Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five construction projects in Iraq have been selected, and the most crucial crisis variables were used for calculating the weights and their importance, using the fuzzy logic inference model to verify the crisis parameters and the extent of their impact in preparation for predicting the mathematical model of public procurement parameters. After the algorithm had been completed, it was noted that the fast, messy genetic algorithm produced a little difference between training and testing (0.012% and 0.0057%), which is more reliable for predicting mean results from models. The paper’s major conclusion is that 18 crisis factors in public procurement through different stages affect construction projects in Iraq.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Fri Jan 01 2021
Journal Name
Professional Safety
Shedding Light on the Concept of Social Equity in SUSTAINABLE CONSTRUCTION
...Show More Authors

Publication Date
Sat Apr 01 2023
Journal Name
Journal Of Engineering
Investigation of Groundwater and The Impact of Over-Pumping in Al-Haydariyah Region, Iraq
...Show More Authors

In this study; a three-dimensional model was created to simulate groundwater in Al-Haydariyah area of the governorate of Al-Najaf. A solid model was created to utilize the cross sections of 25 boreholes in the research region, and it was made out of two layers: sand and clay. The steady-state calibration was employed in six observation wells to calibrate the model and establish the hydraulic conductivity, which was 17.49 m/d for sand and 1.042 m/d for clay, with a recharge rate of 0.00007 m/day. The wells in the research region were reallocated with a distance of 1500 m between each well, resulting in 140 wells evenly distributed throughout the study area and with a discharge of 5 l/s, and the scenarios were run for 1000

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Engineering
Mismanagement Reasons of the Projects Execution Phase
...Show More Authors

The execution phase  of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts.), in order to find the real reasons behind misman

... Show More
View Publication Preview PDF
Publication Date
Fri Sep 30 2022
Journal Name
International Journal Of Intelligent Systems And Applications In Engineering
Optimizing Methods of Funding Residential Complexes Projects
...Show More Authors

Scopus (3)
Scopus
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Scheduling Critical Activities of Stochastic Projects Management
...Show More Authors

In this paper, we consider the problem of stochastic project network when some or all activities are interrupted. An approach has been built to schedule the critical activities, by constructing some expressions based on the project lateness costs due to the interruption activities. Two simple example are presented to validate our approach.

Key words: Project Management, Project scheduling, Stochastic activity duration, Stochastic PERT.    

Introduction

   Recently, Projects planning and optimal timing, under uncertainty are extremely critical for many organizations, see [19]. Having an effective mathematical model wi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Oct 23 2018
Journal Name
Journal Of Economics And Administrative Sciences
“The impact of using the of the Government Finance Statistics Manual (GFSM) on The General Budget in Iraq”
...Show More Authors

This research is aiming  to analyze the impacts of the current budget in Iraq by using  the Government Finance Statistics Manual (GFSM) , the research is based on hypothesis: (There is an impact on the using of the Government Finance Statistics Manual (GFSM) In public budget in Iraq) .This hypothesis was demonstrated by using the questionnaire, a number of conclusions were reached, the most important being the lack of terminology adopted in the government accounting system and the Iraqi financial and accounting manual as a result of their adoption of the monetary basis for the lack of accounting terminology that meets t

... Show More
View Publication
Crossref
Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

  The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs.         All of these arcs are incomplete.         The number of distinct (12,3)-arcs are six, two of them are complete.         There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete.         There exists one complete (15,3)-arc.
 

View Publication Preview PDF
Publication Date
Sun Apr 30 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Sciences
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(9)
...Show More Authors

  In this work, we construct and classify the projectively distinct (k,3)-arcs in PG(2,9), where k ≥ 5, and prove that the complete (k,3)-arcs do not exist, where 5 ≤ k ≤ 13. We found that the maximum complete (k,3)-arc in PG(2,q) is the (16,3)-arc and the minimum complete (k,3)-arc in PG(2,q) is the (14,3)-arc. Moreover, we found the complete (k,3)-arcs between them.

View Publication Preview PDF
Publication Date
Tue Jan 01 2013
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.

Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
The designed housing projects as an alternative for the informal building and their impact in addressing the heterogeneity of the urban escape in the built residential areas
...Show More Authors

The phenomenon of informal building Spread recently in Iraqi residential areas, in general, and in Baghdad, in particular, due to the urgent housing need, on the one hand, and lack of commitment to building controls, on the other hand, to highlight the phenomenon of uncommitted building to controls and housing governing legislation in Iraq, leading to heterogeneity in both building densities and plot areas, and disorder in the urban fabric and urban escape of those areas. Research problem identified as the absence of a clear vision about the General aspects of the phenomenon of informal building in residential street scene, and the role of designed housing projects as a substitute for informal building in built residential areas. The des

... Show More
View Publication Preview PDF
Crossref