Preferred Language
Articles
/
joe-1957
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Wed Jul 05 2017
Journal Name
International Journal Of Science And Research (ijsr)
Assessing BIM Integration with Sustainable Requirement for Buildings Construction
...Show More Authors

View Publication
Crossref (4)
Crossref
Publication Date
Wed Feb 01 2023
Journal Name
Journal Of Engineering
Procurement Management of Power Plants Construction Projects in Iraq
...Show More Authors

The government of Iraq states that despite the massive amounts invested in the power generating sector, the country has been plagued by power outages for more than three decades; One of the most common sources of the problem and significant impact on the waste of public funds in contractual processes. The Ministry of Planning issued the sectorial
specialized standard bidding documents (SSBD) of Design, Supply, and Installation of the Electromechanical Works (DSIoEW), which is primarily designed to support the Ministry of Electricity (MoE) by developing economic projects to improve the contractual process that led to raisings Iraqi electricity generation field. The research evaluates the impact of
applying the SSBD-DSIoEW for

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Fri Apr 28 2017
Journal Name
جامعة بغداد- كلية اللغات- قسم اللغة العبرية
The morphological construction of kitchen terms in Hebrew language
...Show More Authors

This research sheds light on the morphological construction of kitchen terms in Hebrew language, especially methods of derivation, by offering an extensive review of the most important methods of morphological derivation. The field of kitchen terms is a fertile and rich field, where we see daily production of new kitchen tools which require suitable names with specific meanings. Morphologically, the research interested in methods of morphological derivation. So as to know and identify the common and effective methods to derive the kitchen terms in Hebrew language, in addition to put a special glossary of these terms. The research found that most of the kitchen terms were derived according to the methods of derivation prevailing in Hebrew la

... Show More
Preview PDF
Publication Date
Mon Nov 09 2020
Journal Name
Construction Research Congress 2020
How to Improve Workforce Development and Sustainability in Construction
...Show More Authors

View Publication
Scopus (11)
Crossref (7)
Scopus Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr

... Show More
View Publication
Crossref (6)
Crossref
Publication Date
Wed Jun 20 2018
Journal Name
Al-academy
Spatial transformations and visual construction in the contemporary theater
...Show More Authors

The current research deals with the subject of spatial transformations and visual construction in contemporary theater. How the visual system works to create spatial diversity in the contemporary Iraqi theater performance and how visual construction contributes to a spatial development process capable of building a tourism system that creates an architectural architecture that leaves the topography of the scriptural architecture. And the production of various indications and patterns in the scene of theatrical presentation in order to produce the new foundational meaning by creating a new structure that leads to diversity and diversity in the visual system and the beginning of visual constructions and their applications. Knowledge and te

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Ssrn Electronic Journal
Diagnoses of Delay Causes in Construction Projects During Disaster
...Show More Authors

Purpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost d

... Show More
View Publication
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Journal Of Engineering
Developing Crisis Management System for Construction Projects in Iraq
...Show More Authors

Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies l

... Show More
View Publication Preview PDF
Crossref (6)
Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Laboratory Investigation on Roller Compaction Technique in Concrete Construction
...Show More Authors

Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Thu Nov 17 2022
Journal Name
Aip Conference Proceedings
Principles of using project management tools and techniques of mitigate components causing delays and disruption in public and private construction projects in Iraq
...Show More Authors

Delays and disruption are a common issue in both community and personal building programs The problem exists all throughout the world, but it is particularly prevalent in Iraq, where millions of dollars are squandered each time as a outcome. Delays and interruptions may have serious consequences not just for Iraq's construction plans, but also for the country's economic and social status. While numerous studies have been conducted to investigate the factors driving delays and disruption in Iraqi construction projects, slight consideration has been given to by what means project management implements and approaches have affected the occurrence of project delays and disruption. After analyzing the crucial reasons for delays and instability in

... Show More
Crossref