In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
The subject of research entitled "The Mechanisms of build up the dramatic construction in the films of the world of nature - National Geographic's films as a model" emerges from the importance of the subject of the dramatic construction and its departure from its classic style due to the evolution of the visual presentation and its instruments and the specificity and emergence of a form of television production represented by the films of the world of nature which began to occupy an important space in the map of television and television channels specialized in this subject, which drove the researcher to study the mechanisms of producing the dramatic construction in this kind of film s. This research came in three chapt
... Show MoreThere is no doubt that the field of education and teaching (in any country and whatever its ruling system varies “d”) is considered one of the most specific and sensitive field, because it is related to the building of human. And as the human is a purpose (aim) and the means in the same time and he is the strategist capital, so he way of his rearing, education, choosing the educator, methods of working and the aims are considered serious matters.
The educational process has aim determined by the society for him self through its working establishments in this field and these are the official and public establishments. And as he feels that the establishments have failed to achieve its d
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreIn this paper, compared eight methods for generating the initial value and the impact of these methods to estimate the parameter of a autoregressive model, as was the use of three of the most popular methods to estimate the model and the most commonly used by researchers MLL method, Barg method and the least squares method and that using the method of simulation model first order autoregressive through the design of a number of simulation experiments and the different sizes of the samples.
The aim of the research to apply TD-ABC technology to determine the idle capacity of the central oil companies (oil field east of Baghdad), as a modern cost management technology based on time-oriented activities (TD-ABC) is used by industrial companies in general and oil companies on In particular to build a sustainable Calvinist pillar and make future decisions by identifying idle energy to gain it a competitive advantage, the descriptive analytical approach has been adopted in calculating and analyzing the company’s data for 2018, and the most prominent conclusions of this research are managing idle energy and the task of applying cost technology on the basis of time-oriented activities and providing Convenient spatial infor
... Show MoreThe Backstepping Sliding Mode Control is a control technique used for controlling nonlinear systems. In this paper, the performance of the backstepping sliding mode controller schemes for the angular velocity control for a rotary actuator of an angular velocity control system that utilizes a novel hydraulic flow control method called inlet throttling was investigated. For the angular velocity dynamic, a linear state feedback with suitable high gain is designed as the virtual controller, where steady state error can be made arbitrarily small according to the gain value. A time varying sliding variable is then selected based on the designed virtual controller. The resulting control design is robust, and the maximum error of the angular veloci
... Show MoreBackground: Alginate impression material is the irreversible hydrocolloid material that is widely used in dentistry. The contact time between alginate and gypsum cast could have a detrimental effect on the properties of the gypsum cast. The objective of this study is to evaluate the impact of various contact time intervals of Alginate impressions & type III dental stone on surface properties of stone cast. Materials and Methods: Time intervals tested were 1hour, 6 hours and 9 hours. Surface properties of stone cast evaluated were surface detail reproduction, hardness and roughness. Surface detail reproduction was determined using cylindrical brass test block in accordance with ISO 1563. Surface roughness was measured by profilometer
... Show More