In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
Diesel generators is widely used in Iraq for the purpose of maintaining electric power demand. Large number of operators engaged in this work encounters high level of noise generated by back pack type diesel generators used for this purpose. High level of noise exposure gives different kinds of ill effect on human operators. Exact nature of deteriorated work performance is not known., in present research , quastionaire was adsministered 86 repondents in Baghdad city were exposured to wide range of noise level (80-110) dB(A) with different ages and they have different skill discretion levels. Noise levels A-weigthed decibles dB(A) were measured over 8 weeks two times aday during the 2019 summer using a sound level meter.For predicting the wo
... Show MoreMany organizations today are interesting to implementing lean manufacturing principles that should enable them to eliminating the wastes to reducing a manufacturing lead time. This paper concentrates on increasing the competitive level of the company in globalization markets and improving of the productivity by reducing the manufacturing lead time. This will be by using the main tool of lean manufacturing which is value stream mapping (VSM) to identifying all the activities of manufacturing process (value and non-value added activities) to reducing elimination of wastes (non-value added activities) by converting a manufacturing system to pull instead of push by applying some of pull system strategies a
... Show MoreThe reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual
... Show MoreHigh temperature superconductor with nominal composition Bi1.6Pb0.4Sr1.8Ba0.2Ca2 Cu3O10+? was prepared by solid state reaction method. Two sets of samples have been prepared .The first one was quenched in air; the second set was quenched in liquid nitrogen. X-ray diffraction analyses showed an orthorhombic structure with two phases, high –Tc phase (2223) and low-Tc phase (2212) in addition to that impure phase was found. It has been observed that quenched in air samples display a sharp superconducting transition and a higher-Tc phase than that of the quenched in liquid nitrogen samples.
In this modern Internet era and the transition to IPv6, routing protocols must adjust to assist this transformation. RIPng, EIGRPv6 and OSPFv3 are the dominant IPv6 IGRP (Interior Gateway Routing Protocols). Selecting the best routing protocol among the available is a critical task, which depends upon the network requirement and performance parameters of different real time applications. The primary motivation of this paper is to estimate the performance of these protocols in real time applications. The evaluation is based on a number of criteria including: network convergence duration, Http Page Response Time, DB Query Response Time, IPv6 traffic dropped, video packet delay variation and video packet end to end de
... Show MoreEmpirical equations for estimating thickening time and compressive strength of bentonitic - class "G" cement slurries were derived as a function of water to cement ratio and apparent viscosity (for any ratios). How the presence of such an equations easily extract the thickening time and compressive strength values of the oil field saves time without reference to the untreated control laboratory tests such as pressurized consistometer for thickening time test and Hydraulic Cement Mortars including water bath ( 24 hours ) for compressive strength test those may have more than one day.
The Research dealt with the role of the target costs in reducing the cost of products in the General Company for soft drinks. One the modern approaches reduce costs and thus increase the ability and continuity to compete in the market. Where the problem of research in identifying the shortcomings in the traditional method used in the company sample research. Which led to a weak control of the cost and the researcher relied on data and costs of the company. The research recommended that the target cost of the company should be applied to the research sample. Training the employees. In addition, preparing training courses for them. He stressed the need to address obstacles that prevent the existence of an effective cost system. Including t
... Show More