Preferred Language
Articles
/
joe-2169
Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Apr 01 2022
Journal Name
Baghdad Science Journal
An Evolutionary Algorithm for Solving Academic Courses Timetable Scheduling Problem
...Show More Authors

Scheduling Timetables for courses in the big departments in the universities is a very hard problem and is often be solved by many previous works although results are partially optimal. This work implements the principle of an evolutionary algorithm by using genetic theories to solve the timetabling problem to get a random and full optimal timetable with the ability to generate a multi-solution timetable for each stage in the collage. The major idea is to generate course timetables automatically while discovering the area of constraints to get an optimal and flexible schedule with no redundancy through the change of a viable course timetable. The main contribution in this work is indicated by increasing the flexibility of generating opti

... Show More
View Publication Preview PDF
Scopus (16)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Sat Jul 09 2022
Journal Name
Wireless Communications And Mobile Computing
An Optimized Approach for Industrial IoT Based on Edge Computing
...Show More Authors

The Internet of Things (IoT) is an information network that connects gadgets and sensors to allow new autonomous tasks. The Industrial Internet of Things (IIoT) refers to the integration of IoT with industrial applications. Some vital infrastructures, such as water delivery networks, use IIoT. The scattered topology of IIoT and resource limits of edge computing provide new difficulties to traditional data storage, transport, and security protection with the rapid expansion of the IIoT. In this paper, a recovery mechanism to recover the edge network failure is proposed by considering repair cost and computational demands. The NP-hard problem was divided into interdependent major and minor problems that could be solved in polynomial t

... Show More
View Publication
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Engineering
Exploring the Factors Affecting the Elemental Cost Estimation with Relationship Analysis Using AHP
...Show More Authors

Cost estimation is considered one of the important tasks in the construction projects management. The precise estimation of the construction cost affect on the success and quality of a construction project. Elemental estimation is considered a very important stage to the project team because it represents one of the key project elements. It helps in formulating the basis to strategies and execution plans for construction and engineering.  Elemental estimation, which in the early stage, estimates the construction costs depending on  . minimum details of the project so that it gives an indication for the initial design stage of a project. This paper studies the factors that affect the elemental cost estimation as well as the rela

... Show More
View Publication Preview PDF
Publication Date
Fri Feb 01 2019
Journal Name
Indian Journal Of Natural Sciences
Design and Test of Electrochemistry of Electrodes Catalysis for an Alkaline Fuel Cell
...Show More Authors

Preview PDF
Publication Date
Sun Mar 05 2017
Journal Name
Baghdad Science Journal
An efficient of Sansevieriatrifasciataplantas biosorbent for the treatment of metal contaminated industrial effluents
...Show More Authors

Sansevieriatrifasciata was studied as a potential biosorbent for chromium, copper and nickel removal in batch process from electroplating and tannery effluents. Different parameters influencing the biosorption process such as pH, contact time, and amount of biosorbent were optimized while using the 80 mm sized particles of the biosorbent. As high as 91.3 % Ni and 92.7 % Cu were removed at pH of 6 and 4.5 respectively, while optimum Cr removal of 91.34 % from electroplating and 94.6 % from tannery effluents was found at pH 6.0 and 4.0 respectively. Pseudo second order model was found to best fit the kinetic data for all the metals as evidenced by their greater R2 values. FTIR characterization of biosorbent revealed the presence of carboxyl a

... Show More
View Publication Preview PDF
Scopus (1)
Crossref (2)
Scopus Crossref
Publication Date
Fri Jun 30 2023
Journal Name
College Of Islamic Sciences
Hisba system in Islam
...Show More Authors

 

Through research it shows that the calculation has an effective role in the maintenance of Islamic law and save. And that the calculation religious function to attach religious matters and it closeness to God, whether calculated or assumed carried out by volunteers. And scientists from the description of the calculation as a social function to attach to morality and kinship and charity to the poor and the dissemination of science. By definition it shows that the injury will not be exposed only to the evils of any phenomenon that do not break and was checking to search for evil, but he must intervene if he saw visible in front of him. And that of the areas that could see the calculation are the field of information and educ

... Show More
View Publication Preview PDF
Publication Date
Tue Sep 07 2021
Journal Name
Journal Of Petroleum Exploration And Production Technology
Wellbore instability management using geomechanical modeling and wellbore stability analysis for Zubair shale formation in Southern Iraq
...Show More Authors
Abstract<p>Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modifie</p> ... Show More
View Publication
Scopus (35)
Crossref (34)
Scopus Clarivate Crossref
Publication Date
Sat Jun 02 2018
Journal Name
Agroforestry Systems
Biomass and buffer management practice effects on soil hydraulic properties compared to grain crops for claypan landscapes
...Show More Authors

View Publication
Scopus (19)
Crossref (15)
Scopus Clarivate Crossref
Publication Date
Sat Dec 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The Proposed Introduction to Activate the Role of Accounting System for Political Parties in Iraq
...Show More Authors

     Purpose - The study aimed at evaluating the accounting system of the Iraqi political parties, which is applied according to legislative texts, and then the ability to provide accounting information to evaluate the strategic performance and control of the party's operational and financial performance.
Findings- The research found that the unified accounting system applied to political parties does not provide relevance informations to judge the performance of the political party, the researcher a proposal for an accounting system that provides the necessary information to measure and monitor the performance of Iraqi political parties can be presented. The

... Show More
View Publication
Crossref
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Engineering
Numerical Simulation of Unsaturated Soil Water from a Trickle Irrigation System for Sandy Loam Soils
...Show More Authors

Trickle irrigation is a system for supplying filtered water and fertilizer directly into the soil and water and it is allowed to dissipate under low pressure in an exact predetermined pattern. An equation to estimate the wetted area of unsaturated soil with water uptake by roots is simulated numerically using the HYDRUS-2D/3D software. In this paper, two soil types, which were different in saturated hydraulic conductivity were used with two types of crops tomato and corn, different values of emitter discharge and initial volumetric soil moisture content were assumed. It was assumed that the water uptake by roots was presented as a continuous sink function and it was introduced into Richard's equation in the unsaturated z

... Show More
View Publication Preview PDF
Crossref (1)
Crossref