Preferred Language
Articles
/
joe-1957
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Engineering
Application of Total Quality Management (TQM) Requirements in Risk Management in Construction Projects in Iraq
...Show More Authors

Total quality management  considers one of the modern scientific entrances  which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have  in a manner in which they can be addressed and find ways to avoid them in the future when repeated.                          &n

... Show More
View Publication Preview PDF
Publication Date
Mon May 27 2019
Journal Name
Al-academy
The Symbolic Construction of Scenes of Love in the Feature Film: محمد عبد الحميد ضيدان
...Show More Authors

Scenes of love constitute a large space within the orbit of the movies, so that there is almost no film (no matter what kind) void of these scenes, as they are associated with many dimensions and they constitute a major attraction for viewers, and thus the direction solutions and their connection to the director's vision constitute a large part in the process of employing signs to highlight what should be highlighted or to refer to it symbolically on the grounds that the director does not have full freedom in the transfer of scenes of love at all levels as they are in reality. The research included three sections within the theoretical framework:The first section: the concept of image and its rhetorical importance. This section discussed

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Jun 01 2021
Journal Name
Political Sciences Journal
Regionalism Hegemony of Political Life in Tunisia and its influence upon construction of Political System
...Show More Authors

The topic area of that’s paper dealing with regionalism hegemony upon ruling affairs and political life in Tunisia, this phenomena had historical origins, even before region of French occupation in 1881, after independence, the regionalism domination was practice and normal, the political system justified it's with many causes, like level of education, connection with Western civilization, enlighten intelligent, economic conditions in coast region and North of Tunisia compared with the South, also the role of President Bourqiba as founder of Modern Tunisia, he was from Monster (North of country) which was dominated as charismatic leader dedicate the regionalism domination through decades, yet after revolution in 2011, little changes ha

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon May 19 2025
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.

... Show More
View Publication
Publication Date
Mon Feb 08 2021
Journal Name
Public Works Management & Policy
Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
...Show More Authors

This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is

... Show More
View Publication
Scopus (17)
Crossref (21)
Scopus Clarivate Crossref
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
distu

... Show More
View Publication Preview PDF
Crossref (4)
Crossref
Publication Date
Tue May 01 2018
Journal Name
Practice Periodical On Structural Design And Construction
Hazards and Risk in Construction and the Impact of Incentives and Rewards on Safety Outcomes
...Show More Authors

View Publication
Scopus (28)
Crossref (22)
Scopus Clarivate Crossref
Publication Date
Mon Mar 01 2021
Journal Name
Journal Of Management In Engineering
Identifying Pertinent Indicators for Assessing and Fostering Diversity, Equity, and Inclusion of the Construction Workforce
...Show More Authors

View Publication
Scopus (56)
Crossref (60)
Scopus Clarivate Crossref
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Wed Oct 02 2024
Journal Name
International Development Planning Review
A COMPARATIVE STUDY OF THE AMOUNT OF FORCE EXERTED ON THE GROUND AND THE TIME OF PROPULSION IN THE VERTICAL AND HORIZONTAL JUMPING TESTS FROM STABILITY USING A FOOT SCAN DEVICE
...Show More Authors