In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
The currency in circulation is a key element of the monetary supply system of the Iraqi economy because itreflects the level of economic activity and the liquidity level in the market. It can be expressed as an important tool when formulating monetary policy. This research aims to analyze and forecast the behavior of the currency in circulation in Iraq using the ARMA-GARCH model for monthly data from 2004 to 2025 to understand the dynamics of monetary liquidity, The sample was divided into two parts: approximately 80% for the training set (2004-2021), and approximately 20% for the testing set (2022-2025). Data were analyzed in Python using many packages. The results showed that the time series was initially non-stationary but became
... Show MoreThis research is determined by the study of the " cognitive references of the directorial imagination and modeling of the theatrical actor performance ." it has described an Iraqi theatrical model, The research began with the great importance of the director's imagination as the basic premise for crystallizing the director's vision according to its cognitive references in creating a solid performance model based on the aesthetic, intellectual and technical bases, It is also contributes to the formation of the theatrical show as a technical framework that presents the show in one unified fabric.
The research sought to reach through the problem of research, which is in the question of: What is the modeling of the
... Show MoreThe aim of this paper is to estimate the concentrations of some heavy metals in Mohammed AL-Qassim Highway in Baghdad city for different distances by using the polynomial interpolation method for functions passing from the data, which is proposed by using the MATLAB software. The sample soil in this paper was taken from the surface layer (0-25 cm depth) at the two sides of the road with four distances (1.5, 10, 25 and 60 m) in each side of the road. Using this method, we can find the concentrations of heavy metals in the soil at any depth and time without using the laboratory, so this method reduces the time, effort and costs of conducting laboratory analyzes.
The geological modeling of an oil-bearing reservoir, which specifies the lithology and analyzes the petrophysical parameters of complex reservoir, its being created using Petrel software to construct reservoir models that describe and estimate porosity and water saturation distributions. 3D modeling of carbonate reservoirs has proven to be a highly effective technique for evaluate the economic benefit of the reservoir by estimating the formation petrophysical properties and calculating the oil reserves. The study aims constructed on evaluated Yamama formation in Four drilling wells (Nasiriyah-1, Nasiriyah-3, Nasiriyah-4, and Nasiriyah-5) entering the Yamama Formation of the Al-Nasiriyah field. In Al-Nasiriyah Oil field, and within t
... Show More
This research aims to apply the Performance Focused Activity Based Costing System in the offices of scientific and advisory services at the University of Technology for the purpose of measuring the cost of services provided by these offices in order to reduce costs. To test the hypothesis of the research, the research was applied in the consulting offices of the University of Technology through the financial statements for the year ending 12/31/2017 of the Scientific and Consulting Services Office of the University of Technology, because the data of these years were issued and audited by the Federal Office of Financial Supervision.
A number of
... Show MoreThe information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors pract
... Show More