For many years, the construction industry damages have been overlooked such as unreasonable consumption of resources in addition to producing a lot of construction waste but with global awareness growth towards the sustainable development issues, the sustainable construction practices have been adopted, taking into account the environment and human safety. The research aims to propose a management system for construction practices which could be adopted during constructing different types of sustainable buildings besides formulating flowcharts which clarify the required whole phases of sustainable buildings life cycle. The research includes two parts: theoretical part which generally ,handles the sustainability concepts at construction industry and specially buildings .But the practical part comprises investigating the professional opinions in construction industry about applications possibility of sustainable requirements and global criteria to construction of sustainable buildings in Iraq where the weakness and strength points in the essential requirements for achieving the sustainable construction practices have been diagnosed and the development need
has been specified. The utilized statistical analysis of questionnaire results show readiness of buildings sectors to implement the sustainable practices. The different strategies and techniques in the proposed management have been employed for getting the sustainable procedures of sequences practices within project life cycle.
The development that solar energy will have in the next years needs a reliable estimation of available solar energy resources. Several empirical models have been developed to calculate global solar radiation using various parameters such as extraterrestrial radiation, sunshine hours, albedo, maximum temperature, mean temperature, soil temperature, relative humidity, cloudiness, evaporation, total perceptible water, number of rainy days, and altitude and latitude. In present work i) First part has been calculated solar radiation from the daily values of the hours of sun duration using Angstrom model over the Iraq for at July 2017. The second part has been mapping the distribution of so
Computer simulations were carried out to investigate the dependence of the main perturbation parameters (Sun and Moon attractions, solar radiation pressure, atmosphere drag, and geopotential of Earth) on the orbital behavior of satellite. In this simulation, the Cowell method for accelerations technique was adopted, the equation of motion with perturbation was solved by 4th order Runge-Kutta method with step (1/50000) of period to obtain the state vectors for position and velocity. The results of this simulation have been compared with data that available on TLEs (NORD data in two line elements). The results of state vectors for satellites (Cartosat-2B, Gsat-14 an
Objective: A descriptive design, using the methodological approach, is carried throughout the present
study from April 1st 2012 to May 20th 2013 to construct the school physical environment standardized
features tool.
Methodology: An instrument of (141) item is constructed for the purpose of the study. A purposive
sample of (44) school; (22) public and (22) private ones is selected. Content Validity of the instrument is
determined through the use of panel of (11) expert who are specialists in Community Health Nursing and
Community Medicine. Internal consistency reliability, using the split-half technique, is employed through
the computation of Cronbach alpha correlation coefficient of (0.93) for internal scale. Data
Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a
... Show MoreThis research sheds light on the morphological construction of kitchen terms in Hebrew language, especially methods of derivation, by offering an extensive review of the most important methods of morphological derivation. The field of kitchen terms is a fertile and rich field, where we see daily production of new kitchen tools which require suitable names with specific meanings. Morphologically, the research interested in methods of morphological derivation. So as to know and identify the common and effective methods to derive the kitchen terms in Hebrew language, in addition to put a special glossary of these terms. The research found that most of the kitchen terms were derived according to the methods of derivation prevailing in Hebrew la
... Show MoreThe current research deals with the subject of spatial transformations and visual construction in contemporary theater. How the visual system works to create spatial diversity in the contemporary Iraqi theater performance and how visual construction contributes to a spatial development process capable of building a tourism system that creates an architectural architecture that leaves the topography of the scriptural architecture. And the production of various indications and patterns in the scene of theatrical presentation in order to produce the new foundational meaning by creating a new structure that leads to diversity and diversity in the visual system and the beginning of visual constructions and their applications. Knowledge and te
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
In this paper generalized spline method is used for solving linear system of fractional integro-differential equation approximately. The suggested method reduces the system to system of linear algebraic equations. Different orders of fractional derivative for test example is given in this paper to show the accuracy and applicability of the presented method.