In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construction activities.
In this research, modeling of time-cost optimization, generating global optimum solution for time and cost problem, and lowering construction time and cost using ant colony optimization algorithm
The aim of the research is to use this technique and to determine the effect of this method in reduce cost per unit of the company. The traditional method used in the company the research sample to determine the indirect costs, the definition of the concepts and characteristics of the method of cost-based activity and the cost method based on time-driven activity and justifications applied to companies. In order to achieve the research objectives, the main hypotheses were formulated. That was represented: (The applied of (TDABC) Time driven activity based costing method in reducing indirect costs, leads reduce cost per unit than the use of the traditional method of allocating indirect costs in the research sample company).&nb
... Show MoreIn order to understand the effect of the number of piles (N), the history response of dynamic pile load in piled raft system and deflection time history of piled raft under repeated impact load applied on the center of piled raft resting on loose sand, laboratory model tests were conducted on small-scale models. The results of experimental work are found to be dynamic load increase with increase height of drop, the measured repeated dynamic load time history on the center of piled raft was close approximately to three a half sine wave shape with small duration in about (0.015 Sec). The maximum peak of impact loads occurs in pile and deflection time history occur after at the time of the peak repeated impact loads, dynamic pile load
... Show MoreIn this work, the performance of the receiver in a quantum cryptography system based on BB84 protocol is scaled by calculating the Quantum Bit Error Rate (QBER) of the receiver. To apply this performance test, an optical setup was arranged and a circuit was designed and implemented to calculate the QBER. This electronic circuit is used to calculate the number of counts per second generated by the avalanche photodiodes set in the receiver. The calculated counts per second are used to calculate the QBER for the receiver that gives an indication for the performance of the receiver. Minimum QBER, 6%, was obtained with avalanche photodiode excess voltage equals to 2V and laser diode power of 3.16 nW at avalanche photodiode temperature of -10
... Show MoreAbstract The success of the system of government in any country needs to have a handle on the amount of power efficiency , capacity , capability and wisdom, Iraq has gone through since its inception through several stages of time, namely: The first stage: which ran from August 23, 1921 until July 14, 1958 and was ruling monarchy (rule of the royal family) and punishing power of political elites both of them and works access to power without taking into consideration the laws and principles of the Constitution, and as a result of the inability of civilian powers and political parties access to power to grant that army officers regulatory and disciplinary specifications as well as possessing arms and overthrow the rule of the minority coup
... Show MoreExperiment was conducted in Baghdad, three factor were used in this research included Two types of Plows included moldboard and disk plows which represented the main plot, Three forward speeds of the tillage was the second factor included 1.85, 3.75 and 5.62 km / h which represented sup plot , and Three levels of Soil Moisture was third factor included 21, 18 and 14 % in all of Vertical and Lateral Plowing Deviation, Practical and specific productivity, actual time for plowing one donam and appearance (goodness) of Tillage represented by the number of clods > 10 cm in silt clay loam soil with depth 22 cm were studied. the experiment was used Split – split plot design under randomized complete block design with three replications and Le
... Show MoreObjective: To identify of the effect of the different concentrations of the special liquid (for mixing the investment, Gilvest)
and mixed with water/powder ratio on setting time of phosphate–bonded investment.
Method and materials: The present study is (60) specimens made from phosphate bonded investment divided into (4)
groups (control and experimental groups), (15) specimens for each group. The Gillmore needle device is used to setting
time of phosphate bonded investment mixed with different concentration of Gilvest and water.
Results: Showed that there is a high significant difference (P<0.01) between each groups in the ANOVA test and a
significant difference (P<0.05) between the group (A) and control group i