Preferred Language
Articles
/
joe-2169
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Improving the Performance of Construction Project Information and Communication Management Using Web-Based Project Management Systems (WPMSs)
...Show More Authors

This paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Fri Nov 10 2023
Journal Name
2023 3rd International Scientific Conference Of Engineering Sciences (isces)
Using User Experience Metrics for Academic Management System of University of Baghdad
...Show More Authors

Interface evaluation has been the subject of extensive study and research in human-computer interaction (HCI). It is a crucial tool for promoting the idea that user engagement with computers should resemble casual conversations and interactions between individuals, according to specialists in the field. Researchers in the HCI field initially focused on making various computer interfaces more usable, thus improving the user experience. This study's objectives were to evaluate and enhance the user interface of the University of Baghdad's implementation of an online academic management system using the effectiveness, time-based efficiency, and satisfaction rates that comply with the task questionnaire process. We made a variety of interfaces f

... Show More
View Publication
Scopus Crossref
Publication Date
Thu May 28 2020
Journal Name
Iraqi Journal Of Science
Development of an Attendance System Based on Cloud / Fog Computing with Data Recovery Capability
...Show More Authors

Given the high importance of attendance for university students, upon which the possibility of keeping or losing their places in the course is based, it is essential to replace the inefficient manual method of attendance recording with a more efficient one.  To handle this problem, technology must be introduced into this process. This paper aims to propose an automatic attendance system based on passive Radio Frequency Identification (RFID), fog, and cloud computing technologies (AASCF). The system has three sides. The first one, which is the Client-side; works on collecting the attendance data then sending a copy from it. The second side, which is the Server-side, works on calculating an absence ratio of all the students during the

... Show More
View Publication Preview PDF
Scopus (6)
Crossref (3)
Scopus Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Journal Of Engineering
Procurement Management of Power Plants Construction Projects in Iraq
...Show More Authors

The government of Iraq states that despite the massive amounts invested in the power generating sector, the country has been plagued by power outages for more than three decades; One of the most common sources of the problem and significant impact on the waste of public funds in contractual processes. The Ministry of Planning issued the sectorial
specialized standard bidding documents (SSBD) of Design, Supply, and Installation of the Electromechanical Works (DSIoEW), which is primarily designed to support the Ministry of Electricity (MoE) by developing economic projects to improve the contractual process that led to raisings Iraqi electricity generation field. The research evaluates the impact of
applying the SSBD-DSIoEW for

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Professional Safety
How Technology Can Improve OSH Management in Construction
...Show More Authors

Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Mon Sep 01 2014
Journal Name
Al-khwarizmi Engineering Journal
Using TermoDeck System for Pre-Cooling/ Heating to Control the Building Inside Conditions
...Show More Authors

In this paper, experimental study has been done for temperature distribution in space conditioned with Ventilation Hollow Core Slab (TermoDeck) system. The experiments were carried out on a model room with dimensions of (1m 1.2m 1m) that was built according to a suitable scale factor of (1/4). The temperature distributions was measured by 59 thermocouples fixed in several locations in the test room. Two cases were considered in this work,  the first one during unoccupied period at night time (without external load) and the other at day period with external load of 800W/m2 according to solar heat gain calculations during summer season in Iraq. All results confirm the use of TermoDeck system for ventilation and cooling/heat

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
The reality of smart city development management in the comprehensive development plan for the city of Baghdad 2030
...Show More Authors

Abstract

Abstract has many advantages as has historically been one of the regions leading cultural centers . for centuries , it has been a center of commertial and financial operations in Iraq. it is also rich in archeological sites and natural resources, but because of its wars and implementation of urban development strategies are effective and sustainable , so contracted the secretariat of Baghdad with the company (khatib and scirntiffic) for the preparation of the comprehensive development plan for the city of Baghdad in 2030 and funded by the world bank and the fact that the plan was approved ( three stages of it ) and only one phase remains the fourth stage, which is under discussion the aim of the

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Sat Jul 01 2023
Journal Name
Journal Of Engineering
Develop Proactive System for Risk Management (DPSRM) for Lagging Investment Project in Iraq.
...Show More Authors

To finalize any construction investment project, it would be necessary to identify the most significant problems and obstacles that lead to project reluctance and stalling. Unexpected events and conflicts may have disrupted these strategies and impacted project development. Due to the high initial investment costs of construction projects, crises can have an immediate impact, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which prompted the researcher to identify and evaluate those obstacles through this research and questionnaires using Pareto scientific theory to exclude factors that do not contribute to project lag. It was discovered that 28 o

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Sep 01 2020
Journal Name
Al-khwarizmi Engineering Journal
Arduino-Based Controller for Sequence Development of Automated Manufacturing System
...Show More Authors

It has become necessary to change from a traditional system to an automated system in production processes, because it has high advantages. The most important of them is improving and increasing production. But there is still a need to improve and develop the work of these systems. The objective of this work is to study time reduction by combining multiple sequences of operations into one process. To carry out this work, the pneumatic system is designed to decrease\ increase the time of the sequence that performs a pick and place process through optimizing the sequences based on the obstacle dimensions. Three axes are represented using pneumatic cylinders that move according to the sequence used. The system is implemented and

... Show More
Preview PDF
Crossref (4)
Crossref