For many years, the construction industry damages have been overlooked such as unreasonable consumption of resources in addition to producing a lot of construction waste but with global awareness growth towards the sustainable development issues, the sustainable construction practices have been adopted, taking into account the environment and human safety. The research aims to propose a management system for construction practices which could be adopted during constructing different types of sustainable buildings besides formulating flowcharts which clarify the required whole phases of sustainable buildings life cycle. The research includes two parts: theoretical part which generally ,handles the sustainability concepts at construction industry and specially buildings .But the practical part comprises investigating the professional opinions in construction industry about applications possibility of sustainable requirements and global criteria to construction of sustainable buildings in Iraq where the weakness and strength points in the essential requirements for achieving the sustainable construction practices have been diagnosed and the development need
has been specified. The utilized statistical analysis of questionnaire results show readiness of buildings sectors to implement the sustainable practices. The different strategies and techniques in the proposed management have been employed for getting the sustainable procedures of sequences practices within project life cycle.
University Campuses, as any lively physical entity, is subject to continuous variation due to . growth, development and change. This reality covers the existing or futuristic additives or additions, consecutively these changes may have a strong sensation of disorientation as a result of formatic changes in buildings, or in movement paths. And it epitomized the research problem to "the need for knowledge to clarify the impact of intellectual and executive policy in achieving coherence, functional and space organization of the elements of the university urban environment and in the stages of future growth and change," the search targeted "to highlight the study of constraction politics on campus Bmqomad
... Show MoreObjective (s): To determine factors associated with the pregnancy complications (Maternal age, education,
obstetrical history, gravidity, birth space interval, and smoking).
Methodology: A cross-sectional study conducted at Al- washash & Bab-almoadham primary health care
centers. The sample was (non probability convenient sample) which included (550) pregnant women. The
study started from 1st April 2014 to 1
st of April 2015. The data was collected by direct interview using
special questionnaire to obtain socio-demographic information.
Results: the result shows that mean age of the subjects was 26.5± 4.39 years, 57.8% were housewives, the
sample included 103 premature uterine contractions, 98 pregnancy induce
BackgroundThe diagnosis and important aspects in treating acute abdomen during pregnancy tend to be delayed due to the peculiar physiological features of pregnancy and the restrictions imposed on imaging diagnostic techniques such as x-ray and CT.Aim of the studyTo identify the most common causes of acute abdomen during pregnancy and identifying the approaches for early diagnosis and to take a correct decision for surgery and assigning the complications that may occur during and/or after surgery for the mother and the fetus.Patients and Methods This is a prospective study that involves data obtained from 91 pregnant patients admitted in the surgical wards in Baghdad teaching hospital during the period from January 2008 to December 2009 .
... Show MoreThe construction project is a very complicated work by its nature and requires specialized knowledge to lead it to success. The construction project is complicated socially, technically and economically in its planning, management and implementation aspects due to the fact that it has many variables and multiple stakeholders in addition to being affected by the surrounding environment. Successful projects depend on three fundamental points which are cost-time, performance and specifications. The project stakeholder's objective to achieve best specifications and the cost-time frame stipulated in the contract.
The question is, was the optimum implementation accomplished? The provision for the success of the project
... Show MoreZubair Formation is one of the richest petroleum systems in Southern Iraq. This formation is composed mainly of sandstones interbedded with shale sequences, with minor streaks of limestone and siltstone. Borehole collapse is one of the most critical challenges that continuously appear in drilling and production operations. Problems associated with borehole collapse, such as tight hole while tripping, stuck pipe and logging tools, hole enlargement, poor log quality, and poor primary cement jobs, are the cause of the majority of the nonproductive time (NPT) in the Zubair reservoir developments. Several studies released models predicting the onset of borehole collapse and the amount of enlargement of the wellbore cross-section. However, assump
... Show MoreThe construction industry plays a crucial role in the countries' economy, especially in the developed country. This point encourages the concerned institution to use new techniques and integrate many techniques and methods to maximize the benefits. The main objective of this research is to evaluate the use of risk management, value management, and building information modeling in the Iraqi construction industry. The evaluation process aims at two objectives. The direct objective was to evaluate the knowledge in risk management (RM), value management (VM), and building information modeling (BIM). The indirect objective was to support the participants with information related to the main items mentioned. The questionnaire
... Show MoreIn Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due
... Show More
The problem of research on the study of political debate programs in the Iraqi satellite channels, in the "People decide" program by Afaq channel and " electoral competition " by Fallujah channel), and its importance for the community and researchers in the scientific field, as new programs to enter the Iraqi media after we have been the world media a lot in this area at the academic and practical levels (The field), and seeks to find out what the technical construction of the programs of political debates in Iraqi satellite channels and methods of construction and methods of employment used by the technical elements in the presentation of the programs and The study adopted the surve |