Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.
The research presents the reliability. It is defined as the probability of accomplishing any part of the system within a specified time and under the same circumstances. On the theoretical side, the reliability, the reliability function, and the cumulative function of failure are studied within the one-parameter Raleigh distribution. This research aims to discover many factors that are missed the reliability evaluation which causes constant interruptions of the machines in addition to the problems of data. The problem of the research is that there are many methods for estimating the reliability function but no one has suitable qualifications for most of these methods in the data such
The research includes a clinical study of Preptin with other parameters. The normal value of preptin in hypothyroidism (2638.4±280.0) in female while (2960.4±256.6) in male, in hyperthyroidism (589.0±90.1) in male, while in female (993.2±103.9), diabetes (2465.6±282.4) in female, in male (2085.5±282.8), in diabetes & hypothyroidism (3314.3±177.3) in male,(3179.4±265.7) in female, but control group in female (427.8±60.4), in male (384.7±62.4) at age (20-45) years they were divided into five groups: group one (G1) consisted of 30 hypothyroidism. The two group (G2) consisted of 30 patients with hyperthyroidism. And three group (G3) consisted of 30 healthy group, four group (G4) consisted of 30 patient with diabetes, and five group (G
... Show MoreThis paper presents an enhancement technique for tracking and regulating the blood glucose level for diabetic patients using an intelligent auto-tuning Proportional-Integral-Derivative PID controller. The proposed controller aims to generate the best insulin control action responsible for regulating the blood glucose level precisely, accurately, and quickly. The tuning control algorithm used the Dolphin Echolocation Optimization (DEO) algorithm for obtaining the near-optimal PID controller parameters with a proposed time domain specification performance index. The MATLAB simulation results for three different patients showed that the effectiveness and the robustness of the proposed control algorithm in terms of fast gene
... Show MoreThis research aims to knowledge of the scope of applying the international specification of which is regarded to occupational health and safety management system (OHSAS 18001) second edition for year 2007 by The AL-Mammon Factory / The General Company For Vegetable Oils Industry in order to diagnosis the gap between specification requirements and reality by using the checklist made based upon the items of the specification, after translating the English copy into Arabic. The results of the research and analysis that occupational health and safety management system in comparison to the specification requirements in all of its main items, which was (%22.26) applied and documented partly, this refer to the existence of great gap (%7
... Show MoreThe practice by the administration of human resources on effectiveness of organization crisis as two knowledge fields , it were be until now as center for many studies, but the collect it, study of relation between them ,and The role of practices by the administration of human resources on effectiveness of organization crisis administration were considered a new study and first according to the available and showing studies at this field .
The problem of this research was specified by answer for the question that deal for size of consciousness at the ministry of interior for import of&nbs
... Show MoreThis study investigated a novel application of forward osmosis (FO) for oilfield produced water treatment from the East Baghdad oilfield affiliated to the Midland Oil Company (Iraq). FO is a part of a zero liquid discharge system that consists of oil skimming, coagulation/flocculation, forward osmosis, and crystallization. Treatment of oilfield produced water requires systems that use a sustainable driving force to treat high-ionic-strength wastewater and have the ability to separate a wide range of contaminants. The laboratory-scale system was used to evaluate the performance of a cellulose triacetate hollow fiber CTA-HF membrane for the FO process. In this work, sodium chloride solution was used as a feed solution (FS) with a concentratio
... Show More