productivity of fresh water and cooling effect in the solar adsorption system. The proposed model is setup for solving within the commercially-available software (Engineering Equation Solver). It is implemented to so
... Show MoreAutonomous systems are these systems which power themselves from the available ambient energies in addition to their duties. In the next few years, autonomous systems will pervade society and they will find their ways into different applications related to health, security, comfort and entertainment. Piezoelectric harvesters are possible energy converters which can be used to convert the available ambient vibration energy into electrical energy. In this contribution, an energy harvesting cantilever array with magnetic tuning including three piezoelectric bimorphs is investigated theoretically and experimentally. Other than harvester designs proposed before, this array is easy to manufacture and insensitive to manufacturi
... Show MoreThe paper deals with claims in construction projects in Iraq and studies their types, causes, impacts, resolution methods and then proposes a management system to control the impacts of claims. Two parts have been done to achieve the research objective (theoretical part and practical part). The findings showed that the main types of the claims are extra work claims, different site condition claims, delay claims and the main causes of the claims are variation of the orders, design errors and omission, delay in payments by owner, variation in quantities and scheduling errors. The claims have bad impacts on the cost by increasing (10% to 25%) and also on the duration of the project by increasing from (25% to 50%).The negotiation is the main
... Show More