The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors practicing because receipts are based upon actual quantities, such variations have an obvious impact on the contractor’s cash flow, once the actual quantities frequently vary from the estimated quantities listed in the BOQ. Hence, automation quantity surveying system has been developed by using GIS to extract the
data required for the quantity of different components of any construction project from AutoCAD drawings (spatial data), to report a BOQ after querying, manipulation, and analyzing these data. The system has been implemented on the construction project of Al khawarizmy College at Baghdad University in Baghdad. The main results of using this system are automatic generation a bill of quantity (BOQ) directly from design drawing, with overcome to design changing, accurate, fast, and effective method for estimating the quantities, fewer errors in cost estimating, and better documentation for continuously reusing information in all construction phases. The accuracy of GIS quantities had been proved by comparing these quantities with the quantities of site surveying. Then determining the accuracy percentage (A%) of GIS quantities which equals (98.85%), and the regression line that equals 0.999. These values mean; there are big correlation between the estimated quantities by GIS and the quantities of site surveying.
In this study, the response and behavior of machine foundations resting on dry and saturated sand was investigated experimentally. A physical model was manufactured to simulate steady state harmonic load at different operating frequencies. The effect of relative density, depth of embedment, foundation area as well as the imposed harmonic load was investigated. It was found that the amplitude of displacement of the foundation increases with increasing the amplitude of dynamic force and operating frequency meanwhile it decreases with increasing the relative density of sand, degree of saturation, depth of embedment and contact area of footing. The maximum displacement was noticed at 33.34 to 41.67 Hz. The maximum displaceme
... Show MoreBackground and Objectives: Wound healing is a complex process with overlapping phases haemostasis, inflammation, proliferation and maturation/matrix remodeling. Each phase of wound healing requires different management strategies, and inappropriate treatment can delay wound healing. The aim of the present study was to evaluate the efficacy of topical application of calmodulin as a significant augmentation of the granulation tissue production process of wound healing and to express of genes CaMKK2, MaP2K6 and CXCR4 at site of wound defect, that have versatile effects on the body and they belong to Ca/camodulin related genes. Material and Methods: In this study thirty albino male rats, weighting (300-400) gram, aged (6-8) months, wil
... Show MoreBackground: The restoration of bone continuity and bone union are complex processes, and their success is determined by the effectiveness of osteosynthesis. The use of plants for healing purposes predates human history and forms the source of current modern medicine The aim of this study: It was histological evaluation of effect of topical application of flavonoid on healing of induced bone defect in rabbit tibia. Material and method: Twenty-four Adult New Zealand rabbits used in this study, they were divided into four groups for the healing periods (3days, 1,2, and 4weeks) Two holes were induced in rabbit tibia one on the left side and has been left to heal normally as control. While, the other hole made on the right side filled with flavo
... Show MoreBackground: World Health Organization (WHO) and United Nation International Children Fund (UNICEF) developed a strategy known as Integrated Management of Childhood Illness (IMCI); which aims to reduce less than five years children morbidity and mortality in developing countries.
Objective: To assess the completion of the IMCI format status in primary health care centers, Baghdad.
Methods: A cross sectional study with analytic element was conducted during the period from 15th of January till 15th May 2016 in selected Primary health centers in Baghdad, Iraq. The sample consists of form of child files less than 2 months and form from 2
... Show MoreRoller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc