Al-Rustamiya sewage treatment plant (WWTP) serves the east side of Baghdad city (Rusafa) and is considered one of the largest projects.It consists of three parts (old project F0, first extension F1, and second extension F2) that treat wastewater and the
effluent is discharged into Diyala river and thus into the Tigris River. These plants are designed and constructed with an aim to manage wastewater to reachIraqi effluent standard for BOD5, COD, TSS and chloride concentrations of 40, 100, 60 and 600
mg/L respectively. The data recordedfrom March till December 2011 provided from Al-RustamiyaWWTP, were considered in this study to evaluate the performance of the plant. The results indicated that the strength of the wastewater entering the plant
varied from medium to high. The average concentrations of the effluent of BOD5, COD, TSS and chloride were within Iraqi effluent standards. The overall efficiency removalswere: For BOD5: 92.1, 90.31, and 92.96% for F0, F1, and F2 respectively COD: 88.23, 87.9, and 87.95% for F0, F1, and F2 respectively TSS: 86.98, 80.72, and 89% for F0, F1, and F2 respectively Chloride: 14.79, 15.37, and 15.31% for F0, F1, and F2 The mean value of BOD5/COD ratio of the raw wastewater was 0.67 as for typical untreated domestic wastes. The mean BOD/COD ratios of the treated sewage from F0 was 0.48, from F1 0.50 and from F2 0.38. These ratios did not confirm with the typical ratios indicating that the wastewaterneeds more treatment
This study aims to evaluate the performance of the sewage treatment plant in Al-Diwaniya, one of cities in the southern part in Iraq. This evaluation could be used to facilitate effluent quality assessment or optimal process control of the plant. The influent reaching the plant is considered a medium to strong in strength with BOD5/COD ratio in the range 0.23 and 0.69 which can be considered an easily degradable sewage by the biological processes performed by the activated sludge unit. The quality of the effluent was found to be higher than the Iraqi standards for disposal to water bodies. The BOD5/COD ratios of the treated sewage varied over a wide range as low of 0.13 to 1.48 indicating operational problems in the plant. Regression ana
... Show MoreThis study aims to assess the removal efficiency andestablish the BOD5 and COD statisticalcorrelation of the sewage flowing in Al-Diwaniyah wastewater treatment plant in Iraq during the study period (2005-2016). The strength of the influent wastewater entering the plant varied from medium to high in strength. High concentrations of BOD5 and COD in the effluent were obtained due to the poor performance of the plant. This was observed from the BOD5 /COD ratios that did not confirm with the typical ratios for the treated sewage. To improve the performance of this plant, regression equations for BOD5 and COD removal percentages were suggested which can be used to facilitate evaluation of liquid waste and optimal control process. The equations
... Show MoreIn recent decades, there has been increasing interest in wastewater treatment because of its direct impact on the environment and public health. Over time, other forms of treatment have been developed and modified, including extended aeration. This process is included in the suspended growth system. In this paper, a comparative study was conducted between the efficiency of the extended aeration plant and that of the trickling filter plant in removal of BOD and COD. The method of comparison was done by knowing the value of the pollutant before and after the treatment and then extract the removal ratio of each pollutant within each plant. The results showed that the percentage of removal of BOD in the trickling filte
... Show MoreThe objective of this study is to verify the overall performance and evaluate the wastewater quality of the wastewater treatment plant at the Abu Ghraib Dairy Factory and compare the results with the Iraqi Quality Standards (IQS) for effluent disposal and with the national determinants of treated water use. Agricultural irrigation wastewater, which included daily assessment records of the main parameters affecting wastewater [five-day biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total dissolved solids (T.D.S), total suspended solids (TSS), phosphate (PO4), nitrate (NO3), hydrogen ion concentration (pH)] obtained from the quality control department of Abu Ghraib dairy plant registered from January 2017 to December 2020. Th
... Show MoreThis study aims to evaluate drinking water quality at the Al Wahda plant (WTP) in Baghdad city. A conventional water treatment plant with an average flow rate of 72.82 MLD. Water samples were taken from the influent and effluent of the treatment plant and analyzed for some physicochemical and biological parameters during the period from June to November 2020. The results of the evaluation indicate that treated water has almost the same characteristics as raw water; in other terms, the plant units do not remove pollutants as efficiently as intended. Based on this, the station appears to be nothing more than a series of water passage units. However, apart from Total dissolved solids, the mean values of all parameters in the study were
... Show MoreWater quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their performance is evaluated usin
... Show MoreWater quality planning relies on Biochemical Oxygen Demand BOD. BOD testing takes five days. The Particle Swarm Optimization (PSO) is increasingly used for water resource forecasting. This work designed a PSO technique for estimating everyday BOD at Al-Rustumiya wastewater treatment facility inlet. Al-Rustumiya wastewater treatment plant provided 702 plant-scale data sets during 2012-2022. The PSO model uses the daily data of the water quality parameters, including chemical oxygen demand (COD), chloride (Cl-), suspended solid (SS), total dissolved solids (TDS), and pH, to determine how each variable affects the daily incoming BOD. PSO and multiple linear regression (MLR) findings are compared, and their perfor
... Show MoreThis study aims to evaluate drinking water quality at the Al Wahda plant (WTP) in Baghdad city. A conventional water treatment plant with an average flow rate of 72.82 MLD. Water samples were taken from the influent and effluent of the treatment plant and analyzed for some physicochemical and biological parameters during the period from June to November 2020. The results of the evaluation indicate that treated water has almost the same characteristics as raw water; in other terms, the plant units do not remove pollutants as efficiently as intended. Based on this, the station appears to be nothing more than a series of water passage units. However, apart from Total dissolved solids, the mean values of all parameters in th
... Show More