Orthogonal Frequency Division Multiplexing (OFDM) is one of recent years multicarrier modulation used in order to combat the Inter Symbol Interference (ISI) introduced by frequency selective mobile radio channel. The circular extension of the data symbol, commonly referred to as cyclic prefix is one of the key elements in an OFDM transmission scheme. This paper study The influence of the cyclic prefix duration on the BER performance of an OFDM-VCPL (Orthogonal frequency division multiplexing - Variable Cyclic Prefix Length) system and the conventional OFDM system with frame 64-QAM modulation is evaluated by means of computer simulation in a multipath fading channel. The adaptation of CP is done with respect to the delay spread estimation of the channel.
The derivatives formed after the successive acetylation, esterification and nitration reactions to cholic, deoxycholic, and taurocholic acids were identified to be of the following general strucure: Colt, Where RI=NO3, OH, 0=, or CH3COO. R2=H, NO3, OH, 0-=, or CH3COO. R3=H, NO3,01-1, 0=, or CH3COO. R4=OH, NH(CH2)2S03Na, NH(CH2)2S03H, or OMe. By using U.V-visible and I.R spectrophotometry . The number of hydroxyl groups was determined, purity was checked from T.L.C, Most of these derivatives will find pharmaceutical application.
Prosthetic hands are compensatory devices for the hand amputees as a result of injury, various accidents or birth deformities, types of prosthetic hand vary depending on the mechanism they operate and how they perform. There are common types in use that are characterized by their complex mechanisms, which are difficult for the amputee to use or exclude use because of their high cost, therefore the aim of this research is to design an artificial hand that is suitable in terms of simplicity of use and low cost and similar to a natural hand with regard to dimensions and shape that operated in the mechanism of links. This research involves Stress and strain analysis of the prosthetic hand and its fingers that modelled from (Petg CR)
... Show MoreTwo novel demountable shear connectors for precast steel-concrete composite bridges are presented. The connectors use high-strength steel bolts, which are fastened to the steel beam with the aid of a special locking configuration that prevents slip of bolts within their holes. Moreover, the connectors promote accelerated construction and overcome typical construction tolerances issues of precast structures. Most importantly, the connectors allow bridge disassembly, and therefore, can address different bridge deterioration scenarios with minimum disturbance to traffic flow, i.e. (1) precast deck panels can be rapidly uplifted and replaced; (2) connectors can be rapidly removed and replaced; and (3) steel beams can be replaced, while precast
... Show Moreيهدف البحث الى تحليل الخيارات الاستراتيجية للاقتراض الخارجي في العراق لاستشراف افضل الخيارات الاستراتيجية المستقبلية في مجال الاقتراض الخارجي في دائرة الدين العام في وزارة المالية ، وقد استخدم الباحث منهج دراسة الحالة وباستعمال اسلوب تحليل خوارزمية ال K-Means لتشخيص كفاءة الاقتراض الخارجي لعينة البحث البالغة (81) قرضا التي اقترضتها وزارة المالية للفترة 2007-2020 . ولقد كان الغرض الرئيسي للبحث المساهمة في تمكين وزا
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa
